A Framework on 3D Object-Based Construction Information Management System for Work Productivity Analysis for Reinforced Concrete Work  

Kim, Jun (Department of Architectural Engineering, Ajou University)
Cha, Heesung (Department of Architectural Engineering, Ajou University)
Publication Information
Korean Journal of Construction Engineering and Management / v.19, no.2, 2018 , pp. 15-24 More about this Journal
Abstract
Despite the recognition of the need for productivity information and its importance, the feedback of productivity information is not well-established in the construction industry. Effective use of productivity information is required to improve the reliability of construction planning. However, in many cases, on-site productivity information is hardly management effectively, but rather it relies on the experience and/or intuition of project participants. Based on the literature review and expert interviews, the authors recognized that one of the possible solutions is to develop a systematic approach in dealing with productivity information of the construction job-sites. It is required that the new system should not be burdensome to users, purpose-oriented information management, easy-to follow information structure, real-time information feedback, and productivity-related factor recognition. Based on the preliminary investigations, this study proposed a framework for a novel system that facilitate the effective management of construction productivity information. This system has utilized Sketchup software which has good user accessibility by minimizing additional data input and related workload. The proposed system has been designed to input, process, and output the pertinent information through a four-stage process: preparation, input, processing, and output. The inputted construction information is classified into Task Breakdown Structure (TBS) and Material Breakdown Structure (MBS), which are constructed by referring to the contents of the standard specification of building construction, and converted into productivity information. In addition, the converted information is also graphically visualized on the screen, allowing the users to use the productivity information from the job-site. The productivity information management system proposed in this study has been pilot-tested in terms of practical applicability and information availability in the real construction project. Very positive results have been obtained from the usability and the applicability of the system and benefits are expected from the validity test of the system. If the proposed system is used in the planning stage in the construction, the productivity information and the continuous information is accumulated, the expected effectiveness of this study would be conceivably further enhanced.
Keywords
Productivity Information; Information I/O; 3D Object Model; Work Productivity Analysis;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 Na, K. S., Kim, T. H., and Kim, S. K. (2003). "A Study on Development of Project Management System with Daily Report." Annual Conference of the Architectural Institute of Korea, 1(23), pp. 459-462.
2 Oh, S. W., Kim, M. H., and Kim, Y. S. (2006). "The Application of Data Warehouse for Developing Construction Productivity Management System." Korean Journal of Construction Engineering and Management, KICEM, 7(2), pp. 127-138.
3 Rowings, J. E., and Sonmez, R. (1998). "Construction Labor Productivity Modeling with Neural Networks." Journal of Construction Engineering and Management, 124(6), pp. 498-504.   DOI
4 Russell, D. A. (1993). "Computerized Daily Site Reporting." Journal of Construction Engineering and Management, 119(2), pp 385-402.   DOI
5 Shin, D. W., and Park, C. S. (2000). "An Analysis of Preparation and Evaluation Practice of Building Construction Plan Documents at the Bidding Stage." Journal of the architectural institute of Korea : Structure & construction, 16(6), pp. 95-103.
6 Shin, W. S., Lee, D. E., and Son, C. B. (2013). "Analyzin g the Operational Conditions on Daily Work Report of Specialty Contractor and Its Improvement Measure." Journal of the architectural institute of Korea : Structure & construction, 29(11), pp. 91-99.
7 Song, L., and AbouRizk, M. S. (2008). "Measuring and Modeling Labor Productivity Using Historical Data." Journal of Construction Engineering and Management, 134(10), pp. 786-794.   DOI
8 Tserng, H. P., Ho, S. P., and Jan, S. H. (2014). "Developing BIM-assisted as-built schedule management system for general contractors." Journal of Civil Engineering and Management, 20(1), pp 47-58.   DOI
9 Komori, K. (1990). "On-site labour information control systems." Habitat International, 14(2-3), pp. 217-225.   DOI
10 Cox. S., Perdomo, J., and Thabet, W. (2002). "Construction Field Data Inspection Using Pocket PC Technology." International Council for Research and Innovation in Building and Construction CIB w78 Conference.
11 Kis, K. P., Mani, N., Rojas, E. M., and Foster, E. T. (2016). "A Case Study on Estimating Optimal Labor Productivity." Construction Research Congress 2016 : Old and New Construction Technologies Converge in Historic San Juan, pp. 1762-1771.
12 Kim, H., and Ahn, H. (2011). "Temporary Facility Planning of a Construction Project Using BIM (Building Information Modeling)." International Workshop on Computing in Civil Engineering 2011, pp. 627-734.
13 Chung-Wei, F., Yi-Jao, C., and Huang. J. R. (2009). "Using the MD CAD model to develop the time-cost integrated schedule for construction projects." Automation in Construction, 19(3), pp. 347-356.   DOI
14 Lee, D., Cha, H., Kim, K., Shin, D. (2015). "Developmen t of BIM-based Construction Document Information Database Structure through the Link to the BIM Model and Construction Document Inoformation." Korean Journal of Construction Engineering and Management, KICEM, 16(6), pp. 42-54.   DOI
15 McCullouch, G. B., And Gunn, P. (1993). "Construction Field Data Acquisition with Pen-Based Computers." Journal of Construction Engineering and Management, 119(2), pp 374-384.   DOI
16 Shin, Y. S., Kim, D. W., Kim, T. Y., and Kim, G. H. (2016). "Daily Reporting System using Digital Pen at Construction Site." Journal of The Kora Institute of Building Construction, 16(2), pp. 177-183.   DOI
17 Baek, S. H., and Kim, K. R. (1999). "A Conceptual Model for Project Management Information System Using Project Breakdown Structures." Annual Conference of the Architrctural Institute of Korea, 6(15), pp. 167-176.
18 BuildingSMART (2017). .
19 Cho, H. H., and Kang, K. I. (2001). "Development of project management system based on daily report for historical data acquisition and storage." Journal of the architectural institute of Korea : Structure & construction, 17(11), pp. 123-130.
20 Choi, J. M., and Kim, U (2004). "A Study on the Development of the human resource management system using a Daily Report Information." Annual Conference of the Architrctural Institute of Korea, 2(24), pp. 1179-1182.