Construction Cost Estimate Modeling of Roundabout at Preliminary Design Stage in Jeju

제주도 내 회전교차로의 초기공사비 예측모델 개발

  • 안진홍 (삼부토건(주) 토목부) ;
  • 이동욱 (제주대학교 토목공학과(해양과환경연구소))
  • Received : 2014.04.28
  • Accepted : 2014.06.18
  • Published : 2014.08.01

Abstract

Recently, there are many roundabouts installation works which are ordered to provide convenient transportation to road users as well as to eliminate traffic accidents and traffic delays. This study propose an approximate construction cost estimation model for early stages of roundabout construction. The model is designed considering the conditions of the early stage roundabout construction sites in Jeju. The regression equation of approximate construction cost was derived through regression analysis of 25 design data of roundabout construction in Jeju, and it was analyzed to have a high prediction accuracy. Finally, results verifies high prediction accuracy of the derived regression equation. Difference between the estimation cost and the design cost was only 2.3%, 3.7%, and 5.8% that verifies the high accuracy of the proposed approximate construction cost estimation model.

최근 들어 교통사고 예방 및 교통지체 해소는 물론 도로이용자 교통편의를 제공하는 목적으로 회전교차로 설치공사가 많이 발주되고 있다. 그러나 회전교차로 공사에 대한 개략적인 공사비를 예측하는 기준이나 단가가 정립되어 있지 않을 뿐만 아니라, 회전교차로 공사 초기 단계에서의 공사비 예측에 관한 체계적인 연구가 미흡한 실정이다. 본 연구에서는 현재 제주도내에 설치된 회전교차로를 중심으로 공사현장의 여건을 고려한 공사 초기단계에서 회전교차로공사 개략공사비 산정 모델을 제시하고자 하였다. 본 연구에서는 제주도내 25개 회전교차로공사의 설계자료를 바탕으로 회귀분석을 통해 개략공사비 회귀방정식을 도출하였으며, 매우 예측의 정확도가 높은 것으로 분석되었다. 도출된 회귀방정식에 대해서 검증한 결과 회귀방정식을 통한 추정금액과 설계금액과의 오차율이 2.3%, 3.7%, 5.8%의 차이를 보임으로써 매우 예측의 정확도가 높은 것으로 분석되었다.

Keywords

References

  1. Ahn, S. Y. (2012). Analysis on delay effects of modern roundabouts in Community Zones, Gachon University, Master's Thesis (in Korean).
  2. Jeju Special Self-Governing Province. (2009). Plan of roundabout project for green traffic (in Korean).
  3. Jeju Special Self-Governing Province. (2010). Detailed design for roundabouts' construction project in Jeju (in Korean).
  4. Kim, K. H. (2009). A study on conceptual cost estimating using the case based reasoning for IPC girder bridge, Kyungpook National University, Master's Thesis (in Korean).
  5. Ko, S. I. (2011). Effectiveness analysis for transforming many- legs type intersection into roundabout in Jeju, Jeju National University, Master's Thesis (in Korean).
  6. Lim, W. S. (2008). Framework development of calculation model for construction cost estimation of bridge work (PSC Beam Bridge as the Subject), Chung-Ang University, Master's Thesis (in Korean).
  7. Moon, J. B. (2012). A study on the signal operation of pedestrian crosswalk by using roundabout according to pedestrian volume, Master's Thesis, University of Seoul (in Korean).
  8. Park, H. C. (2011), Analysis of measure of effectiveness at 5-legged roundabouts - Focusing on the Okcheon Pgeori Intersection in Gangneung City, Master's Thesis, Kwandong University (in Korean).
  9. Seo, K. T. (2011). A study on the operational characteristics of multi-legged roundabouts, Master's Thesis, Dankook University (in Korean).