Browse > Article

A Study on the Success Model for Design-Build Delivery Method Process  

Kim Jeong-Hoon (서울시립대 대학원 건축공학과)
Koo Kyo-Jin (서울시립대 건축공학과)
Hyun Chang-Taek (서울시립대 건축공학과)
Publication Information
Korean Journal of Construction Engineering and Management / v.4, no.3, 2003 , pp. 119-127 More about this Journal
Abstract
Among project delivery methods, Design-Build method is becoming an increasingly preferable alternative to traditional contracting method. The Design-Build delivery method was first introduced in Korea, 1975. But it still has been producing many problems. The previous researches had been suggested several ways to improve the Design-Build project delivery but it seemed to have had no effect whatsoever. This research proposes the success model for Design-Build delivery method through the 4 steps. First, find the proper modeling method. Second, establish the As-Is model for analyzing the circumstances of Design-Build method. Third, to begin with analyzing the As-Is Design-Build model and previous researches, establish the problem model. Finally, find success factors and circumstances through the overseas Design-Build system, and then establish the success Design-Build model.
Keywords
Design-Build delivery method; IDEFO Function Modeling Method; Fish-bone diagram; General System Theory(GST);
Citations & Related Records
연도 인용수 순위
  • Reference
1 Design-Build Institute of America, 'The DesignBuild Process'. 1996. 4
2 건설교통부, 건설기술연구원 '턴키제도 시행성과와 장기발전 전략연구', 2001
3 Knowledge Based System, Inc., 1998, 'IDEF Family of Methods for Concurrent Engineering and Business Re-engineering Applications', KBSI
4 김성태 '우리나라 첨단정보산업단지 활성화 모형과 전략요인분석연구 : 외국사례의 Fish- bone Analysis', 한국정책학회보, 2000
5 The California Department of Industrial Relations, 'Pre-Qualification of Contractors Seeking to Bid on Public Works Projects', 1999
6 건설교통부, '턴키. 대안입찰제도 업무요령', 2000
7 국토연구원 '정부공사 발주제도의 다양화 방안 연구', 2002
8 허범, 유훈 외 '정 책학개론', 법문사, 1976
9 The California Department of Education, 'AB 1402 Design-Build Project Guidoline', 2002
10 건산원 '턴키발주공사의 효율적 추진전략', 1998
11 이규재 '턴키 방식 프로젝트의 기술경쟁력 강화방안에 관한 연구', 서울대학교 대학원 건축학과 석사학위 논문, 1996