1 |
ENR. (2015). "The Top 100 CM at Risk." ENR, RS. Means, (Aug. 4, 2015).
|
2 |
Kim, E. J., and Yu, I. H. (2015). "Suggestions to Improve the System for Introducing CM at risk system of Specialty Construction Contractors." Korean Journal of Architectural Institute of Korea, 17(2), pp. 129-138.
|
3 |
Kim, E. J. (2014). "Suggestions to Strengthen Competitive Power of Domestic Specialty Construction Contractors by Activating CM at Risk." Korean Journal of Architectural Institute of Korea, 16(5), pp. 207-215.
|
4 |
Kim, J. G., Jung, J. H, and Lee, H. K., (2009). "The Corresponding Plan of Construction Enterprises for the Introduction of CM at Risk." Korean Journal of Architectural Institute of Korea, 11(1), pp. 159-167.
|
5 |
Koh, M.H., Kim, Y.S, Kwon, S.W, and Chin, S.Y. (2010). "Feasibility Analysis of Introducing CM at Risk Delivery Method to the Korea Public Construction Industry by Analyzing Attributes of the Projects," Korean Journal of Construction Engineering and Management, KICEM, 11(2), pp. 3-12.
DOI
|
6 |
Ministry of Land infrastructure and Transport(Molit). (2015) "Domestic Construction Management Capability in 2015. (Aug. 31, 2015).
|
7 |
Park, K., Lee, H.W., and Kim, C. (2014). "Assessment of risk management practices of CM enterprises: The need for an enterprise-level risk management framework." Korean Journal of Construction Engineering and Management, KICEM, 15(3), pp. 66-73.
DOI
|
8 |
Yoo, S.K., and Kim, J.J. (2009). "A Current Status Study in the Introduction of CM at Risk on the Domestic Major Construction Company." Journal of the Korea Institute of Building Construction, 9(1), pp. 5-9.
|
9 |
Yoo, S. K, Choi, S. I., and Son, C. B. (2009). "An Analysis of Capability of CM at Risk in Major Construction Company." Korean Journal of Construction Engineering and Management, KICEM, 10(5), pp. 85-95.
|