Browse > Article

A Vertical Movement Plan for Labors in High-Rise Building Construction Using Discrete-Event Simulation  

Ahn Byung-Ju (전주대 공학부 건축공학전공)
Publication Information
Korean Journal of Construction Engineering and Management / v.5, no.2, 2004 , pp. 47-54 More about this Journal
Abstract
Recently, many high-rise buildings have been constructed, and are under construction. And a high-rise building with more than 100 floors is under planning. From site logistics management point of view, it is very important to manage vertical transportation of resource (e.g., material, equipment and construction labors) in high-rise building construction. The higher the building is constructed, the more important it is to manage for vertical transportation of it. In case of labors, vertical movement needs longer time in high-rise building construction than in low-rise. This results in low productivity and work efficiency of the construction. Therefore, this study presents a process of a vertical movement plan for labors using discrete-event simulation. And then the process applies to MT 130 project, which is a virtual high-rise building construction project.
Keywords
Discrete-event simulation; A vertical movement plan for labors; High-rise building construction;
Citations & Related Records
연도 인용수 순위
  • Reference
1 안병주, '초고층건물공사 마감자재의 수직.수평이동계획이 통합된 의사결정모델,' 박사학위논문, 한양대학교 대학원, 2001
2 D. W. Halpin, 'An investigation of the use of simulation networks for modeling construction operations,' Ph. D. thesis, The Univ. of Illinois at Urbana-Champaign, IL, 1973
3 Photios G. Ioannou and Julio C. Martinez, (1996), 'Scalable simulation models for construction operations,' Proceedings of the 28th conference on winter simulation conference, Coronado, CA., pp. 1329-1336
4 Julio C. Martinez, 'STROBOSCOPE State and Resource Based Simulation of Construction Processes,' Ph. D. thesis, the Univ. of Michigan, Ann Arbor, Mich., 1996
5 Chang, D., 'RESQUE,' Ph. D. thesis, The Univ. of Michigan, Ann Arbor, Mich., 1987
6 Averill M. Law and W. David Kelton, 'Simlulation Modeling & Analysis 2nd Ed.,' Mc-Graw-Hill Internatinal Ed., 1991
7 '한국무역회관 공사보고서,' 극동건설(주), 1988
8 W. David Kelton, Randall P. Sadowski, and Deborah A. Sadowski, 'Simulation with Arena,' Mc-Graw-Hill Internatinal Ed., 1998
9 김재련, '컴퓨터 시뮬레이션 개정판,' 박영사, 1995
10 Sawhney, A., and AbouRizk, S. M. (1995), 'Simulation based planning method for construction project,' Journal of C.E.M., ASCE, Vol. 121, No. 3, pp. 297-303   DOI
11 K.J. Kim and G. Edward Gibson Jr. (2003), 'Interactive simulation modeling for heavy construction operations,' Automation in Construction, December, ELSEVIER, pp. 97-109
12 '초대형 고층 건물의 건축계획, 구조, 설비 및 시공기술 개발' 과제 중 '초대형 고층건물공사 현장 지원 시스템 개발에 관한 연구 보고서', 건설교통부, 1999
13 Paulson, B. C. Jr. (1978), 'Interactive graphics for simulation construction operations,' J. Constr. Div., ASCE, Vol. 104, No. 1, pp. 69-76
14 신성우 (2002), '세계적인 한국적 초고층 건축을 세워야 할때다,' 건축, 대한건축학회지, 제46권 제8호, pp. 57-59
15 '마감공사의 TACT 공정계획 수립을 위한 생산성 조사/분석,' 한양대학교, 2002