A Method for the Effective Implementation of a Consignment Contract in Road Constructions  

Bak, Gwon-June (한신공영(주))
Kim, Sung-Keun (서울산업대학교)
Publication Information
KSCE Journal of Civil and Environmental Engineering Research / v.30, no.2D, 2010 , pp. 153-161 More about this Journal
Abstract
The city planning of a local government is a continuous process that does not end with the creation of a plan but proceeds through decision-making, monitoring and evaluation phases. As a new city planning is changed and confirmed, there is a chance to construct a large scale road that is connected with an under constructed road. In this case, the expansion of the width and length of road, the addition of bridges or tunnels, and the change of the size and location of interchanges lead to many changes on road design and construction. In the past, the consignment contracts for a road construction have been made in limited numbers and for limited civil works. Now, it is growing in numbers and is making for large scale multi-works. However, the standard process and guidelines for the consignment contracts have not been suggested yet, so there is difficulty in performing the consigned road construction effectively. In this paper, the important factors for the consignment contracts are determined by construction document reviews and expert interviews. Based on these results, a standard process for the consigned contracts and a guideline for agreeing on construction cost are suggested. The costs that should be paid by a consignor are also defined.
Keywords
consignment contract; road construction; consignor; process; guideline;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 백영권(2009) 기준단가 하락 공공공사 수익성이 악화되고 있다. 건설저널, 한국건설산업연구원, pp. 22-23.
2 서울시설공단(2007) 감독업무지침서, www.sisul.or. kr/index.jsp
3 손보식, 이재섭, 이현수(2001) 건설공사의 공기지연으로 인한 손실비용 산정방법, 대한건축학회논문집 구조계, 대한건축학회, Vol. 17, No. 2 pp. 93-100.
4 이재섭(1999) 공기지연에 따른 손실비용 산정기준, 정책연구보고서, 한국건설산업연구원.
5 전용덕, 이재섭(2002) 설계변경으로 인한 작업 생산성 손실 산정방법, 대한건축학회논문집 구조계, 대한건축학회, Vol. 18, No. 8, pp. 91-98.
6 한국정책연구원(2009) 국가계약관련 법령집, 건설정보사.
7 한국철도시설공단(2008) 철도건설 및 횡단시설 관련 수탁업무관리 지침, www.korail.com