A Study on the Proper Methodology for Selecting Domestic Public Sector Construction Management Contracts (국내 공공부문 CM의 평가 및 낙찰자 선정방법 개선안 연구)

  • Lee Yong-Jun;Lee Hak-ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.296-299
    • /
    • 2002
  • Construction Management tends to create a formal procurement resulted from recent legislative procedures system in domestic construction industry. However, the fact that construction Manager(CMr) has been chosen, in practice, under a poor circumstance in selecting and discriminating specialty requires the more optimal procedures. Therefore, in this research, we analyze the existing shortcomings. the various procedures, influence factors, and the criteria to be considered in selecting and evaluating CMr. Also. this study suggests the improved method based on the facts above. To accomplish the construction project successfully, it is one of the advanced schemes to choose an adequate CMr needed to the project through the precision in the formation and application of the procedure as well as the suggested criterion in selecting CM.

  • PDF

Major Risk Factors to Implement CM at Risk Pilot Project on the Public Sector (시공책임형 CM 발주방식 공공부문 시범사업 사례를 통한 리스크 도출)

  • Han, Jonghoon;Kim, Kyungtae;Ahn, Yonghan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.61-69
    • /
    • 2018
  • The buildings are getting enormous and more complex as well as the requirement of the owner which wants diverse and efficient. Moreover advanced management is necessary for construction services and a new method of delivering project is now required. In order to expand the delivering method and the construction industry, we have to introduced the CM at Risk method. However, despite the fact that six years have passed already the CM at Risk regulation was introduced, the contract amount in significantly lower than that of the CM for fee, and also there is no CM at Risk project in the public sector. As a result, three pilot projects are currently underway for the LH(Korea Land & Housing Corporation) in order to set up a CM at Risk for the public sector. However, detailed regulations related to CM at Risk have not yet been implemented in Korea. Therefore, in this study, I am trying to understand the risks that could incur when practitioners participate in the three pilot projects that are currently underway and employed in the public sector wherein the CM at Risk is normally introduced. Based on the results of this study, It will be able to utilize as a basic data for future CM at Risk delivery system improvement and enactment.

A Selection Model of Suitable Tendering System for Public Construction Projects (공공건설공사의 최적 입찰방식 선정모델)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.164-174
    • /
    • 2008
  • It is crucial In decision making to select a project delivery system (PDS) adjusted accordingly to the project characteristics. Furthermore, selecting a tendering system is the kernel in the process of selecting PDS. In October 2007, the Ministry of Finance and the Economy of Korea launched two new project delivery systems, "Best Value Contract (Design-Bid-Build)" and "Bridging Contracts (Design-Build)" by revising enforcement ordinances of "Act on Contracts to Which the State is a Party" to provoke the tendering systems. In order to support the proposed purpose, this research developed a selection model for suitable tendering system, which helps a public owner select a tendering system appropriate to the project characteristics. First, the framework of the model was set throughout analyzing previous researches and interviewing relevant experts. Additionally, by analyzing the survey result from 265 experts engaged in architectural and civil engineering business, the relative weights of the selection factors and the effectiveness values of the alternatives were suggested as the quantitative evaluation references. Finally, the practical guideline was suggested to apply this model to three public projects scheduled to be delivered. The result of applying the model to three case projects showed that further researches were needed to make the selection process logical and to suggest the standard weights and effectiveness values according to project type.

Decision Making Process for Alternative Selection of Proper Design Change in Construction Project (적정 설계변경안 선정을 위한 의시결정 지원 프로세스)

  • Lee, Jong-Sik;Chun, Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.74-82
    • /
    • 2010
  • A government agency has been announced to increase 23,663 hundred million wons by cost of design change which occurred in the pre-construction and construction phase. As design change is a phenomenon to occur by means of a characteristic of the building design that standardization is difficult, even if it is said that a perfect design is done in design phase, design change is prevented, and it is going to decrease, and there is a limit. Because there are some causes in all of the construction project, it is change order of client, relative system, unfit design and field condition, etc. In this study, we are suggested logic and basic model of the decision making support process model that it should selecting the optimal alternative through complex and quantitative analyzed: that is cost, performance and constructability as respect Owner or CMr is executing project under the CM delivery system construction project which it occurred design change.

Conceptual Cost Estimating System Development for Public Apartment Projects (공공아파트 프로젝트 기획단계 공사비 산정시스템 개발)

  • Lee, Hyun-Soo;Lee, Heung-Keun;Park, Moon-Seo;Kim, Soo-Young;Ahn, Jo-Seph
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.152-163
    • /
    • 2012
  • At the conceptual phase of a construction project, estimated construction cost is very important as it significantly influences the owner's decision-making. Accurate cost estimating, in the early stage of a public construction project, serves as a critical factor because initial decision-making effects the final cost of a construction project. However in the cases of Korean public apartment projects, excluding a few of the public owners, there is a problem in properly estimating construction cost due to the lack of construction cost estimating system. Thus, this research developed a public apartment cost estimating system using case-based reasoning that was suggested by a previous research with 66 cases of Korean public apartment projects. Based on the system experiments involving 19 public officers and 10 cases of Korean public apartment projects, the effectiveness of the system in terms of estimation accuracy and user-friendly was confirmed. As a result, the developed system has an error range of 1.47% to 13.74% and mean of 6.15%. In addition, the system was evaluated that it could greatly improve the current estimation task of public officers. Consequently, the results of this research can be used as a foundation for a technological advance in estimating construction cost and improving the accuracy and consistency of construction cost estimation.

An Analysis of Differences between Contract Costs Estimated by the Actual-Cost-Data-based Method and the Quantity-based Method (실적공사비적산제도 도입에 따른 도급금액 변동 분석)

  • Park Chang-Bae;Kim Dong-Young;Kim Ju-Hyung
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.510-514
    • /
    • 2004
  • This research is a preliminary one to investigate transitional problems of actual-cost-date-based contract cost estimation method and suggestions for counteracting them. As parts of it, in this paper, the brief background and methods of the new method and contract costs estimated by introducing it are presented. The results of five projects' contract costs are compared to those estimated by the conventional quantity-based method. Comparison of the both is conducted in terms of total contract costs and contract costs according to type of sub-contracts. Finally, the propositional differences of the later to the former are analysed.

  • PDF

The Deduction of the Success Factor in Construction Projects by Design Build Methods (디자인 빌드(Design Build) 방식 건설 프로젝트의 성공요인 분석에 관한 연구 - 중.소규모 건설 프로젝트를 중심으로)

  • Lee, Chi-Joo;Kim, Sang-Ki;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.182-190
    • /
    • 2007
  • The minor construction companies in Korea have grown in focusing on the construction operation field. Also, soft field is vulnerable area, and there are not enough delivery systems, therefore, a capacity of the construction industry expansion and productivity is insufficient. Furthermore, the minor construction companies are losing their areas, because the major construction companies having numerous know-how and ample funds are competitive. As the construction industry are more larger and complicated, the design build methods might be increased in the construction industry and the minor construction companies could have more competitive. Hence, this paper analyzes the success factor in minor construction projects by design build methods focusing on instance $company^{\circ}{\phi}s$ case and survey, and critical success factor deduction and importance degree analysis of this factor using AHP analysis. In addition, this paper gives fundamental data how to manage the construction project effectively for minor construction $companies^{\circ}{\phi}s$ expansion in near future.

Benchmarking of US General Contractor's Pre-construction Services for a CM at Risk Project to Improve Contractor's Competitiveness (책임형 CM사 경쟁력 확보 및 선진화를 위한 미국 건설사의 시공이전단계 서비스 벤치마킹 연구)

  • Lee, Chang-Jae;Lee, Sang-Hyo;Ahn, Yong-Han
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.3
    • /
    • pp.9-18
    • /
    • 2017
  • Construction Management at Risk (CMAR) is a project delivery method that enables CM companies to deliver projects at a Guaranteed Maximum Price (GMP). General contractors can apply CMAR from the initial design phase right through the construction phase to reduce risks and improve project performance. One of the major advantages CMAR offers is that it permits a general contractor to provide a comprehensive suite of preconstruction services, including estimating, a constructability review, value engineering, drawings and a specification review, green building, and Building Information Modeling(BIM), among others. However, general contractors in South Korea currently provide only limited preconstruction services using CMAR because few CMAR projects have yet been implemented in Korea and their experience using the method is therefore limited. This benchmark study of how foreign general contractors utilize CMAR in their projects, particularly during the preconstruction process, its purpose, and the roles and responsibilities of each of the different participants in successful implementations thus provides invaluable information and will serve as a useful guide for Korean contractors seeking to incorporate CMAR preconstruction services in their projects and thus improve the competitiveness of their construction businesses.

Life Cycle Cost Evaluation Index Enhancing of Public Facilities (공공시설물의 LCC 평가기준 개선방안)

  • Gu, Bon-Hak;Kim, Tae-Hui;Kim, Ok-Gyu;Park, Tae-Keun;Lee, Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.412-415
    • /
    • 2007
  • Recently advanced nations utilize evaluation system about LCC, and KOREA begin to introduce the system to reduce construction expense. And Introducing "Technical proposal type bid" that is new government construction order mode made needs for valuation of price to evaluate facilities LCC. These days LCC is evaluated by BTL and turnkey project in KOREA, but it is suffering from difficulty in evaluation. because evaluation element and standard are indefinite. In addition LCC evaluation of public construction business except BTL and turnkey is not consisting. Therefore, in this research we present LCC evaluation Index for systematic and objective evaluation.

  • PDF

Improving Constructability Analysis Tasks by Applying BIM Technology (시공성 분석업무 개선을 위한 BIM 기술의 적용방안)

  • Park, Chan-Sik;Park, Hee-Teak
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.137-146
    • /
    • 2010
  • Becoming construction projects larger and more complicated, and utilizing more varied and complex contracting and delivery systems in the industry, integrating information and managing constructability from project inception to completion became the most critical tasks for the successful project management. However, current industry practices of constructability analysis which are too much dependent on field engineers and managers' experiences, are not performed efficiently and also not managed effectively. Then the scope, method, and procedure in performing analysis tasks are not certain as well as not systematic, In addition, due to using 2D based drawings and documents, information required at project phases for the analysis is inconsistent and inaccurate. This study aims to suggest the use of BIM technology and functions for solving various problems of current constructability practices. In particular, constructability analysis tasks performed at design and construction stages are identified and their adaptability, applicability, and benefits of BIM are investigated through interviews on constructability and BIM professionals in the industry.