Quantity Management Model for Manufacturing and Assembly of Large-scale Modular Construction Projects during Construction Phase  

Choi, Onekyu (Department of Architecture and Architectural Engineering, Seoul National University)
Lee, Hyunsoo (Department of Architecture and Architectural Engineering, Seoul National University)
Park, Moonseo (Department of Architecture and Architectural Engineering, Seoul National University)
Hyun, Hosang (Department of Architecture and Architectural Engineering, Seoul National University)
Publication Information
Korean Journal of Construction Engineering and Management / v.19, no.1, 2018 , pp. 43-53 More about this Journal
Abstract
Modular construction can improve construction quality and accuracy through manufacturing process, and it allow massive production and cost savings by repeatedly producing the same unit. In particular, it is possible to reduce the time because the on-site work and the manufacturing process can be carried out at simultaneously. However, according to the modular construction project survey report, there is no significant difference regarding the average construction period between modular construction and conventional construction. This is due to schedule delay problems that occur during construction phase. Therefore, it is necessary to select alternatives to prevent schedule delay during on-site construction progressing. Especially, in case of large-scale modular construction project, on-site module assembly and manufacturing process are performed concurrently. Hence, identification of alternatives should be done at the co-occurrence by taking both manufacturing and on-site work process in to account. In this research, the management factors of large-scale modular construction project were identified through the IDEF0 modeling, and the quantity management model for manufacturing and assembly is developed. This will reduce the schedule delay problem that occurs in the progression on-site work of a large scale modular construction.
Keywords
Modular Construction; Decision-making; Change Management; Construction Management;
Citations & Related Records
Times Cited By KSCI : 5  (Citation Analysis)
연도 인용수 순위
1 Kim S. H., Kim G. H., and Kang K. I. (2004). "A Study on the Effective Inventory Management by Optimizing Lot Size in Building Construction." Journal of the Korea Institute of Building Construction, 4(2), pp. 73-80.   DOI
2 Kim T. Y., Park M. S., Lee H. S., Seo S. U., Lee J. H. and Kim S. Y. (2013). "Optimization Methodology of Modular Unit Factory Production Process Using DSM" Journal of Architecture Institute of Korea, 29(6), pp. 113-122.
3 Kim, M., Park, M., Lee, H. S., Lee, J., and Lee, K. P. (2015). "Development of Manufacturing Planning for Multi Modular Construction Project based on Genetic-Algorithm." Korean Journal of Construction Engineering and Management, KICEM, 16(5), pp. 54-64.   DOI
4 Kim M. J., Lee H. K, and Kim J. J. (2006). "An Analysi s of Cost Management Process Using IDEF0." Journal of Architecture Institute of Korea, 22(4) pp. 177-185.
5 Ko, H. U., and Park, H. K. (2009). "A Study of Development of Change Process for Configuration Management in Construction Project Management." Journal of the Korean Society of Civil Engineers, 29(1D), pp. 81-89.
6 Lawson, M., Ogden, R., and Goodier, C. (2014). "Design in modular construction." CRC Press.
7 Lee. H. S., Song S. H., and Kim U. Y. (2002). "Process Redesign for Material Management by Analyzing Information." Journal of Architecture Institute of Korea, 18(11), pp. 125-132.
8 Lee J. H. (2017). "Planning and Control of Modular Building Construction Projects Using Discrete Event Simulation." Doctoral thesis, Department of Architecture and Architectural Engineering The Graduate School of Seoul National University.
9 Mullens, M. A. (2011). "Factory Design for Modular Homebuilding: Equipping the Modular Factory for Success." Constructability Press.
10 Kang, S. O. (2007). "A Study on the process analysis and setting up normal duration of large scale military modular building" MS thesis, Mokwon University, Korea.
11 Hao, Q., Shen, W., Neelamkavil, J., and Thomas, R. (2008). "Change management in construction projects." NRC Institute for Research in Construction, NRCC-50325.
12 Lu, N. (2009). "The current use of offsite construction techniques in the United States construction industry." In Construction Research Congress 2009: Building a Sustainable Future, pp. 946-955.
13 Naoum, S. G. (1994). "Critical analysis of time and cost of management and traditional contracts." Journal of Construction Engineering and Management, 120(4), pp. 687-705.   DOI
14 Pinto, J. K., and Kharbanda, O. P. (1995). "Lessons for an accidental profession. Business Horizons." 38(2), pp. 41-50.   DOI
15 Stickel, B. S. R. E. (1996). "Business Process Modelling." Springer-Verlag, 319, 1.
16 Shin H. K., and Ahn Y. H. (2016). "Modular Building Construction Process Development by Benchmarking International Best Practices." Korean Journal of Construction Engineering and Management, KICEM, 17(6), pp. 3-12.   DOI
17 Yun, J. S., Yu, J. H., and Kim, C. D. (2011). "Economic Order Quantity (EOQ) Determination Process for Construction Material considering Demand Variation and Stockyard Availability." Korean Journal of Construction Engineering and Management, KICEM, 12(1), pp. 33-42.   DOI
18 Smith, R. E. (2010). "Prefab Architecture." A guide to modular design and construction.
19 Thomas, H. R., and Sanvido, V. E. (2000). "Role of the fabricator in labor productivity." Journal of construction engineering and management, 126(5), pp. 358-365.   DOI
20 Velamati, S. (2012). "Feasibility, benefits and challenges of modular construction in high rise development in the United States: a developer's perspective." Doctoral thesis, Massachusetts Institute of Technology.
21 Cho, B. H., Kim, H. J., and Ko, G. H. (2007). "The state of art in the modular construction in Korea." Journal of Korean Society of Steel Construction, 19(1), pp. 112-119.
22 Zhao, Z. Y., Lv, Q. L., Zuo, J., and Zillante, G. (2009). "Prediction system for change management in construction project." Journal of Construction Engineering and Management, 136(6), pp. 659-669.   DOI
23 Alvanchi, A., Azimi, R., Lee, S., AbouRizk, S. M., and Zubick, P. (2011). "Off-site construction planning using discrete event simulation." Journal of Architectural Engineering, 18(2), pp. 114-122.   DOI
24 Andras M. (2015). "The Lure of Modular Construction-Assessing the Advantages and Risks." IPA Newsletter.
25 Carlson, D. O. (Ed.). (1995). "Automated builder: dictionary/encyclopedia of industrialized housing." Automated Builder Magazine, Publications Division, CMN Associates.
26 Cho, J., Jang, O., Yu, J., and Lee, M. J. (2014). "Development of Change Management System for Urban Development Project." Korean Journal of Construction Engineering and Management, KICEM, 15(2), pp. 79-86.   DOI
27 Giaglis, G. M. (2001). "A taxonomy of business process modeling and information systems modeling techniques." International Journal of Flexible Manufacturing Systems, 13(2), pp. 209-228.   DOI
28 Hammer, M., and Champy, J. (2009). "Reengineering the Corporation: Manifesto for Business Revolution." A. Zondervan.
29 Hofman, E., Voordijk, H., and Halman, J. (2009). "Matching supply networks to a modular product architecture in the house-building industry." Building Research and Information, 37(1), pp. 31-42.   DOI
30 Im, K. S., Han, S. H., Jung, D. Y., Ryu, C. K., and Choi, S. J. (2008). "Inventory Management in Construction Operations Involving on-site Fabrication of Raw Materials." Korean Journal of Construction Engineering and Management, KICEM, 9(1), pp. 187-198.