A Study on the Hoisting Planning System in Highrise Building Construction (초고층 건축공사의 양중계획 시스템에 관한 연구)

  • Kim, Jung-Jin;Choi, In-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.4 s.18
    • /
    • pp.121-130
    • /
    • 2005
  • A systematic hoisting planning for tower crane is the most important elements in highrise building construction. However without sufficient data, systematic approach, it is not with ease to produce an appropriate planning at the rite. Therefore, this research aims at developing a systematic hoisting planning system in visual graphic with systematic procedure. The result of this research is that developed system on hoisting load calculation, numbers and specification of tower cranes are graphically visualized easily at the site. The study of applying this system to real project proves that it presents a sufficient capability as a useful tool in the hoisting planning of highrise building projects.

Structural Analysis for the Collapse Accident of Tower Crane (타워크레인 붕괴사고의 구조적 분석)

  • 이명구;노민래
    • Journal of the Korean Society of Safety
    • /
    • v.16 no.4
    • /
    • pp.147-152
    • /
    • 2001
  • The tower cranes are the very useful construction machine in the high place works. But they are very susceptible to the load balance, the wind load and the hanging load because they are the very slender structures and those center of gravity is located in the upper part. Therefore, the collapse accidents of tower one have repeatedly happened during the assemble or disassemble works. The correcting frame may has often used in order to correct the error in the setting of foundation anchors. The goal of this study is that propose the methods preventible the collapse accident of tower crane which is constructed by using the correcting frame. In order to accomplish the goal of this study, the field survey, the reference investigation and the structure analysis were performed for the collapse accident of tower crane using the correcting frame. This study result in the methods preventible the same accident.

  • PDF

A Study on the Stability of Rope Guying of Tower Cranes. (타워크레인 로프가잉 안정성 검토에 관한 연구)

  • Lee, Won-Suk;Ho, Jong-Kwan;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.247-252
    • /
    • 2009
  • With the increasing use of tower cranes higher than free standing height, the importance of lateral support is also growing. Since the fall of 43 tower cranes hit by the last typhoon 'Mami' in 2003, regulations and concerns about safety of construction equipment have increased and construction laws regarding lateral support have been strengthened. In Korea, where there are many large-scale apartment housing construction works with the development of new towns, Rope Guying is a more economical construction method than Wall Brace which fixes building structure like building wall and slab. The safety of this Rope Guying is not verified and many construction works are still carried out based on the experience of site managers. There has been no case of construction work where frame and measurements are applied. The objective of this study is to examine the safety of Rope Guying method and ensure the effective implementation of equipment and prevention of disasters.

  • PDF

Alternative Evaluation Model for Tower Crane Operation Plan in Modular Construction - Focusing on Modular Unit Installation and Finishing works - (모듈러 건축 타워크레인 운용 계획의 대안 평가 모델 - 유닛 설치 및 마감공사를 중심으로 -)

  • Kim, Joo Ho;Park, Moonseo;Lee, Hyun-Soo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.50-60
    • /
    • 2018
  • Recently, modular construction method has been widely applied to projects with repetitive processes including dormitory, the residential facility, and the hotel construction due to reduced labor input and shortened construction schedule. Generally, about 40% of total on-site construction cost excluding unit installation cost, is put on exterior finishing work, and thus management of finishing work is deemed important in maintaining the targeted schedule and cost. Since limited equipment is shared so that subsequent activities are not affected while carrying out on-site installation and finishing work, lifting plan becomes more important for modular projects with greater portion of finishing work load. In this regard, tower crane operation plan may take the form of a single cycle or multiple cycles in which equipment efficiency can be affected. However, difficulties exist in evaluating alternatives to tower crane operation plans supporting unit installation and finishing work. Therefore, this study aims to evaluate the alternative of tower crane operation method according to the cyclic period setting in modular building site to determine the effect on T/C uptime and process by parameterizing lifting time for unit and exterior finishing material, lift cycle for unit and exterior finishing material and time required for finishing work. Accordingly, this study develops a simulation model that can increase the tower crane efficiency by controlling the work speed. An academic contribution of this study is to suggest a resource leveling method applying the concept of lifting cycle, and further is expected to be managerially used as a basis for an alternative evaluation of equipment plan.

A Study on the Measures for Detection Error from the Displacement Distortion of the RADAR Waveform (레이더 전파의 왜곡현상에서 오는 탐지 오류 저감 방안 연구)

  • Kim, Jin Hieu;Kim, ChangEun;Lee, Yong-Soo
    • Journal of the Korea Institute of Construction Safety
    • /
    • v.2 no.1
    • /
    • pp.36-44
    • /
    • 2019
  • $21^{st}$ century is digitally civilized era. Technologies such as AI, Iot, Big Data, Mobile and etc makes this era digitally advanced. These advancement of the technology greatly impacted detection range of the radar. Human's eye sight can see about 20Km and hear 20 ~ 20000 Hz. These limitations can be overcome using radar. This radar technology is used in military, aircraft, ship, vehicle and etc. to replace human eye. However, radar technology is capable of making False Alarm Rate. This document will propose the fix of these problems. Radar's distortion includes beam refraction, diffraction and reflection. These inaccurate data result in deterioration of human judgements and my cause various casualties and damages. Radar goes through annual testing to test how many false alarm is being produced. Normal radar usually makes 10 to 20 False alarms. In emergency situation, if operator were to follow this false alarm, this might result in following false object or take 12 more seconds to follow the right object. This problem can be overcome by using different radar data from different places and angles. This helps reduces False Alarm rate and track the object twice as fast.

Multi-objective Optimization Model for Tower Crane Layout Planning in Modular Construction (모듈러 건축의 타워크레인 배치계획 수립을 위한 다중 최적화 모델 개발)

  • Yoon, Sungboo;Park, Moonseo;Jung, Minhyuk;Hyun, Hosang;Ahn, Suho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.1
    • /
    • pp.36-46
    • /
    • 2021
  • With an increasing trend toward high-rise modular construction, the simultaneous use of tower cranes at a modular construction site has recently been observed. Tower crane layout planning (TCLP) has a significant effect on cost, duration, safety and productivity of a project. In a modular construction project, particularly, poor decision about the layout of tower cranes is likely to have negative effects like additional employment of cranes and redesign, which will lead to additional costs and possible delays. It is, therefore, crucial to conduct thorough inspection of field conditions, lifting materials, tower crane capacity to make decisions on the layout of tower cranes. However, several challenges exist in planning for a multi-crane construction site in terms of safety and collaboration, which makes planning with experience and intuition complicated. This paper suggests a multi-objective optimization model for selection of the number of tower cranes, their models and locations, which minimizes cost and conflict. The proposed model contributes to the body of knowledge by showing the feasibility of using multi-objective optimization for TCLP decision-making process with consideration of trade-offs between cost and conflict.

A Study on the Importance of Real-Name System for Safety Management through Investigation of Construction Sites (건설현장 실태조사를 통한 안전관리 실명제 중요성에 관한 연구)

  • Yeon Cheol Shin;Sang Hyun Kim;Yu Mi Moon
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.4
    • /
    • pp.817-827
    • /
    • 2022
  • The real-name safety management system is to indicate "safety" after inspection by construction personnel before workers use it for the purpose of preventing safety accidents caused by unsafe conditions in temporary facilities and temporary constructions installed at construction sites. Purpose: By implementing the real-name system for safety management at construction sites, the objective is to respond to the "Severe Accident Punishment Act" and to improve the level of safety management at the same time. Method: In this study, a hierarchical analysis model was produced through previous studies of actual conditions such as types of safety incidents and causality at construction sites. The AHP model was used to calculate integrated weights and rankings with a pairwise comparison questionnaire for experts. Conclusion: As a result of the analysis of the upper classes, construction machinery was evaluated the highest, and real-name management system was evaluated the lowest. As a result of the lower-level analysis, it was considered that opening doors for safety facility management, tower cranes for construction equipment, management under the "Occupational Safety and Health Act" under the real-name management system, and CEO duties for safety management organizations were the most important.

Productivity Analysis of Reinforced Concrete Works and Tower Crane Working Ratio for High-rise Apartment Buildings (초고층 공동주택 RC 공사의 생산성 및 타워크레인 가동율 분석)

  • Kwon, Jihun;Huh, Youngki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.1
    • /
    • pp.55-62
    • /
    • 2021
  • The productivity of rebar-work and form-work was analyzed with data collected from an actual high-rise construction project, and the actual utilization rates of three tower cranes were also investigated. It was found that the average productivity of the form-work increased from 12.00~8.71(㎡/man·day) in the underground and above-ground/lower-floor to 11.94~20.73(㎡/man·day) in the standard floor. Comparing the productivity of core area to outer, the former was found to be about 11% higher. Moreover, the rebar-work productivity of the outer area(1.12 ton/man·day) was approximately 9.6% higher than that of the core area for the standard floor. The average utilization rates of three TC were surveyed to be about 63.49%, and it was revealed that rainy weather(6.1%), strong winds(6.1%), holidays(17.8%), TC lifting work(5.8%), and other failures and repairs(0.07%) were the causes of non-operation. These research results are expected to be beneficial data in planning and managing the process of high-rise RC construction works in the future.

The Development of the Slope Monitoring System(SMS) of the Tower Crane (타워크레인의 기울어짐 측정 시스템 개발)

  • Shin, Woon-Chul;Hong, Yong-Soo
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.6
    • /
    • pp.60-64
    • /
    • 2010
  • The purpose of this study if to prevent dangerous accident of the overthrow of the tower crane in summer's hurricane. We develop the SMS in order to give automatic alarm system to operator within the dangerous range and to give a information of the exactly slope in the real time. The slope value of the tower crane is compose of direction, pitch by the front and rear, roll by the right and left and synthesis by the its pitch and roll. Especially, the synthesis eliminate the effect of the wall tie or wire bracing. So, this value should correctly indicate the actual slope. In this study, more applying field test should be applied with the SMS. In the future, a more measurement device can be applied to, and be able to feed more alarm criteria for the review of the risk in the field.

Effectiveness Analysis of the Construction Schedule for PC Apartment Buildings using a Tower Crane (타워크레인을 적용한 대단지 PC공동주택의 공정계획 효용성 분석)

  • Kim, Ki-Ho;Lee, Bum-Sik;Lee, Dong-Gun;Kim, Min-Jun;Sohn, Jeong-Rak
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.105-106
    • /
    • 2023
  • In project projects where various factors arise, the construction company's initial establishment of a reasonable process plan reduces various variables and potential risks. In order to create a densely written initial process plan, it is necessary to compare the economic feasibility of time and money by reflecting Slack time. Through this, site managers can lead a successful project based on reasonable and stable construction.

  • PDF