• Title/Summary/Keyword: 프로젝트관리자

Search Result 564, Processing Time 0.03 seconds

Analyzing Learners' Activities in the Collaborative Learning Based Group Project Using the Wiki Environment: a Case of the Google Sites Use (위키 환경을 활용한 학습자의 협력학습 기반 그룹 프로젝트 활동 분석: 구글 사이트 활용 사례를 중심으로)

  • Jung, Young-Sook;Park, Ok-Nam
    • Journal of the Korean Society for information Management
    • /
    • v.26 no.3
    • /
    • pp.239-259
    • /
    • 2009
  • The study aims at investigating students' behaviors and perceptions regarding the collaborative learning based group project using the wiki environment. The study utilized Google Sites as a case, and analyzed file unloads, the use of web pages, navigation bars, and comments as well as surveys. The study discusses main characteristics of students' activities in the collaborative learning group project, which are drawn from the analysis of students' behaviors and perceptions. The study also provides implications for improvement of wiki environment to support collaborative learning in education.

A Model for Deciding Evaluation Weights in Design-Build Delivery Method (일괄입찰방식의 적격심사분이별 배점 결정모델 개발)

  • Kim Man-Chul;Koo Kyo-Jin;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.91-100
    • /
    • 2005
  • Design-build that a single entity performs whole construction process under singular responsibility is one of the project delivery system comes to take expectation effects of time savings, cost saving, and quality assurance. On the other hand, a current domestic method for selecting a design-build contractor is difficult to reflect the purpose of owner and the project characteristics when owner selects the design-build contractor. The purpose of this research is to suggest a model for deciding evaluation weights in design-build which can reflect the purpose of owner and the project characteristics. This research can help owner to select the best suitable design-build contractor for the project.

A Study on the Establishment of Priority for IT Project Management Using AHP (AHP 기법을 이용한 IT 프로젝트 관리 우선순위 수립에 대한 연구)

  • Kyung, Tae-Won;Kim, Sang-Kuk
    • Information Systems Review
    • /
    • v.9 no.3
    • /
    • pp.157-181
    • /
    • 2007
  • Main concerns of IT project managements are concentrated on the output control and process management. IT project, however, is difficult to measure the quality of achievement, because it produces invisible and intangible outputs. Many studies have been carried on to quantify the intangible aspects of process management. However, most of them have been focused on the technological aspects. This study measures the priority of factors to manage IT project by applying the IT-BSC and PMBOK method. Established indexes include the factors of managerial, social and future-oriented perspectives to check the different aspects of project management over the technical factors. This study uses AHP method for quantitative measurement. This study can be meaningful because of following reasons. First, this study re-arranges IT project management evaluation indexes by balanced scorecard. Second, this model includes human factors of developers and users who are directly related to the project development and operation. Third, important items of each stakeholder have been separated, and the weights of each item have been quantified to have fixed values.

Developing a Project Management Information System for Construction Claims (건설 클레임에 대비한 정보관리시스템 개발)

  • Wang, Hankyeom;Park, Junil;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.70-81
    • /
    • 2018
  • Claims in the construction industry can have a serious impact on the profitability of the project or can even result in project failure if it fails to take appropriate prevention. In order to properly prevent and respond to the potential claims and legal disputes throughout the project execution, it is necessary to continuously accumulate informations and clearly define the roles and responsibilities of the important activities systematically. Based on these needs, this study develops and verifies the project information management system(PMIS) that can prevent and respond possible claims for construction projects. Developed system includes such management modules as schedule, cost, PM/CM, design, collaboration, and claims. The system was validated by adopting it to the practical projects. The results showed that information systems tailored to the construction claim need to elevate users' familiarity to be more useful. Besides, the system can be more functional when used by both owners and contractors.

Requirements Management Framework for Design Management and Information Characteristics (건설 발주자 설계 요건관리 체계화를 위한 개념적 틀 및 정보특성)

  • Jeong, Yeheun;Lee, Yunsub;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.3-15
    • /
    • 2020
  • For a successful construction project, the requirements of the client should be clearly defined and this should be reflected in the project based on the expertise of each project participant throughout the entire life-cycle. Therefore, it is necessary to establish the concept of Requirements Management to systematize and manage project requirements in terms of information management. This study aims to comprehensively define the concept of requirements management in the architecture industry and to provide a methodological basis for efficiently managing design requirements information by suggesting category of requirements information type and information analysis criteria. In addition, based on the case study, the requirements information was analyzed to propose a systemization methods of requirements management for PMO' design management and information management.

A Decision Making Support Model of Work Item-based Adaptation Strategy for RFID-based Construction Logistics and Progress Management (RFID 기반의 건설 물류 및 진도관리 통합체계를 위한 공종별 적용전략 의사결정모델)

  • Koo, Do-Hyung;Yoon, Su-Won;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.3-15
    • /
    • 2009
  • As building construction projects have been more higher and bigger in scale, the needs for cost reduction, productivity improvement, and reducing of work terms have rapidly increased in recent years. There has been, accordingly, a great emphasis on the necessity of logistics and progress management by well-organized system developed based on the appliance of different management theories. Although highly developed IT technology has contributed to the efficiency and effectiveness in information research and project management, RFID has been merely applied to a single progress or a few types of materials in current management studies, not to the overall process of the projects. This research proposes a consistent and systemized approach for decision making in adopting RFID technology in a construction project to support construction logistics and progress management. With a decision making model that consists of process model and template developed in this research, risks in cost, time, and error in building RFID-based construction logistics and progress management could be minimized.

Development of 3 layer EVM(Earned Value Management) Guideline for XP(eXtreme programming) based on CMMI (CMMI기반의 XP를 위한 3단계 EVM 적용 지침 개발)

  • Jeong, Mi-Seo;Han, Hyuk-Soo
    • Journal of Internet Computing and Services
    • /
    • v.9 no.6
    • /
    • pp.155-163
    • /
    • 2008
  • Project Monitoring and Control is one of the required activities in project management. This activity provides the information about whether a project is making a progress as it is planned. It is usually performed in weekly meetings or milestone meetings where the project manager checks the project's current status based on project measures such as schedule, cost and work performance. One of the popular method for project monitoring and control is EVM(Earned Value Management). The major characteristic of EVM is that it uses only one measure 'cost' for schedule and work performance so that it enables 2 independent graphs to be illustrated in one integrated graph based on cost. For applying EVM to a project, it is essential to break whole work to work packages and to assign value of cost to each work package at the initial stage of the project. Therefore EVM is well matched with the lifecycle which requires whole plan at the beginning of project. However, in XP(eXtreme Programming), whole customer requirements are difficult to define and to make a complete plan at the beginning and are more detailed in each Iteration. Therefore EVM is not comfortable method for XP. Therefore in this research we suggest 3 layer EVM which can be applied in XP, and develop a process guidelines based on CMMI(Capability Maturity Model Integration) PMC(Project Monitoring and Control) process area.

  • PDF

A Development of Project Performance Predicting System(PPS) considering Construction Project Characteristics (건축 프로젝트의 특성을 고려한 성과 난이도 예측 시스템 개발)

  • Ko, Young-Jin;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.62-72
    • /
    • 2011
  • Currently, The failure of construction project is increasing to be caused by a changing construction environment. According to this circumstances, Researches of project success factors affecting performance have been presented to develop strategies for efficient construction project management in the construction industry. However, Conducting efficient construction project management is difficult because project manager could not know which project success factors can be improved or not. Especially, although the project characteristics were derived the level of difficulty for performance, research of the project characteristics which could not be improved as influence factor to performance is lacking. Therefore, This paper has developed the Performance Predicting System(PPS) with Fuzzy set theory to establish. PPS has been developed to establish efficient project management strategies and to save time and effort. As Contractor inputs the project characteristics, PPS can predict the level of difficulty of performance.

Developing Measurement System for Key Performance Indicators on Building Construction Projects (건설 프로젝트 효율적 성과관리를 위한 핵심 지표 체계 구축)

  • Cha, Hee-Sung;Kim, Tae-Kyoung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.120-130
    • /
    • 2008
  • In construction industry, project performance should be evaluated in terms of project value objectives, i.e., cost, time, quality, safety, and environment. However, there have been few, if any, systematic approaches in assessing comprehensive performance level which encompasses the whole spectrum of project value objectives. It is non trivial to establish the standardized performance metric system due to the project individualities. This study provides a new approach in assessing the wide variety of project performance types by collecting the real industry project data. In addition, the proposed system has been validated through industry survey on project practitioners. It is concluded that the developed quantitative project performance measurement system would be effectively useful in indicating the level of current status of a particular project and furthermore, to provide a meaningful strategy for the future project in a more sustainable way.

Current Status of Housing Development Project Finance and Its Policy Implications (주택개발 프로젝트 금융의 현황과 정책과제)

  • Park, Won-Seok
    • Journal of the Korean association of regional geographers
    • /
    • v.11 no.4
    • /
    • pp.511-522
    • /
    • 2005
  • This paper aims at analyzing the current status, characteristics and problems of housing development project finance firstly, and secondly, examining the policy measures in order to enhancing the housing development project finance systems. The main results of this paper are as follows. Project finances are very activated in the housing development projects, especially, apartment development, since 2001. But most of housing development project finance are not virtual project finance, but conditional corporate finance, because most of project finance didn't uses bankruptcy remote. Therefore, the main policy measures in order to activate effective growth of project finance are, first, institutionalizing of project finance, second, enhancing the feasibility study capabilities of finance companies, third, using the real estate funds effectively, and forth, networking housing development project finances with long-term mortgage finances.

  • PDF