Nowadays, the IS project is getting more and more complicated and large-scaled. Many researchers and practitioners are interested in the IS development methodologies, automated tools and techniques to decrease project failure and to increase IS project performance. This research is to seize the management level of PMO affecting on the IS project, as a new method to increase the IS project development performance. As a result of surveying the present PMO operation state with banks which are the leading industry to accept the PMO in Korea, technology support management and infrastructure management are the core functions to affect the IS performance including schedule management, quality management, and user and stakeholders' satisfaction. Also, the PMO management level is the important point of IS project success. Among the 5 levels PMI suggested, PMO can implement the project effectively at least at the third level. Korean companies introducing the PMO have to do research the PMO core functions and the management levels according to the project scale, and review the distinctive features of their organization to increase the maturity of IS project. This research has been proved through the Full Structural Equation Model. The results show that the five core functions of PMO have relationship with the IS project performance.
Korean Journal of Construction Engineering and Management
/
v.23
no.1
/
pp.89-97
/
2022
Recently, various problems such as reduced productivity, insufficient inflow of skilled manpower, reduced quality, and concerns about increasing safety accidents have appeared in the domestic construction industry. Stakeholder of construction project are considering the Off-Site Construction (OSC) method rather than the conventional on-site construction as an alternative. Despite the importance of decision making in the early stage of the adoption of OSC, there is a lack of methodologies for rational decision making. In this study, a decision making system has been developed to derive the final construction cost score by deriving the project characteristics, selecting the construction difficulty index, and developing a cost model for each construction method alternatives to calculate the standard construction cost. Using this system, the OSC method can be effectively evaluated in terms of its feasibility in the early stage of construction
The Transactions of the Korea Information Processing Society
/
v.4
no.4
/
pp.993-1003
/
1997
In this paper an improvement is made on the function point moedl,one of sortware size dstimation model,for better fesibility with increased accuracy as my proposed moedl.For better feasibility seven function typcs are proposed in this model and technical complexity factors are used to assecss the diffculties of considering technical and distributed enviroment attributes.To assess the creditability of the proposed model,24-software develop-ment cases were cinsidered in the regression model with the actual require efforts as the total function points. As seen in the statistical results,the proposed model is at least as superior to the known function point models.
최근 자전거 이용인구가 급격하게 증가함에 따라 자전거 교통사고 역시 증가하고 있다. 이에 DB를 통해 이용자에게 알맞은 자전거 도로에 대한 정보를 제공하여 자전거 도로를 활성화하고자 다음과 같은 프로젝트를 진행하게 되었다. 서울시를 중심으로 사용자의 지역, 선호하는 길이, 난이도에 따른 DB를 제공하여 알맞은 자전거 도로를 선택하도록 하였으며, 기업에게는 자전거 이용자의 DB를 제공하여 마케팅에 활용할 수 있도록 하였다.
Kim, Seungbeum;Byun, Jeongyoon;Kim, Juhyung;Kim, Jaejun
Korean Journal of Construction Engineering and Management
/
v.15
no.3
/
pp.103-112
/
2014
Since recent construction projects become larger and complicated, the level of difficulty of management skill is rising, and the risk is increasing accordingly so the necessity of improving management skill of projects is increasing. In order to solve this problem, Construction Management system was preferentially introduced in construction projects but in case of domestic construction industry, separate contracts by business boundary are being made so the actual state is that the function of the Construction Management system is not properly operated over the overall projects. The partial operation of Construction Management system like this may impose many restrictions on converged and combined projects such as smart grid and intelligent buildings etc. in the future. For improvement of management skill of domestic construction projects, the competence of project management skill by work areas that can overcome heterogeneity of the current project management skill shall be secured, and any factor that impedes cooperation ability shall be found and that shall be solved. Therefore, the difference of work competency of project management system of construction and electrical construction is to be analyzed by utilizing IPA model in this study, and a plan to introduce the project management system of electrical construction for efficient operation of projects is to be looked into.
The Journal of Korean Association of Computer Education
/
v.23
no.2
/
pp.41-51
/
2020
The goal of this study is to test the hypothesis that the practicality of EXCEL VBA will be beneficial for SW education for SW non-majors. To this end, we planned the education for non-majors using the EXCEL VBA and conducted 15 weeks of education. According to a follow-up survey conducted after the 15-week education period, 72.21% of the survey respondents said EXCEL was practical. Also, learners who were aware of the necessity of SW education and the importance of SW competence recognized that the computational thinking education using EXCEL VBA had a positive effect on the improvement of computer-related knowledge and experience. Also, learners recognized that learning with EXCEL was easy, while learning with VBA was difficult. The learning process using VBA needs to be composed of project-oriented educational contents that can give a sense of achievement to learners rather than programming-oriented education. And continuous research on project-based learning is needed.
Computer game is a result of integration of various academic areas, and the production of computer game requires knowledge and experience from various areas. This study demonstrates a game production process using Scratch. The intent was to experience the game development process and the production principle through actually building the core functions of a game using Scratch. As such, the computer game production principle was understood and it was made possible to learn more easily and more enjoyably the functions of multimedia and programming necessary for the production process. As the result, the learning of game production principles using Scratch was found to enhance the interest of the learner, and help with the understanding of game structure and learning software/programming language.
Journal of Elementary Mathematics Education in Korea
/
v.19
no.2
/
pp.205-230
/
2015
The purpose of this study is, targeting 5th and 6th grades mathematically gifted elementary students, to analyze the effect of independent study project learning on self-directed learning ability and mathematical self-efficacy, and based on the results, examine the implications that independent study project learning has in special education for the gifted. In order to solve the study problems, 5th grade mathematically gifted elementary students(40) and 6th grade mathematically gifted elementary students(39) who had passed the selection criteria of D education institute for the gifted and had been receiving special education for the gifted were selected. The study results are as below. First, although self-directed learning ability had no significant difference at p<0.05, it statistically had some differences in averages between pre-test and post-test results. Second, although mathematical self-efficacy had no significant difference at p<0.05, it statistically had some differences in averages between pre-test and post-test results. Third, in the aspects of self-directed learning ability and mathematical self-efficacy, independent study project learning had a more positive effect on 5th grade mathematically gifted elementary students than 6th grade mathematically gifted elementary students. In addition, it had significant differences in 'the level of mathematical tasks', a sub-level of mathematical self-efficacy, and 'the openness of learning', 'the initiative of learning', and 'a sense of responsibility for learning', sub-levels of self-directed learning ability. These results imply that independent study project learning has a positive effect on self-directed learning ability and mathematical self-efficacy of mathematically gifted elementary students so that it could be meaningfully used as a teaching method for special education for the gifted at educational sites of independent study project learning.
The purpose of this study was to analyze the effect of Engineering computer programming instruction using project learning, to find out the ways to solve some revealed problems, and to improve the instruction. Unlike traditional lecture courses, students are encouraged to cultivate problem solving and teamwork skills through the programming project. In order to examine the effect of project learning, a survey was conducted with 49 students. The questionnaire consisted of 20 items with 5-grade scale each, the contents of which included learning value, workload, skills acquirement, assignment and comment. The SPSS, statistical analysis software was used to get statistics such as ANOVA, correlation and mean, etc. The results of this study showed (1) project learning was more efficient to acquire problem solving and teamwork skills compared with lecture learning, (2) there was significant correlation between self directed learning skill and information collecting skill, (3) cyber education system(i-campus) was helpful for students' self learning. But the results also showed that (4) students did not give high scores on items of the workload or difficulty of assignments. So we can conclude that it is necessary to develop the suitable projects for the capability of students to make the better project learning.
Korean Journal of Construction Engineering and Management
/
v.11
no.3
/
pp.115-124
/
2010
Along with the recent economic downturn, domestic construction companies have also faced with many difficulties and obstacles. To overcome this situations, now they are trying to continuous efforts to improve efficiency and productivity of project performance through many means including the reduction of fixed cost expenditures. Level of work performance of construction field managers is very important factor of productivity improvement for successive performance of construction project. This study attempts to analyse level and influence factors for work performance of field managers in construction companies through analysis of work burden and level of work performance. Also this study attempts to present basic data of the improvement directions for enhancing construction efficiency and productivity in future.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.