Browse > Article
http://dx.doi.org/10.6106/KJCEM.2014.15.3.103

A Study on Competency Evaluation and Improvement Plan of Electrical Construction Management Using Importance-Performance Analysis  

Kim, Seungbeum (Department of Frontier Architectural and Urban Environmental Engineering, Hanyang University)
Byun, Jeongyoon (Department of Frontier Architectural and Urban Environmental Engineering, Hanyang University)
Kim, Juhyung (Department of Frontier Architectural and Urban Environmental Engineering, Hanyang University)
Kim, Jaejun (Department of Frontier Architectural and Urban Environmental Engineering, Hanyang University)
Publication Information
Korean Journal of Construction Engineering and Management / v.15, no.3, 2014 , pp. 103-112 More about this Journal
Abstract
Since recent construction projects become larger and complicated, the level of difficulty of management skill is rising, and the risk is increasing accordingly so the necessity of improving management skill of projects is increasing. In order to solve this problem, Construction Management system was preferentially introduced in construction projects but in case of domestic construction industry, separate contracts by business boundary are being made so the actual state is that the function of the Construction Management system is not properly operated over the overall projects. The partial operation of Construction Management system like this may impose many restrictions on converged and combined projects such as smart grid and intelligent buildings etc. in the future. For improvement of management skill of domestic construction projects, the competence of project management skill by work areas that can overcome heterogeneity of the current project management skill shall be secured, and any factor that impedes cooperation ability shall be found and that shall be solved. Therefore, the difference of work competency of project management system of construction and electrical construction is to be analyzed by utilizing IPA model in this study, and a plan to introduce the project management system of electrical construction for efficient operation of projects is to be looked into.
Keywords
CM; Electrical Construction; Importance-Performance Analysis; Capability of Specific Task;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 Kim, S. J., Kwun, J. B., Lee, J. W. and Kim, H. S. (2012). "A Study of Construction Management Professionals' Vocational Ethics." Korean Journal of Construction Engineering and Management, KICEM, 13(3), pp. 89-98.
2 Duke, C. R. and Persia, M. A. (1996). "Performance - Importance analysis of escorted tour evalutions." Journal of Travel and Tourism Marketing, 5(3), pp. 207-223.   DOI   ScienceOn
3 Kang, I. S. (2007). CM and Construction IT, Moonwundang, Korea, pp. 1-56.
4 Kim, H. R., Lee, N. K. and Jang, H. S. (2013). "Analysis of Competency Assessment Using IPA for Construction Project Managers." Korean Journal of Construction Engineering and Management, KICEM, 14(1), pp. 115-123.   과학기술학회마을   DOI   ScienceOn
5 Martilla, J. A. and James, J.c. (1977). "Importance - Performance Analysis." Journal of Marketing, 41(1), pp. 77-79.   DOI   ScienceOn
6 Ministry of Land Infrastructure, and Transport. (2008). CM Task Manual. Korea, pp. 1-15.
7 Byun, I. W. and Kim, Y. S. (2012). "An Analysis of Core Competence of Pre-construction Service of the Marking Inroads into Oversea Construction Market." Korean Journal of Construction Engineering and Management, KICEM, 13(2), pp. 80-90.   DOI   ScienceOn
8 Bea D. K. (2007). Construction Management Practical Business, Kimoondang, Korea, pp. 12-70.
9 Choi, K. W. (2010). "A Study on Activating Plans of Construction Management for Electrical Construction."
10 CMAA. (2010), Construction Management Standards of Practice, CMAA, America, pp. 1-107.
11 Kim, Y. S., Kim, S. K., Kim, O. K., Kim, Y. S. and Park, C. S. (2007). Construction Management Past and Future, Bomoondang, Korea, pp. 80-87.
12 Hanmiparsons. (2007). Construction Management A to Z, Bomoondang, Korea, pp. 53-64.