Korean Journal of Construction Engineering and Management
/
v.11
no.3
/
pp.134-144
/
2010
In China, the enhancement of water services has become the most crucial issue confronted with the rapid urbanization and industrialization process. A huge financial gap to meet the demand for water infrastructure and need for adopting advanced operation technology precipitated the rapid growth of PPP over the last 10 years. Diverse schemes of PPP such as TOT, Divestiture, and Management Contract and Lease have been practiced. Local governments and private investors/operator have adjusted their objectives and strategies to avoid potential pitfalls behind BOT projects in China. However, current academic research outcomes do not properly reflect important issues of BOT projects or related case studies in China. This limitation has brought in the lack of assessment of important risks and success factors required for the improvement of the body of risk management. In this regard, this study uses the market analysis method to identify major schemes of PPP water projects and conducts case studies on five PPP projects to identify key risk and success factors in association with each different scheme. It is expected that the risk and success factors identified from the cases will be used as reference to Korean companies which plan to enter the Chinese water market.
Korean Journal of Construction Engineering and Management
/
v.11
no.3
/
pp.23-32
/
2010
Construction Projects have mutual collaborative structures among various participants for common objectives. Most of all the design project which is the initial phase in the project is crucial for determining project overall quality and requires intimate and continuous relations between project participants. Thus, this study suggests Design Collaboration Management System for successful performing projects through cooperation among participants in the initial stage of projects. First, expert interviews were performed to figure out present conditions of design collaboration management and problems. The factor analysis was applied to draw owner's collaboration factors and engineer's collaboration factors. Based on those factors, this study suggests design cooperation management process which gives a framework for systematic management method. Through the process the design collaboration management system was developed which helps owner/designers/engineer's co-work. The System suggested from this study realizes systematic information management tool and through that it is expected to improve design product;'s quality, and further contribute the advancement of project.
Lim, Hyunsu;Seo, Junghoon;Yoo, Wi Sung;Kim, Chang-Won
Journal of the Korea Institute of Building Construction
/
v.22
no.2
/
pp.207-218
/
2022
Changes in megatrends occurring within the spatial range of the production process can be critical factors that affect the performance of unit projects in construction industry, one of the representative order industries. Although changes in the megatrend are a prerequisite for successful performance achievement, previous studies suggested methods for performance measurement and management within the production process as major results. Accordingly, this study analyzed the megatrend related to domestic construction projects and presented critical impact factors(CIFs) that can be affect a project's performance. CIFs were set by combining keywords derived by reviewing major contents of related laws and policies and future strategy reports, and the importance of each indicator was quantitatively analyzed using analytic hierarchy process(AHP). It is expected that the findings of this study can provide meaningful basic data that the various stakeholders in a construction project can refer to when establishing the strategies to achieve successful performance.
This research provides the solution of defect problem and detection of defect and its causes that happen on software development. For developing a reliable software, a key factor is to find and manage defects that are during software development. Based on defect items analysis, we understand associated relation between defects and design defect opportunity tree. Developing the similar project, we can estimate defect and prepare to solve defect by using defect management opportunity tree.
각 분야에서 최고를 자랑하는 전사적자원관리(ERP), 공급망관리(SCM), 고객관계관리(CRM), 지식관리(KM) 등의 솔루션을 도입하더라도 개별 솔루션만으로 모든 부분을 만족시킬 수는 없다. 이에 대한 대안으로 이들 솔루션들과 기존의 분산 환경 및 메인 프레임 환경을 통합하는 전사적인 기업애플리케이션통합(EAI)이 대두되고 있다. 본 연구는 주식회사 대교의 전사 기업애플리케이션 통합(EAI) 구축사례에 대한 분석을 통하여 EAI 추진방법 및 구성 그리고 주요성공요인들을 제시하였다. 본 연구에서 제시한 내용들에 대하여 구체적으로 살펴보면 첫째, EAI 프로젝트의 추진목표, 전략, 추진조직 및 추진방법론, 둘째, 구현된 EAI 구성 및 특징, 셋째, EAI 구축성과 및 주요성공요인 등이다. 본 연구는 향우 EAI을 도입할 기업에게 EAI 구축과 관련한 유용한 자료가 되도록 하였다.
Journal of the Korea Academia-Industrial cooperation Society
/
v.16
no.7
/
pp.4897-4911
/
2015
Technology developments accelerate the change of the society and companies with unparalleled pace, so large scaled projects are in progress urgently. Large scaled projects deal with high technologies and massive tasks, and these need enormous labor force and costs, it is necessary to manage strategic conflicts based on human psychology and complex system theory. However, traditional management plan fails to suggest practical mechanism for successful projects. We study failure cases and key elements, leadership for projects, and suggest project management plan with psychological and behavioral economy approach by focusing on complexity and conflict structure on large scaled projects. Project behavior management plan, suggested in this study, is designed with phased strategy and practice to solve the failure of large scaled IT projects originally and preemptively. We verified the effectiveness of behavior management plan suggested by investigating experts and working groups, and stable projects are to be progressed with introducing this plan on large-scaled projects.
Asia-Pacific Journal of Business Venturing and Entrepreneurship
/
v.8
no.3
/
pp.85-96
/
2013
Entrepreneurship courses and programs in Korean universities tend to increase steadily but seem to have some limitations. They are usually recognized as another domain of Business Administration. Entrepreneurship program is practical like Business Administration but should be much more interdisciplinary than that. Because Korean Entrepreneurship programs are in the early stage, they must be reinforced with factors such as education culture, faculties, curriculum and relationships with communities. This study aims to get some implications from Entrepreneurship programs have been run by universities in America in order to facilitate Entrepreneurship program in Korean universities. Based on 11 success factors found by our case universities' Entrepreneurship programs and Kauffman Campus, this study has drawn implications of critical success factors of Entrepreneurship programs as follow. First of all, because Entrepreneurship programs should focus on Entrepreneurship mind sets such as innovative idea generation and courage to overcome risk, it is more desirable that Entrepreneurship programs are introduced in all departments of universities such as Arts, Science and Engineering. These programs also need to take interdisciplinary approach and required to be opened from liberal arts course. In order to be sustained during all their academic careers, vision, mission and strategy for Entrepreneurship programs should be based on strong leadership and support of top leaders. Entrepreneurship culture of each university is also one of the most important success factors. Entrepreneurship programs not only as major programs but also as specific Entrepreneurship minors designed for departments such as Arts, Science and Engineering could be considered according to each university's situation. This study also suggest to make a motivation system for Entrepreneurship faculties, Ph d. programs for Entrepreneurship, communication network for Entrepreneurship programs and mentor system in community. To begin Entrepreneurship programs, it also needs to develop good education contents as many as possible. When it concerned with teaching method, project based 4 year program can be suggested to be effective and efficient. To introduce project based program that should be consistent till participants' graduation, university must prepare regulations to support team teaching, mentor and interdisciplinary cooperation. To dissipate the concept that Entrepreneurship is another version of management, this study support the idea that Entrepreneurship programs should be designed and run by independent and central-focused governance system, Entrepreneurship education center.
Korean Journal of Construction Engineering and Management
/
v.13
no.1
/
pp.140-147
/
2012
Climate changes caused by fossil fuel energy usages have led to serious environmental damages and resource scarcity. Ever-increasing demand for energy causes harsh competition in international energy markets. Nuclear power, which once was regarded as a desirable clean energy, began to face public oppositions after the Japanese nuclear disaster in 2011. In this context, wind power is now considered to be an ever-more important recyclable energy source. Thus, this study intended to identify critical success factors for wind power construction projects. After a thorough literature review, two focus group interview sessions were conducted. A questionnaire-based survey, coupled with the two previous methods, resulted in the extraction of important factors for the success of wind power projects. Experts, including those working as constructors, designers, and owners, were paid a direct visit for the interview and survey. The critical success factors were categorized into feasibility study, right policies, equipment selection, and project financing issues. The proposed critical success factors are expected to be an effective guideline for future investors in wind powers.
Korean Journal of Construction Engineering and Management
/
v.13
no.2
/
pp.147-155
/
2012
Recently, various construction projects are invested with plenty capital, manpower and resources. The advanced methods of the construction management is introduced to Korea. However, the cases which get involved in excessive cost frequently occur. We can explain it means that the cost management in the entire phases and the risk factors in its works has not been done yet as expected. Thus, it is necessary to unearth risk factors relative to cost management and analyse them for preventing cost-increasing and the success of projects. In this point of view, this study aims to identify the risk factors of the cost management focused on pre-construction stages from the perspective of construction management which is possible to take part in the whole phases and works in cost management. Also, the impact priority and grade of risk factors to cost-increasing are evaluated by using FMEA.
Six Sigma has been disseminated into a variety of areas. It is believed that a stepwise understanding of Six Sigma's DMAIC is required for successes of unit projects. Meanwhile, infra-structure factors, such as leadership, organization, personnel management, educational system, etc., are also important to safely implant the Six Sigma into the whole enterprise and to thoroughly create the culture of innovation and enterprise. Careful analysis of those elements makes it possible to draw common connection between Project Management and the Six Sigma. This study drives the success elements for the successful adoption of the Six Sigma in the Korea Western Power Co., Ltd., of which management was evaluated as one of the tops based on the results of 2007 Management Innovation Assessment and arranges the similarity of like this factor and Enterprise Project Management. The results of this study are expected to provide a useful guideline for the adoption of the Six Sigma in whole company level.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.