Development of an Operation Model for Technical Proposal-Based Tender of Public Construction Projects (공공건설공사의 기술제안형 입찰 운영모델 개발)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.136-145
    • /
    • 2008
  • Recently the Ministry of Finance and Economy of Korea launched two new project delivery systems called "Best Value Contract (Design-Bid-Build)" and "Bridging Contract (Design-Build)" in October of 2007 by revising enforcement ordinances of "Act on Contracts to Which the State is a Party". These project delivery systems require the bidders to submit technical proposal adjusted to the project characteristics and objectives for selecting the contractor by evaluating technical proposals. This research aimed to suggest guideline to effectively operate the project delivery systems described above. To reach the goal of the research, the framework of the operation model was developed, which includes the four categories: the standard bidding process, the technical proposal requirements, the technical proposal evaluation criteria, and the award methods. The contents of the four categories above were fulfilled throughout conferring with the advisory experts. In particular, the award methods, which are the important decision-making factor in the perspective of the owner, consist of four types: Low Bid-Fully Qualified, Weighted Criteria, Adjusted Bid, and Adjusted Score. The quantitative features and application criteria of these four types of award methods were suggested throughout the simulation using the virtual case.

법령과고시 - 지방계약법 계약예규 개정

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.276
    • /
    • pp.53-55
    • /
    • 2013
  • 안전행정부가 지방 중소기업의 입찰참가 기회를 확대와 하도급업체 보호 강화를 주요내용으로 하는 "지방자치단체 입찰시 낙찰자 결정기준"과 "지방자치단체 입찰 및 계약집행기준" 예규를 개정하고 7월 1일부터 시행에 들어갔다. 개정된 예규에 따르면 중소기업 지원과 입찰 참여 확대를 위해 5억원 미만 주계약자공동도급 공사에 접근성 평가를 도입해 지역 중소업체의 입찰 참가를 확대하도록 했으며, 하도급업체 보호를 위한 방안으로 원도급자가 하도급계약을 체결하면서 지나치게 하도급금액을 낮추거나 하도급 표준계약서를 사용하지 않거나 하도급 내용을 부당하게 변경하는 등의 사례를 방지하기 위해 공사 적격심사기준을 강화했다.

  • PDF

A Study on the Bidder Evaluation System Using the Technology Proposal-Based Best Value System (기술제안입찰형 최고가치 낙찰제도 입찰자 평가체계에 관한 연구)

  • Yeo, Sang-Ku;Lee, Hyun-Chul;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.124-136
    • /
    • 2010
  • International construction market has been depressed significantly after 2000. Exclusive techniques and advanced construction management methods are desperately in demand so as to ensure the competitiveness in unlimited competition. Although public construction delivery system has been revised several times starting with introduction of the lowest bidding system in 1951, there has been no remarkable achievement whenever new system was introduced. This study analyzed the successful stories of developed countries like Europe, USA and Japan to settle successful rating system down and vitalize the best value system in Korea, which was introduced in October 2007. We constructed the bidder evaluation system for domestic situation, and designed the evaluation tool which is useful in utilization. Since this study were analyzed on only same systems of developed countries and domestic similar cases, this study is limited to typical construction in Korea. The study of specialized rating system in the field related should be followed.

Orders Status Analysis on the Successful Bidder Decision Method of Turnkey Alternative Tendering Construction (턴키·대안입찰공사 낙찰자 결정방식에 의한 수주현황 분석)

  • Park, Hong-Tae;Lee, Yang-Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.771-780
    • /
    • 2013
  • Inspection system which was performed in the past selected the final winning bidder by separating Pre-Qualification, the basic design evaluation and price evaluation. However, turnkey and alternative bidding construction has selected way to determine the successful bidder as the best design and the most low cost method, comprehensive evaluation method (bid price adjustment, design score adjustments, weights standard), the best design and the fixed amount method from january 1, 2010 to the present. Due to these institutional problems, orders institutions were often a way to determine the successful bidder to apply differently for identical or similar construction. Therefore this study winning bidder selection criteria through analysis of construction the number and construction order performance, order performance by work division and institutional orders, the weights bidder order performance and orders status of turnkey alternative tendering construction to civil part performed in domestic.

A Study on the Evaluation System for Bidders to According to the Best Value Bid System by Technology Proposal Method (기술제안방식의 최고가치낙찰제도 입찰자 평가체계에 관한 연구)

  • Yeo, Sang-Ku;Lee, Gun;Lee, Hyun-Chul;Go, Seong-Seok
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2009.04a
    • /
    • pp.211-216
    • /
    • 2009
  • Bidding systems in the domestic public construction work have been amended many times since the lowest-bidding system was implemented in 1951. However, this hasn't had much success. Competition in technical development among companies has declined as the contracts for buildings are given to company which submits the lowest price without considering traits of projects. In addition, as the construction market turns to the limitless competition system due to FTA(Free Trade Agreement), advanced techniques are needed to promote the national competitive power. Considering the needs of the times, Korean government announced that "Best Value Contract (Design-Bid-Build)" and "Bridging Contracts (Design-Build)" are included to 4 existing bidding systems in October 2007. Thus this study aims to suggest devised the evaluation criteria including major items for evaluating bidders, in order to establish and revitalize the best-value bid system successfully.

  • PDF

Orders Status Analysis on the Successful Bidder Decision Method of Civil Turnkey.Alternative Tendering Construction (개선된 낙찰자 결정방식에 의한 토목 턴키.대안입찰공사 수주현황 분석)

  • Park, Hong Taea;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.2
    • /
    • pp.164-177
    • /
    • 2013
  • From 2010 years to 2013, the selection method of successful bidder has been changed design suitable lowest method, comprehensive evaluation method(bid price adjustment, design score adjustments, weight standards), fixed amount best design method. Therefore this study was presented by analyzing the impact on the domestic construction industry according the way to determine the successful bidder, the evaluation order method and the operational issues through the analysis of order status, order number, results of acceptance an order, success rate range, results of acceptance an order according to weight success rate, results of acceptance an order by work type and order institution of a turnkey alternative tendering construction performed in domestic civil part.

Deduction on The Problems and Improve The Way of The Successful Bidder Determination Method for Turnkey·Alternative Bid Construction (턴키·대안입찰공사 낙찰자 결정방식의 문제점 및 개선 방안 도출)

  • Park, Hong-Tae;Lee, Yang-kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1881-1891
    • /
    • 2014
  • Full system of turnkey deliberation committee in 2010 was abolished and permanent Deliberation committee was introduced. So far, ordering organization selected the best method suitable for the design and comprehensive evaluation method in the turnkey bid construction. Comprehensive evaluation method have bid price design score coordination, weighted basis, the best design approach fixed amount, five successful bidder decision method in addition. Design deliberation branch committee in the successful bidder decision way configured and operated branch members of special design consultation committee, But main agent changed from committee deliberation pull system to permanent committee deliberation, as well as and The lobby burden was not improved. This similar to the past at the portion of the design deliberation and the way of the design deliberation in the turnkey bid construction. Therefore it is necessary to improve the design deliberation system. In other words, design score and technology competition should be adapted to determine a successful bid. This study suggested the operating system of the design deliberation, the decision method problems of the successful bidder and ways to improve the design deliberation.

A Selection Model of Suitable Tendering System for Public Construction Projects (공공건설공사의 최적 입찰방식 선정모델)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.164-174
    • /
    • 2008
  • It is crucial In decision making to select a project delivery system (PDS) adjusted accordingly to the project characteristics. Furthermore, selecting a tendering system is the kernel in the process of selecting PDS. In October 2007, the Ministry of Finance and the Economy of Korea launched two new project delivery systems, "Best Value Contract (Design-Bid-Build)" and "Bridging Contracts (Design-Build)" by revising enforcement ordinances of "Act on Contracts to Which the State is a Party" to provoke the tendering systems. In order to support the proposed purpose, this research developed a selection model for suitable tendering system, which helps a public owner select a tendering system appropriate to the project characteristics. First, the framework of the model was set throughout analyzing previous researches and interviewing relevant experts. Additionally, by analyzing the survey result from 265 experts engaged in architectural and civil engineering business, the relative weights of the selection factors and the effectiveness values of the alternatives were suggested as the quantitative evaluation references. Finally, the practical guideline was suggested to apply this model to three public projects scheduled to be delivered. The result of applying the model to three case projects showed that further researches were needed to make the selection process logical and to suggest the standard weights and effectiveness values according to project type.

해외건설공사 수행절차(9) - Converted Lump Sum Turnkey 계약방식

  • 해외건설협회
    • 월간 기계설비
    • /
    • s.223
    • /
    • pp.75-78
    • /
    • 2009
  • 전통적으로 주요 EPC(설계, 구매, 시공) 공사는 최초의 엔지니어링 작업(FEED : Front End Engineering Design)을 한 후, 경쟁입찰을 하여 총액계약(Lamp Sum)으로 공사를 수행했다. 최근에 EPC시공자의 위험부담을 줄이는 한편, 발주자는 경쟁적인 시공자를 확보할 수 있는 기회를 확대하면서 협상기간을 단축하교 조기착공을 위해, Lump Sum 가격을 늦게 결정하는 방법을 고려한다. CLST(Converted Lump Sum Turnkey)계약방식은 최초의 엔지니어링 작업을 한 후 경쟁입찰을 통해 1차 계약을 맺고(설계 및 특별 자재 공급에 대한) 공사를 수행하다 설계가 충분히 진행되고 핵심자재에 대한 견적이 입수되어 발주 가능한 시점 및 하도급사를 선정할 준비가 된 시점에서 1차 계약을 변경해 2차 계약을 맺는다. 2차 계약 시 1차 시 맺은 계약조건(직접공사비, 일반관리비 및 이윤, 최대한도 금액이 포함됨)을 기준으로 하되, 발주자가 Open Book 형식으로 공사비를 평가하고 재협상하여 Lump Sum 금액으로 전환해 합의한다. 이후 Lump Sum Tumkey 계약과 동일한 형식으로 공사를 수행한다.

  • PDF

법령과고시 - 정부시설공사 계약예규 개정

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.262
    • /
    • pp.48-52
    • /
    • 2012
  • 기획재정부와 행정안전부는 계약 예규를 개정하고 지난 4월 2일부터 시행에 들어갔다. 기획재정부는 이번 계약예규 개정을 통해 등록기간 3년 미만 업체가 공동수급제에 참여할 경우 만점기준을 완화했고, 1억 이상 3억 미만 전문공사의 경우 만점기준이 발주금액에 대한 '3년 실적의 1/2배 이상'에서 '평가면제'로, 3억 이상 50억 미만 전문공사의 경우 '3년 실적의 2배 이상'에서 '1/2배 이상'으로 평가방법을 완화했다. 또한 발주기관에서 공공공사 예정가격을 산정할 경우 반드시 최신 표준품셈을 사용하도록 의무화했으며, 적정 노무비 보장 심사 강화 방안으로, 최저가낙찰제 공사에서 업체가 제출한 노무비가 발주기관에서 산정한 노무비의 80% 미만일 경우 탈락된다. 기획재정부는 이번 개정으로 시공경험이 부족하지만 기술력 등이 우수한 신설 중소 업체가 공공공사에 참여할 수 있는 기회가 늘어날 것으로 기대하고 있으며, 최저가낙찰 시 과다한 노무비 삭감 등으로 인한 건설 근로자 소득감소 및 내국인 건설업 기피 등을 막을 수 있을 것으로 기대하고 있다. 한편 행정안전부는 이번 계약예규 개정을 통해 지방자치단체 입찰 및 계약관련 예규를 현행 11개에서 2개로 통합했고, 지자체가 발주하는 50억원 이상~100억원 미만의 공사의 경우 참가자격 적격심사 항목 중 자산회전율 평가를 삭제했으며, 신용평가 등급을 완화해 지방 중소기업들의 입찰 참가 기회를 확대하기로 했다.

  • PDF