A Study on a Technique for Simplifying the Connection of a 3D Model and Schedule Information for 4D Simulation  

Park, Sang Mi (Korean Institute of Civil Engineering and Building Technology)
Lee, Jae Hee (Gyeongsang National University)
Yoon, Hyeong Seok (Yooshin)
Hwang, Jae Yoeng (Gyeongsang National University)
Kang, Hyo Jeong (Gyeongsang National University)
Kang, Leen Seok (Gyeongsang National University, ERI)
Publication Information
KSCE Journal of Civil and Environmental Engineering Research / v.42, no.6, 2022 , pp. 861-868 More about this Journal
Abstract
A key use of applying building information modeling (BIM) to the construction stage of a project is to help identify construction obstacles and to visualize construction status according to the progress of the construction schedule. When employing 4D simulation for this purpose, start and finish dates for each activity and a 3D model of the activity must be prepared. In this work, in order to simplify the configuration of a 4D model, minimum attribute information of the BIM model produced in the design stage was used to construct a system that generated activity information in the construction stage using a clustering algorithm. Its usefulness as actual schedule management information was then analyzed.
Keywords
4D model; Schedule chart; BIM; Schedule management;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Iglesias, V. and Richard, A. (2019). Descriptive analysis of construction scheduling data towards automation of 4D building information modeling, M.S Thesis, University of Illinois at Urbana-Champaign, USA.
2 Jeong, J. W., Seo, J. H., Park., H. J. and Choo, S. Y. (2019). "A study on implementation of 4D and 5D support algorithm using BIM attribute information - Focused on process simulation and quantity calculation -." Journal of the Regional Association of Architectural Institute of Korea, The Regional Association of Architectural Institute of Korea, Vol. 21, No. 4, pp. 15-26 (in Korean).
3 Lee, J. C. (2004). "Developing an automated module for scheduling and quantity estimation based on 3D CAD model information towards effective use of 4D CAD model." Journal of the Architectural Institute of Korea Structure & Construction, Architectural Institute of Korea, Vol. 20, No. 2, pp. 15-22 (in Korean).
4 Melzner, J. and Hanff, J. (2016). "Automatic generation of 4D-schedules for reliable construction management." Lake Constance 5D-Conference 2016, Constance.
5 Song, J. W. (2016). A study on development of construction BIM template for process management of construction projects & measures for information utilization, Thesis of Master Degree, Nam Seoul University (in Korean).
6 Song, S. Y., Yang, J. S. and Myeon, T. S. (2012). "Automated generation of a construction schedule based on the work method template for 4D simulation." Industrial Engineers Interfaces, Korean Institute Of Industrial Engineers, Vol. 25, No. 2, pp. 216-228 (in Korean).
7 Vries, B. and Harink, J. M. J. (2007). "Generation of a construction planning from a 3D CAD model." Journal of Automation in Construction,Vol. 16, No. 1, pp. 13-18.   DOI
8 Wilfredo, T. C., Chi, Y., Amer, F. and Mani, G. F. (2019). "Automated mining of construction schedules for easy and quick assembly of 4D BIM simulations." ASCE International Conference on Computing in Civil Engineering, Atlanta, United States, pp. 432-438.
9 Yoo, J. S. (2010). A study of 4D simulation system through automatic scheduling process, Thesis of Master Degree, Konkuk University (in Korean).