Developing Response Plan for the Direct Buying System for SME's Construction Materials based on the Analysis of Material Procurement Management Load: Focused on the Owner Providing Public Apartment Housing  

Song, Sang-Hoon (한국토지주택공사 토지주택연구원)
Bang, Jong-Dae (한국토지주택공사 토지주택연구원)
Sohn, Jeong-Rak (한국토지주택공사 토지주택연구원)
Publication Information
Land and Housing Review / v.4, no.4, 2013 , pp. 425-434 More about this Journal
Abstract
The Small and Medium Business Administration specified 123 construction materials mandatory to purchase directly and forced the public owners to provide the contractors with materials as required by related law. This study extensively reviewed various characteristics and management factors of the owner-providing materials consumed in the public apartment housing under Direct Buying System(DBS) from the public owner's perspective. Subsequently, the major managed materials were identified, and the proper response plan was developed along the material procurement process. The Procurement Management Load Indices (PMLI) of 43 materials were evaluated according to rating criteria with procurement path, project-specified level, user requirement level, supplier's responsibility, on-site work requirement, additional parts, and inspection standards. The tile and aluminum windows were classified in the group needing high-level procurement efforts to reduce the errors and ensure the efficiency. The accurate quantity estimation method, definite purchase details, management activity definition before and after production, additional quantity for rework, interference coordination were defined as the essential activities for effectively responding to DBS.
Keywords
Construction Materials; Direct Buying System; Material Characteristics; Procurement Management Load;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 하영서, 유정호, 김창덕(2009), "자재물류관리를 위한 자재 속성별 자재관리 프로세스 모델: ETO 범주 자재를 중심으로", 한국건설관리학회논문집, 10(1): 16-25.   과학기술학회마을
2 김대식(2011), "공공공사용 자재 직접구매제도 발전방안", 지방자치법연구, 11(1): 99-119.
3 이규재(1999), "제8장 조달관리", 건설경영공학, 기문당.
4 이상범(2004), "건설자재의 적정 리드타임 산정에 관한 연구", 한국건축시공학회 논문집, 4(1): 105-110.   과학기술학회마을   DOI   ScienceOn
5 이창민(2009), 공사용자재 직접구매 활성화 방안, 중소기업연구원.
6 이현수, 송상훈, 김우영(2002), "정보 분석을 통한 자재관리 프로세스 재설계", 대한건축학회논문집, 18(11): 125-132.   과학기술학회마을
7 전재열(1999), "제4장 건설생산체계", 건설경영공학, 기문당.
8 조달청 시설사업국(2010), 공사용자재 직접구매 제도, 조달청.
9 중소기업청(2011), 중소기업관련통계, 중소기업청.