An Analysis of Differences between Contract Costs Estimated by the Actual-Cost-Data-based Method and the Quantity-based Method

실적공사비적산제도 도입에 따른 도급금액 변동 분석

  • 박창배 (동명정보대학교 건축대학 건축공학과) ;
  • 김동영 (동명정보대학교 건축대학 건축공학과) ;
  • 김주형 (동명정보대학교 건축대학 건축공학과)
  • Published : 2004.11.01

Abstract

This research is a preliminary one to investigate transitional problems of actual-cost-date-based contract cost estimation method and suggestions for counteracting them. As parts of it, in this paper, the brief background and methods of the new method and contract costs estimated by introducing it are presented. The results of five projects' contract costs are compared to those estimated by the conventional quantity-based method. Comparison of the both is conducted in terms of total contract costs and contract costs according to type of sub-contracts. Finally, the propositional differences of the later to the former are analysed.

본 연구는 실적공사비적산제도의 과도기적 문제점 분석과 이의 개선방안에 관한 연구의 기초 단계로 수행되었다. 이를 위해 원가 계산 방식과 실적 공사비 방식의 정의 및 구조를 알아본 후 세 개의 프로젝트를 대상으로 양 방식을 적용해 도급금액 내역서를 작성해 보았다. 이와 함께 현재 실재로 실적공사비 적산제도를 활용해 도급금액을 산정하고 있는 한국 S공사의 두 개의 프로젝트를 대상으로 공사측에서 제시한 금액과 원가견적방식으로 산출된 금액을 비교하였다. 이를 통해 실적공사비적산제도로 공사를 발주했을 경우 현재 방식과 비교해 도급금액이 어느 부문에서 어느 정도 변하는 가를 파악하였다.

Keywords