A Study of the Decision Making System in adopting Off-Site Construction Method in the Initial Stage Considering the Building Project Characteristics -Focused on Structure Work of Apartment Housing-  

Lee, Sungho (Department of Smart Convergence Architecture, Ajou University)
Cha, Heesung (Department of Architecture, Ajou University)
Son, Bosik (Department of Architectural Engineering, Namseoul University)
Publication Information
Korean Journal of Construction Engineering and Management / v.23, no.1, 2022 , pp. 89-97 More about this Journal
Abstract
Recently, various problems such as reduced productivity, insufficient inflow of skilled manpower, reduced quality, and concerns about increasing safety accidents have appeared in the domestic construction industry. Stakeholder of construction project are considering the Off-Site Construction (OSC) method rather than the conventional on-site construction as an alternative. Despite the importance of decision making in the early stage of the adoption of OSC, there is a lack of methodologies for rational decision making. In this study, a decision making system has been developed to derive the final construction cost score by deriving the project characteristics, selecting the construction difficulty index, and developing a cost model for each construction method alternatives to calculate the standard construction cost. Using this system, the OSC method can be effectively evaluated in terms of its feasibility in the early stage of construction
Keywords
Off-Site Construction; OSC; Decision Making Tool; Project Characteristics;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 Gyeonggi Housing & Urban Development Corporation, GH (2020). "Dasan Jingun A1 Block Private Participation Public Housing Project." Construction cost information disclosure, (Sep. 15, 2021).
2 Lee, S.H., and Cha, H.S. (2020). "A Study on Plans for Diffusion & Revitalization, and Developing Key Performance Indicator for OSC based PC Sturcture Apartment Housing." Korean Journal of Construction Engineering and Management, KICEM, 22(1), pp. 98-105.   DOI
3 Lee, S.H., and Cha, H.S. (2021). "A study of Developing Performance Management System Framework by Phase/Criteria for OSC Project." Proceedings of the Architectural Institute of Korea, 41(1), pp. 466-467.
4 Lim, B.L. (2004). "Apartment Estimation Program." Construction Technology SsangYong, 31, pp. 6-11.
5 O'Connor, J.T., O'Brien, W.J., and Choi, J.O. (2014). "Critical success factors and enablers for optimum and maximum industrial modularization." Journal of Construction Engineering and Management, ASCE, 140(6), 04014012.   DOI
6 Sharafi, P., Rashidi, M., Samali, B. Ronagh, H., and Mortazavi, M. (2018). "Idendification of factors and decision analysis of the level of modularization in building construction." Journal of Architectural Engineering, ASCE, 24(2), 04018010.   DOI
7 Son, J.W., and Lee, J.S. (2019). "Off-Site Construction: Innovation of construction production system." Construction Engineering and Management, KICEM, 20(5), pp. 3-7.
8 Yu, I.H. (2019). "Activation of OSC industry and change and development direction for specialized contractors." Construction Engineering and Management, KICEM, 20(5), pp. 12-18.
9 Jeollabuk-do Office of Education (2021). "Breakdown Cost for the first half of 2021(Architecture)." Facilities Department Archive, (Oct. 13, 2021).
10 Chen, Y., Okudan, G.E., and Riley, D.R. (2010). "Decision support for construction method selection in concrete buildings: Prefabrication adoption and optimization." Automation in Construction, Elsevier, 19(6), pp. 665-675.   DOI
11 Gibb, A. (2001). "Preassembly in Construction: a Review of Recent and Current Industry and Research Initiatives on Pre-assembly in Construction." Construction Research & Innovation Strategy Panel, London.
12 Hwang, B.G., Shan, M., and Looi, K.Y. (2018). "Knowledge-based decision support system for prefabricated prefinished volumetric construction." Automation in Construction, Elsevier, 94, pp. 168-178.   DOI
13 Jang H.J., Ryu, J.H., Kim, S.M., Ju, Y.K., and Kim, S.D. (2012). "An Evaluation on the Flexural Capacity of Void Slabs with Prestressed Half PC." Journal of the Architectural Institute of Korea Structure & Construction, 28(2), pp. 11-18.   DOI
14 Cho, Y.S., and Cha, H.S. (2010). "A Study of Project Characteristics and Project Performance Level of Difficulty." Korean Journal of Construction Engineering and Management, KICEM, 11(6), pp. 78-88.   DOI
15 Construction Industry Institute (CII) (2017). IR171-2 Prefabrication, Preassembly, Modularization, and Offsite Fabrication: Decision Framework and Tool, V, 2017-01.
16 Fard, M.M., Terouhid, S.A., Kibert, C.J., and Hakim, H. (2017). "Safety concerns related to modular/prefabricated building construction." International journal of injury control and safety promotion, 24(1), pp. 10-23.   DOI
17 Gyeonggi Housing & Urban Development Corporation, GH (2018). "Hwasung Dongtan District 2 A86BL Private Participation Apartment Housing Project." Construction cost information disclosure, (Sep. 15, 2021).
18 Gyeongsangbuk-do Development Corporation (2017). "Sandwich Half PC Wall Structure Eco-Friendly Stormwater Reservoir." Gyeongbuk Provincial Government New Town Construction Project Notice, (Oct. 13, 2021).
19 Yu, I.H. (2013). "Plan to revitalize industrialized construction." Construction Engineering and Management, KICEM, 14(2), pp. 28-32
20 Cao, X., Li, X., Zhu, Y., and Zhang, Z. (2015). "A comparative study of environmental performance between prefabricated and traditional residential buildings in China." Journal of Cleaner Production, Elsevier, 109, pp. 131-143.   DOI