Analyzing the Level and Influence Factors for Work Performance of Field Managers in General Construction Companies (일반건설업체 현장관리자의 직무별 업무수행수준 및 영향요인 분석)

  • Park, Kyoung-Hun;Son, Chang-Baek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.115-124
    • /
    • 2010
  • Along with the recent economic downturn, domestic construction companies have also faced with many difficulties and obstacles. To overcome this situations, now they are trying to continuous efforts to improve efficiency and productivity of project performance through many means including the reduction of fixed cost expenditures. Level of work performance of construction field managers is very important factor of productivity improvement for successive performance of construction project. This study attempts to analyse level and influence factors for work performance of field managers in construction companies through analysis of work burden and level of work performance. Also this study attempts to present basic data of the improvement directions for enhancing construction efficiency and productivity in future.

A Framework on 3D Object-Based Construction Information Management System for Work Productivity Analysis for Reinforced Concrete Work (철근콘크리트 공사의 작업 생산성 분석을 위한 3차원 객체 활용 정보관리 시스템 구축방안)

  • Kim, Jun;Cha, Heesung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.15-24
    • /
    • 2018
  • Despite the recognition of the need for productivity information and its importance, the feedback of productivity information is not well-established in the construction industry. Effective use of productivity information is required to improve the reliability of construction planning. However, in many cases, on-site productivity information is hardly management effectively, but rather it relies on the experience and/or intuition of project participants. Based on the literature review and expert interviews, the authors recognized that one of the possible solutions is to develop a systematic approach in dealing with productivity information of the construction job-sites. It is required that the new system should not be burdensome to users, purpose-oriented information management, easy-to follow information structure, real-time information feedback, and productivity-related factor recognition. Based on the preliminary investigations, this study proposed a framework for a novel system that facilitate the effective management of construction productivity information. This system has utilized Sketchup software which has good user accessibility by minimizing additional data input and related workload. The proposed system has been designed to input, process, and output the pertinent information through a four-stage process: preparation, input, processing, and output. The inputted construction information is classified into Task Breakdown Structure (TBS) and Material Breakdown Structure (MBS), which are constructed by referring to the contents of the standard specification of building construction, and converted into productivity information. In addition, the converted information is also graphically visualized on the screen, allowing the users to use the productivity information from the job-site. The productivity information management system proposed in this study has been pilot-tested in terms of practical applicability and information availability in the real construction project. Very positive results have been obtained from the usability and the applicability of the system and benefits are expected from the validity test of the system. If the proposed system is used in the planning stage in the construction, the productivity information and the continuous information is accumulated, the expected effectiveness of this study would be conceivably further enhanced.

서초프로젝트A 오피스텔 현장의 SHOP DWG

  • Kim, Hyeon-Ung
    • 월간 기계설비
    • /
    • no.11 s.184
    • /
    • pp.57-71
    • /
    • 2005
  • SHOP DWG의 현주소 어디까지 왔는가? 설계에서 제조에 이르는 전 과정을 컴퓨터로 제어하고 관리하는 기술. 캐드(CAD)와 캠(CAM)은 각각 computer-aided design,computer-aided manufacturing의 약칭으로 컴퓨터보조설계와 컴퓨터보조생산을 뜻한다. CAD는 설계도면을 한 장씩 수작업으로 제도하지 않고 설계 데이터베이스의 정보를 CRT(cathode ray tube)에서 화상을 보고 합성하면서 설계하므로 작업을 최적화 할 수 있다. CAD로 설계된 설계도의 내용은 CAM을 통해 NC(수치제어)공작기계에 정확한 작업동작을 지시하게 되며, 작업관리∙가공∙조립∙검사 등의 제조과정을 컴퓨터로 관리하여 작업속도와 제품의 정밀성을 높이게 된다. 최근에는 건축현장의 2D system이 보편화되어 있지만 건축현장의 핵심이라고 할 수 있는 기계설비의 기계실, 또는 조립화 공법 등에는 3차원 CAD∙CAM시스템이 개발되어 입체형상을 화면에 3차원으로 재현할 수 있고, 대상물의 표면적∙부피∙무게∙강도 등의 물리적 성질도 자동 계산하여 최적상태에서 현장의 시공에 적용할 수 있게 되었다. 1960년대 초 미국에서 자동차 모델∙엔진, 항공기 부품 등 의 설계에 수작업의 한계를 느껴 개발되었으며, 한국에서는 70년대 중반에 도입되어 운용되고 있다. 이에 따라 프로그램 회사들은 다양한 방법 등을 SHOP DWG에 적용하여 판매경쟁이 치열하다. (주)우진아이엔에스는 급속한 산업경제의 변화와 무한경쟁시대에 보다 나은 기술개발 투자에도 노력을 기울여, 2000년 11월 용인공장, 생산라인을 천안으로 이전, 확장 하여 배관 및 닥트의 CAD-CAM SYSTEM, P.F.P공법, 기계실3D, 블럭화배관, 닥트자동화 시스템, 설계, 용접공정을 공장화시켰으며, 신 개발품인 S.C.D(SEMI-CON DUCT)를 신설하여 모든 건축물에 맞는 필수적인 제품을 생산함으로써 선택의 폭을 넓히고, 현장 시공능력 효율을 높이고 있다. 이번 호에서는 (주)우진아이엔에스가 95년 설계팀을 발족하여 제로시스템의 3D공법을 공장 및 현장의 SHOP DWG에 적용해왔고 최근에는“서초 프로젝트A”현장에 SHOP DWG의 최대 결집체인 3D활용의 조립화 공법을 적용하여 초고층 오피스텔현장을 시공한 사례를 게재한다. 우진아이엔에스는 30여년의 기술 축척을 바탕으로 최고의 기술력과 풍부한 경험을 통해 아셈무역센타, 타워팰리스1차, 3차 및 목동트라팰리스, 분당트리폴리스, 수원삼성전자 R4, 등 국내굴지의 초고층빌딩 시공을 근거로 초고층의 기본설계를 이해하고 SHOP DWG을 통해서 기계설비공사의 향후 나아갈 지표를 제시하고 있다.

  • PDF

공간공정계획을 이용한 공정별 재해위험율 산정

  • 이규진
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2001.11a
    • /
    • pp.36-41
    • /
    • 2001
  • 건설현장관리에는 설비관리$\cdot$공정관리$\cdot$품질관리$\cdot$원가관리$\cdot$노무관리 등이 있는데 흔히 생산성향상과 원가 절감을 목표로 하는 공정관리와 원가관리의 목적을 달성하기 위해서는 안전관리는 어느 정도 무시되어야 한다고 생각하는 경향이 있다. 그러나 안전관리도 마찬가지로 원가의 절감을 지향하고 생산성 향상을 목표로 하고 있어 제반관리와 분리될 수 없다.(중략)

  • PDF

Quantity Management Model for Manufacturing and Assembly of Large-scale Modular Construction Projects during Construction Phase (대규모 모듈러 건축 프로젝트 현장 시공 시 공장 생산량 및 현장 시공량 관리 모델)

  • Choi, Onekyu;Lee, Hyunsoo;Park, Moonseo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.1
    • /
    • pp.43-53
    • /
    • 2018
  • Modular construction can improve construction quality and accuracy through manufacturing process, and it allow massive production and cost savings by repeatedly producing the same unit. In particular, it is possible to reduce the time because the on-site work and the manufacturing process can be carried out at simultaneously. However, according to the modular construction project survey report, there is no significant difference regarding the average construction period between modular construction and conventional construction. This is due to schedule delay problems that occur during construction phase. Therefore, it is necessary to select alternatives to prevent schedule delay during on-site construction progressing. Especially, in case of large-scale modular construction project, on-site module assembly and manufacturing process are performed concurrently. Hence, identification of alternatives should be done at the co-occurrence by taking both manufacturing and on-site work process in to account. In this research, the management factors of large-scale modular construction project were identified through the IDEF0 modeling, and the quantity management model for manufacturing and assembly is developed. This will reduce the schedule delay problem that occurs in the progression on-site work of a large scale modular construction.

Using Next Generation Technologies to Resolve Construction Labor Shortage Problems (건설기능인력 수급 불균형 문제 해결의 대안 제시)

  • Lee, Bok-Nam;Woo, Sungkwon;Chang, Chul-Ki;Koo, Bon-Sang
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.6D
    • /
    • pp.969-974
    • /
    • 2006
  • Labor shortages are a serious problem for Korea's construction industry. The problem is both quantitative and qualitative. There is a shortage in supply as due to a decrease in the influx of new labor, and existing workers are less productive as they age. The problem will only get worse as more and more major public projects are being planned. Options for increasing the labor supply are somewhat limited, and thus efforts need to be made to adopt new technologies that can improve the productivity and efficiency of field work and their processes. This paper introduces seven innovation technologies that have the best potential to increase productivity and thus reduce the burden of labor shortage problems. These include 1) Substitution by use of robotics and automation, 2) development and applications of Innovative materials to reduce on site field work, 3) increase in productivity through the implementation of Information Technology, 4) improved productivity through the application of modules, and prefabrication, 5) prevention of rework and redesign, 6) diversification of labor by integrating labor skills, and 7) improved productivity by standardizing site processes.

A Comparative Analysis of Status on the Selection and Evaluation of Field Manager in Apartment and Office Building Project (공동주택과 오피스 건설현장의 조직원선정 및 평가실태 비교분석)

  • Lee Jung-Yong;Kim Byeong-Lae;Son Chang-Baek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.290-293
    • /
    • 2003
  • The field organization management in construction industry is very important factor improvement and cost reduction. But, until now, evaluation methods on the existing field organization did not make ready and endeavor of organization betterment was insufficient in construction industry. The purpose of this study to provide basic data for reasonable selection and evaluation of the field manager through analyzing operation status of the existing field organization in apartment and office building project by interview and questionnaire on the 22 construction companies. This study presented optimal proposal on the selection and evalution of field manager for productivity improvement and cost reduction by means of efficient construction progress in apartment and dffice building project.

  • PDF

레디믹스트콘크리트 현장배치플랜트 설치 및 관리에 관한 지침

  • 한국주택협회
    • 주택과사람들
    • /
    • no.47 s.64
    • /
    • pp.83-90
    • /
    • 1995
  • 건설기술관리법 제24조의 2 및 동법시행령 제47조의 3의 규정에 의한 품질시험 실시 대상 건설자재인 레디믹스트콘크리트에 대하여 당해건설공사의 품질을 철저하게 확보함과 동시에 적기공급을 도모하기 위해서 시공자가 현장배치플랜트를 설치하여 직접 생산${\cdot}$사용하는 경우 당해시공자 및 레디믹스트콘크리트 전문제조업자가 준수하여야 할 지침을 다음과 같이 고시합니다.

  • PDF

Decision Making Model for Application of Manufacturing Production System in Construction Project (건설 구조물의 공장생산방식 적용 의사결정모델에 관한 연구)

  • Jin Eui-jae;Park Sang-hyuk;Chae Myung-jin;Han Seung-hun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.515-520
    • /
    • 2004
  • Manufacturing Production System (MPS) has been widely accepted in construction area for the productivity improvement. However, the MPS does not always provide cost and time saving. It often caused more delays and increased project cost. Therefore the use of the MPS technique, systematic decision-making process is needed by reviewing various project parameters such as cost and time. This study includes extensive literature reviews and case studies on MPS. As a result, a decision-making model is proposed. The decision-making flowchart and decision-making model are developed in three steps: (1) identification and categorization of decision-making factors; (2) calculations of benefits, cost, and duration in accordance with the location and the production capacity of the factory; (3) comparisons of MPS and on-site assembly by varying the locations and sizes of the factory