철골공사 작업중단 빈도수와 사고방지 예측

  • 홍승렬;손기상
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2003.05a
    • /
    • pp.483-486
    • /
    • 2003
  • 사무소는 물론 초고층 아파트에까지 철골구조에 의한 공사가 시행되고 있다. 이처럼 상업용 사무소 건물의 경우 초고층 일 수밖에 없으며, 철골구조공사는 필수적이다. 공사공정 및 잠재위험은 그만큼 증대 될 수밖에 없다.(중략)

  • PDF

An Analysis of Application by Formwork in Concrete Structural Frame Work for Tall Building in Korea (국내 초고층 골조공사의 거푸집벽 적용성 분석)

  • Kim, Tae-Hoon;Jin, Il-Guan;Shin, Yoon-Seok;Cho, Seong-Soo;Kang, Kyung-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.387-391
    • /
    • 2007
  • A proper selection of formwork greatly affects project success in tall building construction. The tall building construction, however, has not been selected properly using the characteristics by formwork and demands the comprehensive consideration of cost, duration, quality, safety, and environment. Therefore, this study compares and analyzes the application by formwork of five aspects. In order to perform an analysis, the questionnaire was performed to research the priority order of management as determining formwork and application by formwork of tall building construction engineers. This study is expected to help reasonable selection of formwork.

  • PDF

A Analysis and Improvement of Manpower Management For Finish Work in High-Rise Housing Projects (초고층 주상복합 건물 마감공사 출역인력관리 현황분석 및 개선방안)

  • Won, Kyeong-Suk;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.600-603
    • /
    • 2004
  • Recently, Housing projects in the center of the Metropolis are getting higher, larger, more complex gradually, the resources are increasing greatly. Especially, the right manpower in the right place could quite important factor because the construction cites are wide and many subcontractors and labors throw into finish works in High-rise Housing projects. Differing from apartment building projects. it is only four or five years that high rise building projects are started so, there is little data for manpower information. Furthermore it is difficult that the data gathering and managing because manpower management is usually used to execute by subcontractors from supply to demand. Consequently, this study, proposed develop management for accurate manpower plan and efficient collection and practical use of manpower information through analysis of present condition in construction sites

  • PDF

Development of Space-Model Based on Site Images for Improving Preparation Process of Interior Construction in High-rise Buildings (초고층 마감공사 준비작업 개선을 위한 현장사진기반 공간모델 개발)

  • Hwang, Joon-Young;Kim, Seung-Hyun;Jung, Hyun-Cho;Kim, Hae-Gon;Park, Sung-Ho;Koo, Kyo-Jin;Hong, Tae-Hoon;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.90-98
    • /
    • 2008
  • The technical improvement of high-rise building construction is getting better as the demands of the skyscrapers is increasing. The interior construction has become the essential factor which directly affects the whole project because of skyscraperization. This study has proposed the site image-based space model as the tool for supporting decision-making for preparation and execution of the interior construction. It is expected to make the space model which is suitable for the project characteristics and work packages.

A Study on Analysis and Improvement of the Process of Furniture Work for High-rise Residential Building (초고층주거건축의 가구공사 프로세스 분석 및 개선방안에 관한 연구)

  • Kim Hyun-Woo;Song Young-Woong;Choi Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.446-449
    • /
    • 2003
  • Recently, large residental buildings including high-rise apartment and a multi-business and commercial-residential building are appearing in the form of Korean construction work. According to this large-size trend a tenn and cost of construction works was largely increased. Therefore, studies of techniques construction management for successful project are lively being progressed. This study introduced Just-In-Time form and Lean Construction concept in order to establish management system of a house construction work taking up much portion on aspects of work scale and materials transportation in finishing works of high-rise residental building architecture. The process of house construction works will be analyzed with these two principles for productivity improvement and then the improvement plan will be suggested. This analysis and proposal can induce the flow of finishing works smoothly and contribute to success of project through saving of a tenn and cost of construction works.

  • PDF

A Vertical Movement Plan for Labors in High-Rise Building Construction Using Discrete-Event Simulation (이산형 시뮬레이션을 사용한 초고층건물공사 작업원의 수직이동계획)

  • Ahn Byung-Ju
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.47-54
    • /
    • 2004
  • Recently, many high-rise buildings have been constructed, and are under construction. And a high-rise building with more than 100 floors is under planning. From site logistics management point of view, it is very important to manage vertical transportation of resource (e.g., material, equipment and construction labors) in high-rise building construction. The higher the building is constructed, the more important it is to manage for vertical transportation of it. In case of labors, vertical movement needs longer time in high-rise building construction than in low-rise. This results in low productivity and work efficiency of the construction. Therefore, this study presents a process of a vertical movement plan for labors using discrete-event simulation. And then the process applies to MT 130 project, which is a virtual high-rise building construction project.

Extraction and Analysis of Construction Phase Risk Factors in High-rise Construction Project (초고층 건설공사 시공단계 리스크 요인 도출 및 분석)

  • Kim, Sooyong;Kim, Sunghyun;Yang, Jinkook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.90-98
    • /
    • 2016
  • High-rise buildings construction project have various risk factors. Major risk factors are negative results such as time delay and increase of costs. Therefore, this study was analyzed risk factors in construction stages of high-rise buildings using by PROMETHEE technique. For this, this research were identified risk factors through experts Focus Group Interview(FGI). And, PROMETHEE was used to setup evaluation standard for analysis of high-rise building construction risks. Next, the standard of evaluation index calculation was composed by using the definition level in PDRI. Preference function and evaluation index were identified through questionnaires. Through these processes, this study has calculated the importance of high-rise building construction risks using by PROMETHEE technique. As a result, high degree risk factors were as following. These are 'Operation plan of material lifting', 'Outrigger & Belt Truss Construction', 'Foundation work plan of high-rise building' and 'Considering a Structure concept of high-rise building'.

Study on Optimization for Construction Vertical Lifting with Transfer Operation for Super High-rise Buildings (초고층 건축공사의 리프트 수직 환승운영 최적화 방안 연구)

  • Moon, Jooyong;Park, Moonseo;Lee, Hyunsoo;Jung, Minhyuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.53-62
    • /
    • 2014
  • Recently, the number of super high-rise building projects have been increased after recovering from international financial crisis. In super high-rise building project, vertical lifting is critical to overall project productivity, due to its limited lifting equipments. Also for projects which buildings' height are higher than 400m, transfer operation in lifting is inevitable because of lifts' maximum lifting height. In transfer operation, setting a transfer floor is essential for saving lifting time of resources. In this research, using discrete event simulation modeling with AnyLogic 7.0 software and metaheuristic optimization with OptQuest software, the method of optimizing a transfer floor for workers during the morning peak time is proposed. Comparing to the result of the case which transfer floor is designated to the middle floor, setting optimized transfer floor significantly decrease the total lifting time of workers. By using proposed simulation and optimization tool, saving budget and time through increasing available working hour is expected.

Analysing Decision Factors of Delivery System for Finishing Work in High-Rise Building Construction (초고층건물 마감공사의 발주방식 선정요소에 대한 연구)

  • Lee Jae-Il;Ahn Byung-Ju;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.345-348
    • /
    • 2003
  • The overall ability to manage the construction projects from an integrated perspective is important due to the emerging of high-rise building constructions. Potential hazardous of low productivity exist in the finishing work of high rise building a distinct example of the projects. Especially, the number of activities that should be controlled during finishing work is more than during skeleton work. Thus field managers should attract more attention to manage finish work activities. The low productivity of these activities can diminish that of skeleton work. Decision factors of the delivery system for finishing works in the high-rise building project is established by means of literature review and questionnaire survey and a basis to analyze the effects of the criteria to the deli very system is presented.

  • PDF