• Title/Summary/Keyword: Construction Contractor

Search Result 395, Processing Time 0.028 seconds

A Study on the Reinforcement of Disaster Prevention for Construction Stakeholders in Korea (국내 건설공사 이해관계자에 관한 재해예방 강화 연구)

  • Ki-Taek Oh
    • Journal of the Society of Disaster Information
    • /
    • v.20 no.1
    • /
    • pp.192-198
    • /
    • 2024
  • Purpose: In order to establish a safety management system led by an orderer in the construction industry, the orderer should be positioned at the peak of the construction industry safety management system and a system that can effectively support safety supervisors who can assist the orderer's role should be reflected. Method: This study collected and analyzed data on the status of safety management of construction business owners through prior research on safety management of construction business owners and a survey on the actual condition of those involved in the construction business. Results: The top priority is to improve the safety awareness and safety management capabilities of the orderer, and through these efforts, the orderer-led safety management system will be established when a national consensus on the responsibility of the orderer, such as the Serious Accident Punishment Act and the Occupational Safety and Health Act, is formed in the event of an accident such as a serious accident. Conclusion: In order to establish a safety management system led by an orderer in the construction industry, it contributes to disaster prevention by positioning the orderer at the peak of the construction safety management system and reflecting a system that can effectively support safety supervisors who can assist the orderer's role.

Development of Safety Management Index for Contractor Assessment in Bidding Process (입찰단계 수급자 평가를 위한 안전경영지수 개발)

  • Ji, Soung-Min;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.3-13
    • /
    • 2011
  • The construction industry is still the most risky industry and labor accident is a significant management factor on construction site. Safety management has been studied for improving the safety performance on construction sites. However, Almost all of them have been considered on the site safety management for the contractors and evaluation of accident rate. To resolve the limitation of current research, this study is focused on considering accident result and effort by performing the evaluation of safety level of the head office and site in construction companies. By studying the research about a safety management and interviewing with specialists in safety management, 7 items were selected and weighted based on the KOSHA18001 List. Consequently, The checklist was developed to evaluate safety performance management in construction company and Safety Management Index was suggested to coordinate 1) the score of results in accident rate and 2) the effort to evaluate a safety performance management. Safety Management Index is more helpful to evaluate the safety management results and effort. As a result of considering the score of the accident rate and the safety performance management, the outcome of prequalification was changed. Using this index, contractors will attempt to prevent accidents and owners will be able to discriminate individual differences in bidding process.

Analysis of Ambivalence Differences among Groups for Temporary Firefighting Facilities of Workers at Construction Sites (공사현장 근로자의 임시소방시설에 대한 집단 간 Ambivalence 차이분석)

  • Moon, Pil-Jae;Kong, Ha-Sung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.7 no.4
    • /
    • pp.765-778
    • /
    • 2021
  • The purpose of this study is to prevent fire accidents in advance by deriving prior knowledge among groups about temporary fire-fighting facilities of workers at construction sites and devising appropriate improvement measures. The findings are as follows.First, in the case of fire extinguishers, statistical attention was paid to the contractor, supervisor, partner worker and fire extinguisher manager between designations. 87% of fire managers and 70% of facility supervisors said fire extinguisher management managers needed to be designated for each type of construction, which requires designation of fire extinguisher management managers, frequently checking and relocating. Second, in the case of simple fire extinguishing facilities, statistical attention was paid to the application of penalties for unauthorized use of fire extinguishing facilities with construction companies, supervisors, and business partners.Third, in the case of emergency alarm measures, statistical attention was paid to the application of emergency alarm sound to temporary broadcasting facilities with construction works, supervisors, and business partners.Fourth, in the case of induction, statistical attention was paid to the application of connection between construction works, supervisors, and partner workers, such as passage guidance, emergency lighting, etc.It was found that 65% of construction workers and 55% of electrical workers had different applications such as aisle guidance and emergency lighting for each type of business partner. In order to resolve blind spots such as evacuation zone guidance due to the structure of the building, it is necessary to easily distinguish the direction of the entrance door from a long distance by applying it in conjunction with passage guidance lights and emergency lighting.

A Study on the Improvement of Safety and Health Activities in the Construction Contractor (Public Institutions) (건설공사 발주처(공공기관) 안전보건활동 수준향상에 관한 연구)

  • Ji-Hwan Moon
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.3
    • /
    • pp.624-633
    • /
    • 2023
  • Purpose: It Vas intended to identify problems and derive improvement plans by grasping the current status of safety management of public institutions among construction Vork orders. Method: By comparing the disaster status of public institutions compared to the total construction Vork, the analysis Vas conducted based on the results of the evaluation of the level of safety activities of public institutions Vith a high disaster rate and the results of actual consulting. Result: As a result of comparing and analyzing the current status of safety management of public institutions, the current status and problems of safety management in public institutions Vith a high accident rate Vere similarly discovered. Safety management organizations, document management systems, safety management systems, and risk assessment activities are operated Vithout reflecting the size and characteristics of the organization, so improvement in the relevant field is needed. Conclusion: Safety-related professionals and organizations should be formed according to the size of construction orders, and responsibility and authority should be clearly assigned. Since risk assessment is conducted formally to prepare a safety and health ledger, it is necessary to derive risk factors to prevent safety accidents for the actual construction. It is expected that the level of safety activities can be improved if it is improved by reflecting the size and characteristics of public institutions.

Analysis of the Influence of Design Score and Price Score for Design Build Bidding (설계시공일괄입찰에서 설계점수와 가격점수의 영향력 분석)

  • Lee, Jinhak;Woo, Sungkwon;Lee, Siwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.5
    • /
    • pp.44-51
    • /
    • 2023
  • Selecting appropriate bidding system in construction projects considering the characteristic of project can be a make-or-break element, so the understanding for bidding system of public construction projects is ever more important from the perspective of both the owner and the contractor. The design-build bidding is commonly referred to as turnkey in Korea, and is a bidding method that is often applied to large public construction projects because it allows new technologies to be applied to the design and facilitates risk management for the owner. In this bidding method, there are only two factors (design score and price score) that affect the selection of the winning bidder, so it is important to understand the influence of each factor, but there is little research on the subject. This study aims to provide a basis for establishing bidding strategies for understanding the influence between design score and price score by analyzing various design-build bidding data of public construction projects. The results of the study show that design score is the factor that has more influence on the ranking of bidders in all three weighted evaluation methods: design-emphasized, price-emphasized, and equalized evaluation. In addition, we found that the correlation between design and price scores was not significant due to the unique bid evaluation structure in Korea.

A Study on How to Cope with the Abusive Call on On-demand Bonds (독립적 보증과 그 부당한 청구에 대한 대응방안 연구)

  • KIM, Seung-Hyeon
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.69
    • /
    • pp.261-301
    • /
    • 2016
  • Recently the abusive calls on on-demand bonds have been a critical issue among many engineering and construction companies in Korea. On-demand bond is referred to as an independent guarantee in the sense that the guarantee is independent from its underlying contract although it was issued based on such underlying contract. For this reason, the issuing bank is not required to and/or entitled to look into whether there really is a breach of underlying contract in relation to the call on demand-bonds. Due to this kind of principle of independence, the applicant has to run the risk of the on demand bond being called by the beneficiary without due grounds. Only where the call proves to be fraudulent or abusive in a very clear way, the issuing bank would not be obligated to pay the bond proceeds for the call on on-demand bonds. In order to prevent the issuing bank from paying the proceeds under the on-demand bond, the applicant usually files with its competent court an application for injunction prohibiting the beneficiary from calling against the issuing bank. However, it is in practice difficult for the applicant to prove the beneficiary's call on the bond to be fraudulent since the courts in almost all the jurisdictions of advanced countries require very strict and objective evidences such as the documents which were signed by the owner (beneficiary) or any other third party like the engineer. There is another way of preventing the beneficiary from calling on the bond, which is often utilized especially in the United Kingdom or Western European countries such as Germany. Based upon the underlying contract, the contractor which is at the same time the applicant of on-demand bond requests the court to order the owner (the beneficiary) not to call on the bond. In this case, there apparently seems to be no reason why the court should apply the strict fraud rule to determine whether to grant an injunction in that the underlying legal relationship was created based on a construction contract rather than a bond. However, in most jurisdictions except for United Kingdom and Singapore, the court also applies the strict fraud rule on the ground that the parties promised to make the on-demand bond issued under the construction contract. This kind of injunction is highly unlikely to be utilized on the international level because it is very difficult in normal situations to establish the international jurisdiction towards the beneficiary which will be usually located outside the jurisdiction of the relevant court. This kind of injunction ordering the owner not to call on the bond can be rendered by the arbitrator as well even though the arbitrator has no coercive power for the owner to follow it. Normally there would be no arbitral tribunal existing at the time of the bond being called. In this case, the emergency arbitrator which most of the international arbitration rules such as ICC, LCIA and SIAC, etc. adopt can be utilized. Finally, the contractor can block the issuing bank from paying the bond proceeds by way of a provisional attachment in case where it also has rights to claim some unpaid interim payments or damages. This is the preservative measure under civil law system, which the lawyers from common law system are not familiar with. As explained in this article, it is very difficult to block the issuing bank from paying in response to the bond call by the beneficiary even if the call has no valid ground under the underlying construction contract. Therefore, it is necessary for the applicants who are normally engineering and construction companies to be prudent to make on-demand bonds issued. They need to take into account the creditability of the project owner as well as trustworthiness of the judiciary system of the country where the owner is domiciled.

  • PDF

Case Study : A Real Options Approach to an Overseas Project Finance Deal (사례연구 : 해외 프로젝트 파이낸스 투자 사례와 실물옵션기반 투자 의사결정)

  • Byun, Jinho;Choi, Moon Sub
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.39 no.5
    • /
    • pp.429-439
    • /
    • 2013
  • The Korean Veterans' Pension Fund has previously pre-purchased Gibril Tower on Business Complex in Dubai, UAE, via a project-financed construction investment. Although the property is near completion, the investor syndicate's attempt to debt-finance due arrears was foiled in Dubai central bank's credit control of real estaterelated loans. Accordingly, the investment coordinator offered an additional capital injection, a collateralized leverage, and a maturity extension to the syndicate. If the syndicate rejects the offer, they may risk a nearcomplete capital loss and a possible default of the main contractor. Otherwise, the syndicate may still face uncertainties regarding interest receivables, principal re-payment, foreclosure, economic recession in Dubai, and the Islamic bond bill in the Korean Parliament. A possible exercise of the latter option may be due to the agency-prone nature of pension fund managers. Given these qualitative risk factors as at April 1, 2011, a real options approach-implied optimal decision suggests an extended and complete cash augmentation into the project finance deal.

A Investigation on the Actual Condition of PV Maintenance on Residental Buildings

  • Lee, Eung-Jik
    • KIEAE Journal
    • /
    • v.14 no.6
    • /
    • pp.53-58
    • /
    • 2014
  • Residental photovoltaic power system achieved remarkable results in distribution and activation through 'One Million Green Homes Program' led by the government. However, system maintenance and management after installation are relative unsatisfactory. Thus, problems, such as malfunctioning, decrease in efficiency, breakage, etc, are occurring in succession which means that expensive facilities are not used effectively. This study attempted to propose a more preferred alternative to the photovoltaic power system currently applied and installed to the housing by investigating and analyzing the said system, identifying management practices, and deriving problems. For this study, 48 houses equipped with photovoltaic systems in J City were chosen and they were analyzed after preliminary research and field investigation. The results revealed that most of the surveyed systems in J City are still in fairly good conditions. But the instruction and information regarding the appropriate operational management of those surveyed systems have not been delivered to the owner. Therefore, promotion education and related manual deployment should be done by the contractor. In terms of installation, inadequate system location and some warranty services are required to be improved, which are usually caused by a lack of careful planning and construction. In addition, the follow-up management needs to be provided about five years later after installation considering system deterioration.

Determination of concrete quality with destructive and non-destructive methods

  • Kibar, Hakan;Ozturk, Turgut
    • Computers and Concrete
    • /
    • v.15 no.3
    • /
    • pp.473-484
    • /
    • 2015
  • In this study, the availability of Schmidt hammer has been investigated as a reliable method to determine the quality of concrete in irrigation networks. For this purpose, the 28-day compressive strength of concrete material used in the construction irrigation channel of Bafra lowland, which is one of the most fertile plains in Turkey was examined by means of concrete compression and as well as concrete Schmidt hammer in laboratory conditions. This study was carried out on cylindrical samples to represent the everyday concrete party ($150m^3$) produced by contractor firm as 3 replications. The statistical analysis of experimental data showed that the correlations between the values of 28-day compressive strength of Schmidt hammer and the rebound number was found to be 0.98. Differences of the compressive strength between compression testing and Schmidt hammer were statistically significant at P<0.01. In this context, it was found that the reliability of compressive strength of the concrete compression test are excellent, also the reliability of compressive strength of Schmidt hammer are fair in assessing the quality of concrete irrigation channels.

A Study on the Design Change of High-Risk Temporary Structures (재해 위험도가 높은 가설구조물의 설계변경에 관한 연구)

  • Oh, T.K.;Kim, Y.G.;Lee, M.G.;Paik, S.W.;Woo, I.S.;Song, C.G.
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.1
    • /
    • pp.37-40
    • /
    • 2014
  • Article 29(3) of Occupational Safety And Health Act, which states a contractor can request a design change to an employer of businesses under the risk condition of construction of temporary structure, was established. Accordingly, in this study, recent fatal accidents caused by temporary structures were analyzed, and the level of inclusion of temporary structures in the design document were examined, and high risk temporary structures were classified. In addition, the requirements of design change of temporary structures were presented, and the qualifications of expert to certify the design change were proposed.