• Title/Summary/Keyword: 토목공사

Search Result 948, Processing Time 0.021 seconds

Comparative Studies of Standard of Estimated Unit Manpower and Material of Landscape Architecture Construction in Korea and Japan (조경공사 표준품셈의 한·일간 비교 연구)

  • Yun, Ju-Cheul;Lee, Kwan-Hee
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.29 no.3
    • /
    • pp.154-158
    • /
    • 2011
  • This research was carried out to compare the standard of estimated unit power and material in landscape architecture construction between Korea and Japan. It has also been done to offer a practical and reasonable information to Korea landscape architecture industry. The research results are as follows. First, both Korea and Japan's standard of estimated unit power and material in landscape architecture construction are part of civil construction. Second, Korea's detailed type of construction is centered on plant's type and size while Japan's centered on architectural construction. Third, Korea's standard of estimated unit power and material are composed of workforce construction, mechanical construction and addition of soil. On the other hand, Japan's estimated unit power and material are composed of workforce construction, time of transportation, date of transportation. Fourth, the planting specification of Korea seems to be more in detail than that of Japan, Japan's showing a wider implication. Fifth, when comparing the information regarding standard of estimated unit power and material between Japan and Korea, transportation, independent stalking for plant, soil for landscape architecture is difference between the two countries. On the base of this research results, Korea's standard of estimated unit power and material in planning construction should be more elastic in its implication and independent standard of estimated unit power and material in landscape architecture construction. Also, examination of transportation, independent skating for plant and soil for landscape architecture should be done in order for better improvements.

Study on the Influencing Factor for the Decision of the Embankment Construction Method using Geotextile tube Filled with Dredged soil (준설 토목섬유 튜브를 활용한 제방 축조 공법 결정을 위한 영향 인자에 관한 연구)

  • Kim, Hyeong-Joo;Sung, Hyun-Jong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.10
    • /
    • pp.5230-5236
    • /
    • 2013
  • In this paper, the influencing factors for the decision of the embankment construction method utilizing geotextile tube were studied by analyzing the application and economic considerations based on the construction practices of the geotextile tube filled with dredged soil in the domestic and international. In the domestic case, cost savings of 40 to 50% is attained by applying geotextile tubes in the embankment construction and in the international case, the amount of quarry materials was reduced from 20 to 70% by replacing the core of the embankment with geotextile tube. As a result, utilization of geotextile tube filled with dredged soil should be considered in a very large construction site with a quarry-to-site delivery distance of more than 16~25km. The construction scale and delivery distance were found to be important influencing factors for the decision of the embankment construction method utilizing geotextile tube filled with dredged soil.

A Study on a Technique for Simplifying the Connection of a 3D Model and Schedule Information for 4D Simulation (4D 시뮬레이션을 위한 3D 모델 및 공정 정보의 연계 간소화 기법 연구)

  • Park, Sang Mi;Lee, Jae Hee;Yoon, Hyeong Seok;Hwang, Jae Yoeng;Kang, Hyo Jeong;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.6
    • /
    • pp.861-868
    • /
    • 2022
  • A key use of applying building information modeling (BIM) to the construction stage of a project is to help identify construction obstacles and to visualize construction status according to the progress of the construction schedule. When employing 4D simulation for this purpose, start and finish dates for each activity and a 3D model of the activity must be prepared. In this work, in order to simplify the configuration of a 4D model, minimum attribute information of the BIM model produced in the design stage was used to construct a system that generated activity information in the construction stage using a clustering algorithm. Its usefulness as actual schedule management information was then analyzed.

Development of Quantity Take-off Algorithm for Irregularly Shaped Structures using 3D Object (3D기반 비정형 토목구조물 물량산출 알고리즘 개발)

  • Ha, Cheol-Seok;Moon, So-Yeong;Moon, Hyoun-Seok;Kang, Leen-Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.2
    • /
    • pp.655-666
    • /
    • 2014
  • Recently, as the appearance and exterior design of the construction structure are highlighted, the irregularly shaped structures are increasing in a construction facility. Many softwares provide a quantity take-off function of 3D object under BIM environment, however, they are focused on the limited function based on the solid modeling method. Because the vast geometric information of the curved surface is difficult to extract in the 3D objects that consist of major changes in vertical section shape as the irregularly shaped structures, it is difficult to express a 3D object as a solid model. On the other hand, the irregularly shaped structures can be expressed in relatively free in the surface model because the surface model consists of points, lines and surfaces. Accordingly, the surface modeling method is suitable for the modeling of large irregularly shaped structures. This study suggests a quantity take-off algorithm for the irregularly shaped structures using the surface modeling approach that is beneficial in the design work of structures. Some case projects are used for verifying the accuracy of the proposed method.

Conceptual Cost Estimation Model Using by a Parametric Method for High-speed Railroad (매개변수기법을 이용한 고속철도 노반공사의 개략공사비 예측모델)

  • Lee, Young Joo;Jang, Seong Yong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.4D
    • /
    • pp.595-601
    • /
    • 2011
  • There is currently applied to the unit cost per a distance (KRW/km) for estimating the conceptual cost of civil work on basic planning stage of high speed railroad. This unit cost is an arithmetic average value based on historical data, which could be in big error. It also is difficult to explain the deficiency comparing the estimated cost derived from next basic design stage. This study provides the conceptual estimation model using by the parametric method and regression analysis. Independent variables are the distance and the geological materials (earth, weathered rock, soft-rock, hard-rock), extracting from the actual data to 36 contracts. The deviation between the unit costs estimated using the developed model and the actual cost data is presented in the range from -0.4% to +31%. This range is acceptable compared the typical range "-30% to + 50%". This model will improve the accuracy of existing method and be expected to contribute to effective total cost management and the economic aspects, reduce the financial expenditure.

Identification of Contractual Risk Factors for Application in the Overseas Construction Projects based on FIDIC Red Book 1999 Edition (해외건설공사관련 계약적 리스크 인자에 대한 연구 - FIDIC Red Book 1999년판 기준 -)

  • Hyun, Hak-Bong;Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.6
    • /
    • pp.1153-1160
    • /
    • 2016
  • There have been many studies on the subject of risks in the Construction Industry and many useful results have been produced. However, risk studies on the conditions of contract, which is the most critical contract documents, has not been tried despite of its contractual function in the overseas projects. In this study, various contractual risks are identified for proper and reasonable evaluation of the contractual risks possibly encountered in the Tender and/or Contract stages of the Projects. For development of study, FIDIC Red Book 1999 Edition which is world widely recognised as a standard conditions of contract prepared for the projects designed by the Employer. Contractual risks are divided into three levels and applicable clauses are assigned to each appropriate risk factors. And table of major contractual risk factors are made using the classified levels of each factors with evaluation criteria as a result of this study. As this study is made only for the conditions of contract which is prepared for the construction contracts designed by the Employer, further studies for other types of contracts such as Design-Build (FIDIC Yellow Book), EPC/Turnkey (FIDIC Silver Book) and recently developed Design, Build and Operate type of contract (FIDIC Gold Book) are required to cover various types of projects executed in the world construction markets.

Analyzing Environmental Impacts in Construction Project at Different Ownership - Focus on Express Road Pavement Process - (공공발주자와 민간기업 측면의 건설공사 온실가스 환경비용 영향분석 - 고속도로 포장공종을 중심으로 -)

  • Jang, Woo Sik;Park, Heedae;Han, Seung Heon;Jeon, Jong Seo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.1D
    • /
    • pp.111-117
    • /
    • 2011
  • In the wake of increased concerns on reduction of greenhouse emission which started with United Nation's Framework Convention on Climate Change (UNFCCC) and Kyoto protocol, Korean government is making various efforts under the represented slogan "Low Carbon, Green Growth". Therefore, it is inevitable that construction industry also follow the Korea government's slogan and the international trend in environmental problems. This study identified several main construction materials and equipments of civil construction projects and suggested a environmental cost estimation method and related estimation standards (Public and private owners are distinguished). A case analysis of a real road construction project is also performed and characteristics according to the owner type is compared. This study analyzed the environmental impact to total construction cost variations. In the result, public owner required 11~16% of extra budget and private owner required 19~22% of extra costs. This study is limited in consideration of environmental factors and carbon trading prices.

A Method for the Effective Implementation of a Consignment Contract in Road Constructions (도로 수탁공사의 효과적 수행을 위한 방법론)

  • Bak, Gwon-June;Kim, Sung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.2D
    • /
    • pp.153-161
    • /
    • 2010
  • The city planning of a local government is a continuous process that does not end with the creation of a plan but proceeds through decision-making, monitoring and evaluation phases. As a new city planning is changed and confirmed, there is a chance to construct a large scale road that is connected with an under constructed road. In this case, the expansion of the width and length of road, the addition of bridges or tunnels, and the change of the size and location of interchanges lead to many changes on road design and construction. In the past, the consignment contracts for a road construction have been made in limited numbers and for limited civil works. Now, it is growing in numbers and is making for large scale multi-works. However, the standard process and guidelines for the consignment contracts have not been suggested yet, so there is difficulty in performing the consigned road construction effectively. In this paper, the important factors for the consignment contracts are determined by construction document reviews and expert interviews. Based on these results, a standard process for the consigned contracts and a guideline for agreeing on construction cost are suggested. The costs that should be paid by a consignor are also defined.

Design of Economical Steel Ratio in RC Flexural Members (RC 휨부재의 경제적 철근비 설계)

  • Jeong, Je Pyong;Lee, Chang Kee;Ryu, Heui Joong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.1
    • /
    • pp.93-99
    • /
    • 2015
  • This paper is on a practical method for determination of the economical steel ratio in RC flexural members with an equal safety factor. The cost functions of each material and labor are considered to construct the cost function. Then, an equation for determination of the economical flexure steel ratio with the lowest construction cost were proposed. It was found that a relevant steel ratio is recommended to be 0.65~1.0% for designing singly reinforced rectangular beam.

건설안전리포트 - 성실한 시공 입주자를 위한 것, 안전은 근로자를 위한 필수 요건

  • Choe, Jong-Deok
    • The Safety technology
    • /
    • no.143
    • /
    • pp.11-13
    • /
    • 2009
  • 서울 양청구 신정동 일대 총 연면적 45만 $1,943.09m^2$에 3,069가구가 건립되는 신정3지구 아파트 건설사업이 한창이다. 오는 2011년 7월 준공을 두고 토목공사와 골조공사에 여념이 없는 신정3지구는 총 5개 단지에서 국내 내로라하는 건설기업들이 초고를 뽐내며 쾌적한 주거환경을 조성하고 있다. 그 중 2단지와 5단지 시공을 담당하고 있는 금호건설은 건설기술을 넘어 철학으로 접근한다. 그 철학 속에서 쾌적한 친환경 주거공간 완공뿐만 아니라 현장 근로자의 안전을 먼저 생각하는 따듯한 마음으로 무재해 시공에도 열을 올린다. 국내 건설기업 Top 10에 드는 기업답게 현장 운영에 있어서도 Top의 면모를 보여주고 있는 신정3지구 2,5단지(정현영 현장소장 / 이하 2,5단지) 현장은 안전에 있어서도 최고의 수준을 고수한다.

  • PDF