Analysis of the Causes of Defects in Fenestration Construction and Their Impacts on Construction Quality - Focused on Door Hardware - (창호철물공사 하자발생 원인과 시공품질 영향분석에 관한 연구 - 문(Door)에 사용되는 창호철물 중심으로 -)

  • Moon, Sang-Deok;Chung, Jae-Min;Ock, Jong-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.4
    • /
    • pp.341-350
    • /
    • 2013
  • For this study, a series of interviews with engineers in the Korean construction industry was carried out through a formal workshop format to analyze the causes of the inferior quality of builders' hardware. The authors established the causes of defects in window hardware construction in relation to the three aspects of system, design, and construction as involving the following seven factors: lack of system (including low ability to create construction specifications); low social awareness of the importance of window hardware; low technical capability to create design drawings; low design costs; small manufacturing capacity; low construction cost; and short duration of construction. Among the seven causes, the biggest cause of defects in window hardware construction is the lack of a system (low ability to create construction specifications), followed by low technical capability to create design drawings. In addition, this study carried out basic research to create measures to prevent defects in window hardware construction by analyzing how such causes of defects are distributed depending on the scale of architectural firms and construction companies during actual projects.

Analysis of Major Factors of Window Work in Construction Phase Considering Recurrence of Defects in the Maintenance Phase (유지관리단계의 하자 재발생을 고려한 창호공사 시공단계의 중점관리요소 분석)

  • Jeong, U Jin;Kim, Dae Young;Lim, Jeeyoung;Park, Hyun Jung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.6
    • /
    • pp.653-664
    • /
    • 2021
  • As the construction standards for energy-saving eco-friendly housing have recently been strengthened, the proportion of window work has increased with the demand for high-efficiency housing. Windows have high frequency of use, and there is the potential for many defects to occur depending on the characteristics of construction. According to a government agency's survey of defects in public rental apartment housing, defects in the windows work accounted for the highest portion of complaints received. Accordingly, related previous studies were considered, and it was found that the existing studies in Korea lacked research that reflected the construction characteristics of window work and the importance of maintenance. In addition, existing overseas studies considered both the constructor and the resident's position, considering the cost aspect together, and showed a trend of structuring the relationship between defects and causes. Therefore, this study will analyze the causes of defects that can occur in the construction phase of the windows work, reflect the construction characteristics, and derive major factors that consider the importance of maintenance based on the possibility of recurrence after repairing defects. Ultimately, this research will contribute to preventing defects in the construction phase and reducing maintenance costs by presenting a highly effective defect management plan through selecting the major factors for each defect type that can be intuitively judged by analyzing the causal relationship between defect types and causes.

A Priority and Impact Factor Analysis of Construction Management Tasks for Decreasing Change Orders and Defect Repairs in Cancer Treatment Center Projects (암센터 의료시설의 설계변경과 하자보수의 감소를 위한 중점 관리공사 분석)

  • Lee, Chijoo;Lee, Ghang;Sim, Jaekyang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.55-64
    • /
    • 2013
  • The complexity of constructing medical institutions is higher than that of general buildings, and many change orders in the design and defect repairs in the construction phase are required due to strict government regulations. The priority control of constructions and impact factors of medical institutions were analyzed in this study, and difficulties in the control in the design and construction phase were identified. First, the priority management factors that were identified were as follows: architecture, facilities, and electricity. Second, 1) priority management in constructions and factors resulting in change orders and 2) priority management in constructions involving defect repair were analyzed. Third, the importance recognized by the construction managers were analyzed. The priority management in constructions and factors that were recognized by the construction manager were deducted as having low importance, although there were many change orders and defects. The work of finishing, wall building, joining, office automation and communication function, and lighting were analyzed in the design phase, and waste, the office automation and communication function, ceilings, contamination control, and plumbing were analyzed in the construction phase. The results showed that there will be a decrease in change orders and defects if the concentration of the manager was elevated and priorities were managed.

A Study on the Application of TACT Planning & Scheduling in Finish Work of Apartment Houses (공동주택 마감공사에서의 택트공정관리 적용에 관한 연구)

  • Yoon You-Sang;Suh Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.422-425
    • /
    • 2003
  • The purpose of this study is using a TACT planning and scheduling for apartment houses construction that have many of same units. Because using a TACT planning and scheduling is concluded time reduction at same units as apartment plan. The main contents of this study are 1) window and door work through the field study, 2) adjust worker assignment to minimize work time variation, and 3) an effect of working time through a case study. As a result, the total working time can be improved $21.2\%$ by using the TACT planning and scheduling. The stu요 recommends that 1) establish an accurate data between work period and resource, and 2) preparation to measures minimization of waiting time before using a TACT planning and scheduling.

  • PDF

An Analysis of the Current State of Window Constructions in Small-scale Private Architecture in Consideration of the Energy Consumption Efficiency Rating System (소규모 민간건축에 있어서 에너지소비효율등급제를 고려한 창호공사 현황분석)

  • Kang, Suk-Pyo;Jin, Eun-Mi
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.1
    • /
    • pp.43-51
    • /
    • 2015
  • At present, in the case of small and medium window manufacturers in South Korea, glazing and window frame manufacturers are divided into separate businesses. However, in the fenestration energy consumption efficiency rating system and the energy-saving design criteria for buildings, the coefficient of overall heat transmission standard for windows is defined by window sets, which integrate glazing and window frames. At most construction sites, windows are constructed by installing separately supplied glass and frames. Research that can integrate the reality and the system is therefore necessary. The present study first investigated and analyzed the on-site situation of the fenestration energy consumption efficiency rating system. According to the results, while overall understanding of the fenestration energy consumption efficiency rating system was high, satisfaction with it was low, and the general practice at construction sites was to use windows assembled on site rather than integrated window systems manufactured at factories, thus making it difficult to confirm that the current rating system was well applied on site. Consequently, the reality of industrial sites must be reviewed and a realistic alternative to the fenestration energy consumption efficiency rating system must be presented instead of focusing on theory.

The Study on Integrated ACS and Lift Car System for Early Beginning of Windows Work in Tall Building Construction (초고층 창호공사 조기착공을 위한 ACS-Lift Car 연계 시스템 기초연구)

  • Lee, Dongyoon;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.72-73
    • /
    • 2014
  • Recently the concurrent construction method of framework and windows work has been applied for early beginning of exterior finishing works in tall building construction. However, the conventional method makes difficulties in auto-climbing of gang-form and climbing work of lift car since the removal of ACS(auto climbing system) should be preceded for operation of lift car up to the top floor. This study propose a concept model of integrated ACS and lift car system to resolve these problems and begin windows works early in tall building construction.

  • PDF

Improvement of Bill of Quantities of Door and Window Work for BIM-based Cost Estimation (BIM 기반 견적을 위한 창호공사 내역 작성체계 개선 방안)

  • Kim, Mi-Hyeon;Jo, Chan-Won;Yun, Seok-Heon
    • Journal of KIBIM
    • /
    • v.10 no.2
    • /
    • pp.12-20
    • /
    • 2020
  • Recently, interest in BIM technology has been growing in the domestic construction market as the number of construction projects requiring the application of BIM technology has increased. The use of BIM allows the use of various visualization functions through 3D models as well as drawing interference review, quantity calculation and integrated management of information. In particular, estimates of construction costs based on BIM can increase work efficiency by reducing the burden of calculating construction costs and managing them. In order to increase the efficiency of BIM-based cost estimates, it is necessary to improve the correlation between the BoQ(Bill of Quantity) information and the BIM model. For this purpose, the ratio of the amount and item to the detailed construction of the current BoQ was analyzed, especially the problem of the calculation of construction cost in the window work in this study. In addition, we would like to suggest a method for systematically linking the BoQ information with the BIM model by improving the BoQ information structure of the window work. It is expected that this will increase the efficiency of the quantity calculation and analysis work of construction cost of window work. In addition, it is expected that this method will help to analyze and predict changes in construction cost of windows and doors by facility characteristics and type.

A Study on the Derivation of Key Management Elements by Defect Type in the Work Stage of Window Construction (창호공사 작업단계의 하자유형별 핵심관리요소도출에 관한 연구)

  • Jung, Dae-Gyou;Lee, Han-Young;Kim, Hyoung-Woo;Lee, Dong-Yeop;Park, Hyun-Young;Kim, Dae-Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.337-338
    • /
    • 2023
  • As the number of defects in apartments has increased recently, lawsuits and disputes related to defects have also increased. As a result, the loss of time and money is enormous. Therefore, fundamental measures are needed to reduce the occurrence of defects. Therefore, the purpose of this study is to propose a plan to reduce defects, focusing on window construction. To this end, existing studies were reviewed, and data from domestic construction companies were collected and classified to organize the types of defects. Based on the classified data, eight types with a high incidence of window glass were analyzed according to the time of occurrence, and the cause and causal relationship of the defect were schematized. It aims to identify the degree of possibility of recurrence of defects for each of the eight defect types for experts and derive key management elements using the RII method. Therefore, the goal is to select key management elements of window construction that actively reflect the characteristics of the construction stage.

  • PDF

Developing Response Plan for the Direct Buying System for SME's Construction Materials based on the Analysis of Material Procurement Management Load: Focused on the Owner Providing Public Apartment Housing (지급자재 조달관리부담 평가에 기초한 중소기업 공사용자재 직접구매제도 대응방안: 공공아파트를 공급하는 발주자를 중심으로)

  • Song, Sang-Hoon;Bang, Jong-Dae;Sohn, Jeong-Rak
    • Land and Housing Review
    • /
    • v.4 no.4
    • /
    • pp.425-434
    • /
    • 2013
  • The Small and Medium Business Administration specified 123 construction materials mandatory to purchase directly and forced the public owners to provide the contractors with materials as required by related law. This study extensively reviewed various characteristics and management factors of the owner-providing materials consumed in the public apartment housing under Direct Buying System(DBS) from the public owner's perspective. Subsequently, the major managed materials were identified, and the proper response plan was developed along the material procurement process. The Procurement Management Load Indices (PMLI) of 43 materials were evaluated according to rating criteria with procurement path, project-specified level, user requirement level, supplier's responsibility, on-site work requirement, additional parts, and inspection standards. The tile and aluminum windows were classified in the group needing high-level procurement efforts to reduce the errors and ensure the efficiency. The accurate quantity estimation method, definite purchase details, management activity definition before and after production, additional quantity for rework, interference coordination were defined as the essential activities for effectively responding to DBS.