Browse > Article
http://dx.doi.org/10.5345/JKIBC.2022.22.2.207

Critical Impact Factors Affecting the Performance of Domestic Construction Projects through Megatrend Analysis  

Lim, Hyunsu (Department of Architecture, Soonchunhyang University)
Seo, Junghoon (Graduate School, School of Civil, Environmental and Architectural Engineering, Korea University)
Yoo, Wi Sung (Department of Construction Economic & Finance Research, Construction & Economy Research Institute of Korea)
Kim, Chang-Won (Team of Research for Public Construction Contract System, Korea Institute of Procurement)
Publication Information
Journal of the Korea Institute of Building Construction / v.22, no.2, 2022 , pp. 207-218 More about this Journal
Abstract
Changes in megatrends occurring within the spatial range of the production process can be critical factors that affect the performance of unit projects in construction industry, one of the representative order industries. Although changes in the megatrend are a prerequisite for successful performance achievement, previous studies suggested methods for performance measurement and management within the production process as major results. Accordingly, this study analyzed the megatrend related to domestic construction projects and presented critical impact factors(CIFs) that can be affect a project's performance. CIFs were set by combining keywords derived by reviewing major contents of related laws and policies and future strategy reports, and the importance of each indicator was quantitatively analyzed using analytic hierarchy process(AHP). It is expected that the findings of this study can provide meaningful basic data that the various stakeholders in a construction project can refer to when establishing the strategies to achieve successful performance.
Keywords
construction project; performance; critical impact factors; megatrend analysis; analytic hierarchy process;
Citations & Related Records
Times Cited By KSCI : 5  (Citation Analysis)
연도 인용수 순위
1 Cha HS, Kim KH. Development of construction project performance management system(PPMS) considering project characteristics. Korean Journal of Construction Engineering and Management. 2013 Jan;14(1):82-90. https://doi.org/10.6106/KJCEM.2013.14.1.082   DOI
2 Lee YS. A Survey of DEA Applications in measuring the efficiency performance of construction organizations. Korean Journal of Construction Engineering and Management. 2014 Sep;15(5):103-14. https://doi.org/10.6106/KJCEM.2014.15.5.103   DOI
3 Park JH. Read trends through the eyes of a micro [Internet]. Seoul (Korea): LG Business Insight. LG Business Research. 2009 Aug. Available from: http://www.lgbr.co.kr/uploadFiles/ko/pdf/man/LGBI1055-02_20090824090734.pdf
4 Ministry of Culture, Sports and Tourism. Briefing of Korea Policy [Internet]. Sejong (Korea). Available from: https://www.korea.kr
5 Kim CW, Oh SW, Seo J, Hong Y. A study for the improvement on the use and transparency of the occupational safety and health expenses in construction [Internet]. Ulsan (Korea): Research Report of Occupational Safety and Health Research Institute(OSHRI). 2022 Feb. Available from: https://www.kosha.or.kr/oshri/publication/researchReportSearch.do?mode=view&articleNo=427917&article.offset=30&articleLimit=10
6 Ministry of Government Legislation. The Korean Law Information Center [Internet]. Sejong (Korea). Available from: https://www.law.go.kr
7 POSCO Engineering & Construction(E&C). 2020 Corporate citizenship report [Internet]. Pohang (Korea): POSCO E&C. 2021 Jul. Available from: https://www.poscoenc.com:446/ko/esg/report.aspx
8 Kim CW, Yoo WS. Current state and future valuation of big data technology in building industry. Building Construction. 2021 Mar;21(1):29-36.
9 Choi EG. Construction Issue Focus: Response trends and future tasks of construction companies after implementation of the statutory working-hours reduction [Internet]. Seoul (Korea): Construction & Economy Research Institute of Korea; 2018 Nov 13. Available from: http://www.cerik.re.kr/report/issue/detail/2186.
10 Lee KW, Hong HU, Park HD, Han SH. Developing a program performance management framework for mixed-use development in urban regeneration projects. Korean Journal of Construction Engineering and Management. 2011 Jan;12(1): 141-52. https://doi.org/10.6106/KJCEM.2011.12.1.141   DOI
11 Naisbitt J. Megatrends. 1st ed. New York: Warner Books; 1982. 290 p.
12 Kim CW, Kim TH, Yoo WS, Cho HH, Kang KI. Optimized growth curve for estimating performance measurement baseline depended on domestic construction facility type. KSCE Journal of Civil Engineering. 2018;22(8):2691-701. https://doi.org/10.1007/s12205-017-0180-2   DOI
13 Kim CW, Yoo WS, Lim H, Yu I, Cho H, Kang KI. Early-warning performance monitoring system (EPMS) using the business information of a project. International Journal of Project Management. 2018 Jul;36(5):760-43. https://doi.org/10.1016/j.ijproman.2018.03.010   DOI
14 Ministry of Economy and Finance. National Finance Act [Internet]. Sejong (Korea): Ministry of Economy and Finance; 2020 Jan 09. Available from: https://www.law.go.kr/%EB%B2%95%EB%A0%B9/%EA%B5%AD%EA%B0%80%EC%9E%AC%EC%A0%95%EB%B2%95
15 Bekr GA. Factors affecting performance of construction projects in unstable political and economic situations. ARPN Journal of Engineering and Applied Sciences. 2017 Oct;12(19):5384-95.
16 Irfan M, Khalid RA, Khel SSUHK, Maqsoom A, Sherani IK. Impact of work-life balance with the role of organizational support and job burnout on project performance. Engineering, Construction and Architectural Management. 2021 Jul(accetped). https://doi.org/10.1108/ECAM-04-2021-0316.   DOI
17 Jeon MY, Yu JH. A model for developing composite indicators for construction project performance evaluation. Journal of the Architectural Institute of Korea Structure & Construction. 2012 Jul;28(7):81-90. https://doi.org/10.5659/JAIK_SC.2012.28.7.81   DOI
18 Jang DH, Cho SK. Is the mid-point of a likert-type scale necessary?: comparison between the scales with or without the mid-point. Survey Research. 2017 Nov;18(4):1-24. http://dx.doi.org/10.20997/SR.18.4.1   DOI
19 Cha HS, Kim TK. Developing measurement system for key performance indicators on building construction projects. Korean Journal of Construction Engineering and Management. 2008 Jan;9(4):120-30.
20 Lee DH, Kim SH, Kwon GD, Kim MK, Kim S. The management evaluation key performance indicators of Korean construction firms. Journal of the Korea Institute of Building Construction. 2011 Feb;11(1):35-44. https://doi.org/10.5345/JKIC.2011.02.1.035   DOI