• Title/Summary/Keyword: 해외건설 프로젝트

Search Result 130, Processing Time 0.023 seconds

Proposal for Developed Procurement and Material management System On Using Previous System Analysis in Plant Engineering (플랜트 구매조달 및 자재관리 시스템 개발 요구사항 분석을 통한 개발 방향 제시)

  • Lee, Seung-Hun;Kim, Sun-Kuk;Lee, Jun-Bok;Han, Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.204-209
    • /
    • 2006
  • Despite the recent depression of the construction industry, overseas plant market especially Middle East plant market is booming owing to the high oil price. Since many Middle Eastern countries are placing orders of big scale projects based on the high oil price, Korean EPC contractor are trying to get over the depression through theses plants. Presently, since the plant market is in prosperous condition in general, it is not hard to get overseas orders; however the original licenses that requirehigher technology and high added values are exclusive for advanced engineering companies which great difficulty is predicted for developing countries like us to join the crowd. Therefore, the objective of this study is to propose establishment of material management system on the filed to gain optimized effect of material management in connection with procurement system that all the procurement related personals execute tasks in advanced level by systemizing the task operation within the knowledge and task ability in time for plant construction procurement as a method to strengthening the competitiveness of Korean companies.

  • PDF

Problem Analysis and Improvement Strategy for Feasibility Analysis of Overseas Plant Construction Projects (해외 플랜트 건설사업의 타당성 분석 문제점 및 개선방안)

  • Lee, Won-Gyu;Park, Moon-Sun;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.5
    • /
    • pp.3-14
    • /
    • 2010
  • This study investigated and analyzed feasibility analysis case studies, carried out by contractor of EPC LSTK projects in the planning stage to suggest the strategies to solve problems for project improvement. For this, five feasibility analysis case studies of gulf cooperation council (GCC) countries were reviewed and investigated. The results can be summarized as follows: 1) Those factors needed to be analyzed, including cost increase, project delay, quality decrease were insufficiently considered when assessing feasibility. 2) And improvement strategies for three problems mentioned above were suggested based on findings in feasibility analysis. 3) Lastly the process of the project feasibility analysis that can be applied to overseas plant construction project was suggested step by step.

Analysis of the Procurement Management Process for the Gas & Oil Plant projects (Gas & Oil 플랜트 조달관리 프로세스 분석)

  • Won, Seo-Kyung;Kang, Min-Woo;Lee, Jun-Bok;Kim, Sun-Kuk;Han, Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.491-494
    • /
    • 2007
  • Recently Gas & Oil plant construction projects are increasing in the world. The EPC (Engineering, Procurement and Construction) company, which participate in the plant projects, should possess the pertinent engineering license and procurement skill to create high added-value. It is because the procurement is very substantial to cover 70% of the total project cost. Nonetheless, there exist various risks involved in the procurement process due to the characteristics of the construction projects with long duration and complicated process as well as the procured goods or services subjected to various logistics. The objective of this paper is to analyze proper process in the procurement and to identify various information and document. Also to analyze procurement process, the principal data are derived from the interview with experts and specialty contractors of plant project. The result of this study would widely be used as a guide to the procurement personnel in forecasting the risks in advance.

  • PDF

Strategies for Balancing the Competitiveness between Engineering and Construction in the Korean Infrastructure Industry (국내 토목산업의 설계-시공 균형발전 방안 도출에 관한 연구)

  • Lee, Kang Wook;Han, Seung Heon;Park, Hyung Keun;Chin, Kyung Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.1
    • /
    • pp.347-354
    • /
    • 2013
  • In the recent global construction environment, EPC contracts that integrate planning, design, procurement, and construction have been widely used for industrial facilities. Similarly, as the importance of the engineering capability such as project management consulting(PMC) and front end engineering design(FEED) has been increased, design-build contracts also have been gradually adopted for infrastructure projects. Whereas, the Korean infrastructure industry has fragmentary features which mainly emphasize on the construction sector. Therefore, this study aims at developing strategies for enhancing the engineering capability and for balancing the competitiveness between engineering and construction sectors in the Korean infrastructure industry. To this end, the authors first carried out market analysis for both global and domestic market. Then, a structured survey and expert in-depth interviews were sequentially performed in order to reflect practitioners' perspectives and needs for institutional strategies. As a result, five strategies drawn from this study are as follows: 1) rearranging the government's roles for supporting the engineering sector; 2) establishing institutional bases being compatible with global standards; 3) fostering value-added workforce for undertaking complex tasks; 4) constructing an consortium between an engineering association and general contractors; and 5) building a nationwide collaborative networks for overseas market expansion.

A Study on the Modeling of Three-Dimensional Work Structure Using Web 3D in Cyberspace (Cyberspace에서 Web 3D를 이용한 3차원 공사 구조물 모델링의 활용성 제언)

  • Lee Hui-Chul;Lee Tai-Sik;Kim Young-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.531-534
    • /
    • 2002
  • Complexity in construction projects has increased over the years, which has led to an increase in the number of organizations involved in those projects. In today's environment, these organizations operate in different parts of the world requiring their personnel to be geographically distributed. So, these organizations construct and utilize the information systems. However, looking into this systems' content, those use two-dimensional planes such as pictures and drawings to check the scheduling etc., which cause the defect of communication and problems such as change order. Accordingly, this study introduces the Web 3Ds and 3D Libraries, intends to present the effect on modeling of three-dimensional work structure using Web 3D in cyberspace.

  • PDF

Establishment of Critical Work Models through the Evaluation of Technology Competitiveness (산업설비 기술수준 평가를 통한 주요업무 도출 및 모델 구축방안 연구)

  • Park Su-Hyun;Ha Seung-Ho;Kim Kyong-Min;Park Chan-Hyuk;Kim Kyong Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.526-530
    • /
    • 2004
  • The portion of plant industry has increased within construction market. In spite of plant industry is dynamic field which leads state-of-the-art and creates a value, phased information management and knowledge intensive business accomplishment are insufficient. Henceforth plant is expected to demand increment of industrial project from hereafter international plant industry market. The continuous plan technique and know-how accumulation are urgent from domestic. 1'his research analyzes the areas in which domestic plant industry is insufficient and then elicits project management key success factors from current operation process. In addition, this research compares domestic plant level with overseas plant level. This study establishes work models for critical work phases based on the analysis of domestic plant technical level.

  • PDF

Business Growth Strategy with Asset Backed Short Term Bond for Overseas IPP Opportunities (자산담보부 단기사채를 활용한 해외발전사업 수주확대방안)

  • Kim, Joon-Ho;Moon, Yoon-Jae;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.11 no.1
    • /
    • pp.30-38
    • /
    • 2015
  • This study is about whether the new Project Finance scheme called "Asset Backed Short Term Bond(ABSTB)" with Project Finance Guarantee Cover provided by Korean Exim Bank(KEXIM) is an appropriate and valid financing structure, through close examinations on domestic and overseas IPP case studies. This study clearly indicates that (i) the interest rate of ABSTB with KEXIM's Project Finance Guarantee is relatively more competitive than the interest rate of other ABSTB guaranteed by EPC Companies (ii) the lower credit rated EPC companies make higher ROE(Return on Equity) through this financing structure. Lastly, Korean EPC Companies can secure profitability through this innovative financing scheme which will also lead to winning more power plant Contracts and become globally competitive.

  • PDF

The Present Status and Vision of Virtual Construction System Development (가상 건설 시스템 개발 현황과 비전)

  • Kim, Jae-Jun;Choi, Cul-Ho;Shin, Hyun-Mok;Jin, Sang-Yoon;Lee, Kwang-Myung
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.170-175
    • /
    • 2008
  • The research team for the virtual construction development was established with the support of Korea Ministry of Construction and Transportation, and KICTEP (Korea Institute of Construction and Transportation Technology Evaluation and Planning). Its aims are to develop system that is to improve productivity & quality, to create a higher value-added business, and to cultivate international competitiveness in the construction industry. The virtual construction system is a design, engineering, and construction management information system that allows the project participants to effectively share the information throughout the construction life cycle with the support of 3D and design information. To achieve this, the research team focuses on developing several systems. First, the team focuses on developing for the pre-planning, the structural engineering, MEP, and the 3D based estimation system. Second, they focus on developing a simulation system for the construction process planning and feasibility study with help of the virtual reality technologies. Third, they focus on developing the CPLM (Construction Project Life-cycle Management) system for managing construction project data, and the decision support system that makes the collaboration among the project participants based on 3D technologies and information. We also focus on developing the SDAI (Standard Data Access Interface), the localized guideline for 3D design, and a training program. In addition, we focus on developing the undeveloped area of the commercial system and building an environment that can support the communication and collaboration in the construction life-cycle rather than developing the existing and commercialized system.

  • PDF

A Study on Procurement Information Management Model through the Analysis of Industrial Engineering Process (산업설비분야의 업무분석을 통한 구매관리 정보모델에 관한 연구)

  • Lee, Jung-Woo;Hwang, Doo-Won;Song, Young-Woong;Choi, Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.567-570
    • /
    • 2006
  • Recently because of rising of international oil prices, plant industry market has been active and purchase orders of big project are tending upwards. For strengthening of overseas plant competitive power and successful project operating, it is essential the project management technology and method. but procurement management of plant industry has evaluated uncompetitive. In this study, we analyzed the process of procurement founded and main contents and information. we study flowing of procurement information. user and creation time though detailing procurement information, then, we suggest the Contents Classification System and Management Model of Procurement Information.

  • PDF

A Study on the Success Model for Design-Build Delivery Method Process (설계시공일괄방식 프로세스 성공모델에 관한 연구)

  • Kim Jeong-Hoon;Koo Kyo-Jin;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.119-127
    • /
    • 2003
  • Among project delivery methods, Design-Build method is becoming an increasingly preferable alternative to traditional contracting method. The Design-Build delivery method was first introduced in Korea, 1975. But it still has been producing many problems. The previous researches had been suggested several ways to improve the Design-Build project delivery but it seemed to have had no effect whatsoever. This research proposes the success model for Design-Build delivery method through the 4 steps. First, find the proper modeling method. Second, establish the As-Is model for analyzing the circumstances of Design-Build method. Third, to begin with analyzing the As-Is Design-Build model and previous researches, establish the problem model. Finally, find success factors and circumstances through the overseas Design-Build system, and then establish the success Design-Build model.