• Title/Summary/Keyword: 책임형 CM

Search Result 21, Processing Time 0.019 seconds

Benchmarking of US General Contractor's Pre-construction Services for a CM at Risk Project to Improve Contractor's Competitiveness (책임형 CM사 경쟁력 확보 및 선진화를 위한 미국 건설사의 시공이전단계 서비스 벤치마킹 연구)

  • Lee, Chang-Jae;Lee, Sang-Hyo;Ahn, Yong-Han
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.3
    • /
    • pp.9-18
    • /
    • 2017
  • Construction Management at Risk (CMAR) is a project delivery method that enables CM companies to deliver projects at a Guaranteed Maximum Price (GMP). General contractors can apply CMAR from the initial design phase right through the construction phase to reduce risks and improve project performance. One of the major advantages CMAR offers is that it permits a general contractor to provide a comprehensive suite of preconstruction services, including estimating, a constructability review, value engineering, drawings and a specification review, green building, and Building Information Modeling(BIM), among others. However, general contractors in South Korea currently provide only limited preconstruction services using CMAR because few CMAR projects have yet been implemented in Korea and their experience using the method is therefore limited. This benchmark study of how foreign general contractors utilize CMAR in their projects, particularly during the preconstruction process, its purpose, and the roles and responsibilities of each of the different participants in successful implementations thus provides invaluable information and will serve as a useful guide for Korean contractors seeking to incorporate CMAR preconstruction services in their projects and thus improve the competitiveness of their construction businesses.

A Study on the CM at Risk Business Model using Business Model Canvas (비즈니스 모델 캠버스(BMC)를 이용한 시공책임형 CM 비즈니스 모델에 관한 연구)

  • Park, Kyungmo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.23-31
    • /
    • 2016
  • The domestic market of CM at Risk has not been activated yet. It was analyzed duo to the fact that construction owners didn't have confidence in CM at Risk, because of the concerns regarding CM firms reliability, service, specialty, system and feasibility. Therefore, this study analyzed the problems to find the reason for declines in orders through a business diagnosis based on the Business Model Canvas(BMC) and set up the direction of business model improvement with one on one expert interviews. Additionally, we suggested the sub-activities for the business model improvements of CM at Risk service that are divided into 9 building blocks. Through this method, we determined that we would need preceding innovation activities such as good communication with customers, reinforcement of subcontract and excellence in project operations to convert the successful practice and settlement of the CM business model based in BMC. It is expected that the business model suggested from this study would contribute to improvement of CM at Risk competition and the differentiation strategy when compared with other firms. Also, it would be used a basis data to develop CM at Risk business model in the future.

CM at Risk Case Study on Guaranteed Maximum Price Contract - Focused on Cases for USA - (책임형 CM 발주방식의 최대공사비보증계약 사례연구 - 미국 공공발주 프로젝트 사례 중심 -)

  • Jeong, Jinhak;Han, Jonghoon;Lee, Joosung;Ahn, Yonghan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.22-30
    • /
    • 2019
  • The purpose of this study is to derive basic data of the Guaranteed Maximum Price(GMP) process and to present specimens that can be used at the time of execution of CM at Risk project in South Korea. CM at Risk project is issued in South Korea, but the actual data is lack. On the other hand, CM at Risk project is universalized and the market of the CM at Risk is steadily growing. Because of that, in this study, The United States cases was selected as a sample. GMP consists of CM's fee, CM contingency, project direct cost, project indirect cost, allowance. GMP negotiations are performed before the end of design completion, and after 3 rounds of estimation comparison, preliminary GMP is confirmed. GMP can be multiple contract and it is useful for Procurement of long lead materials and early construction. If the actual cost is lower than expected GMP, sharing of the saving is an option since the conflict of interests between the client and the contractor can occur.

Improvement through Analysis of Current Open Book Policy for the Korean CM at Risk (국내 시공책임형 CM 오픈북 정책 현황 분석을 통한 개선방안)

  • Park, Kyungmo;Kim, Changduk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.3-11
    • /
    • 2016
  • CM at Risk has been introduced in Korea to keep up with the global standards of construction management and provide a higher quality of cm service in line with a rapid change of the construction industry recently. However, it is widely considered that more time would required to settle down the system due to a lack of understanding towards CM at Risk, shortage of reliability and low capability to manage and undertake CM at Risk. Therefore, this research is analyzed problems of contract types, open book policies, and contract conditions of 33 numbers of projects undertaken by a bespoke domestic construction management firm in this research. Moreover, this research is suggested a method to establish an open book policy of CM at Risk aiming a better customers satisfaction through staff training, simplifying and improving a payment system, and a way to settle down an open book policy by improving a performance management system on site. It's expected that this research will contribute to a more competitive system with more dominating the market and a differentiation of the service so as clients to rely more on the CM at Risk.

Major Risk Factors to Implement CM at Risk Pilot Project on the Public Sector (시공책임형 CM 발주방식 공공부문 시범사업 사례를 통한 리스크 도출)

  • Han, Jonghoon;Kim, Kyungtae;Ahn, Yonghan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.61-69
    • /
    • 2018
  • The buildings are getting enormous and more complex as well as the requirement of the owner which wants diverse and efficient. Moreover advanced management is necessary for construction services and a new method of delivering project is now required. In order to expand the delivering method and the construction industry, we have to introduced the CM at Risk method. However, despite the fact that six years have passed already the CM at Risk regulation was introduced, the contract amount in significantly lower than that of the CM for fee, and also there is no CM at Risk project in the public sector. As a result, three pilot projects are currently underway for the LH(Korea Land & Housing Corporation) in order to set up a CM at Risk for the public sector. However, detailed regulations related to CM at Risk have not yet been implemented in Korea. Therefore, in this study, I am trying to understand the risks that could incur when practitioners participate in the three pilot projects that are currently underway and employed in the public sector wherein the CM at Risk is normally introduced. Based on the results of this study, It will be able to utilize as a basic data for future CM at Risk delivery system improvement and enactment.

An Analysis of Capability of CM at Risk in Major Construction Company (국내 대형건설회사의 책임형 건설사업관리 역량분석)

  • Yoo, Seung-Kyu;Choi, Seok-In;Son, Chang-Baek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.85-94
    • /
    • 2009
  • For the purpose of analysing the capability (knowledge, experience, and ability) of CM at Risk in the major construction company in korea, this study performed questionnaire survey with experts in the companies. Based on the analysis of the survey, the study was found as follows. 1) It is needed to increase the capability of preconstruction services, such as project management plan/manual, contract documents, value engineering, alternative analysis, time management, and claim. 2) Despite of gap of the capability between the present and the future CM services, the study concluded that the capability is sufficient to perform CM at Risk project in the major construction company.

A Study on the Application of Design VE Process in Pre-Construction Phase for GMP Determination of CM at Risk Project (시공책임형 CM 사업의 GMP 결정를 위한 시공이전단계 설계VE 프로세스 적용방안 도출)

  • Park, Bo-sung;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.56-64
    • /
    • 2022
  • Although pilot projects have been actively carried out from 2017 to present to institutionalize CM at Risk, one of the major tasks for innovation in the construction industry, standards and processes related to Design VE, a key tool for determining GMP in the pre-construction phase, have not yet been established. Therefore, through research and operation status related to CM at Risk and Design VE, and survey on project participants' perception, the problem of the existing design VE process was derived, and the design VE process suitable for the CM at Risk project was proposed. The application plan was proposed in three aspects: Schedule, Cycle, and Process, and the appropriateness and applicability were verified through FGI. The results of this study are expected to be used as basic data on the establishment and legislation of order standards to be made in the future.

A Current Status Study on the Introduction of CM at Risk on the Domestic Major Construction Company (국내 대형건설회사의 책임형 건설사업관리 도입 현황 분석)

  • Yoo, Seung-Kyu;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.5-8
    • /
    • 2009
  • This paper investigated the qualitative introduction status of domestic major construction company. And that focused on a point of suggestions about CM at Risk introduction. The survey analysis showed that three importan suggestions. First, the biggest obstacles factors to CM at Risk introduction that related laws is lagging amendment. Second, we have to improve the available hands ability in domestic major construction company. And last, we have to do that using uncomplicated design and standard design form. Consequently, environmen analysis for the introduction and example project is urgently required.

  • PDF

A Basic Study on the Evaluation Method for the Selection of Construction Responsible CM Operators in Korea (국내 공공부문 시공책임형 CM 사업자 선정을 위한 평가방식에 관한 기초연구)

  • Park, Bo-Sung;Lee, Tae-Hyeong;Bang, Hong-Soon;Kim, Ok-Kyue
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.298-299
    • /
    • 2018
  • The construction liability type CM has been introduced in the form of a pilot project through public institutions since 2017 since it was introduced in the term of construction responsibility type construction project management in the Basic Law of Construction Industry in 2011 with the aim of improving the constitution of the Korean construction industry and strengthening global competitiveness. Through the introduction of construction-responsible CM, the government intends to change the paradigm of the overall construction industry, including design and construction, construction costs, disputes between stakeholders, and transparency of business. In this regard, the study aims to compare and analyze the evaluation methods on the bidding guide that public institutions (LH) are currently using to select companies in order to lay the foundations for successful construction of construction-responsible CM ordering methods.

  • PDF