기술제안방식의 최고가치낙찰제도 입찰자 평가체계에 관한 연구

A Study on the Evaluation System for Bidders to According to the Best Value Bid System by Technology Proposal Method

  • 여상구 (전남대학교 대학원 건축공학과) ;
  • 이건 (전남대학교 대학원 건축공학과) ;
  • 이현철 (전남대학교 대학원 건축공학과) ;
  • 고성석 (전남대학교 건축학부)
  • 발행 : 2009.04.16

초록

Bidding systems in the domestic public construction work have been amended many times since the lowest-bidding system was implemented in 1951. However, this hasn't had much success. Competition in technical development among companies has declined as the contracts for buildings are given to company which submits the lowest price without considering traits of projects. In addition, as the construction market turns to the limitless competition system due to FTA(Free Trade Agreement), advanced techniques are needed to promote the national competitive power. Considering the needs of the times, Korean government announced that "Best Value Contract (Design-Bid-Build)" and "Bridging Contracts (Design-Build)" are included to 4 existing bidding systems in October 2007. Thus this study aims to suggest devised the evaluation criteria including major items for evaluating bidders, in order to establish and revitalize the best-value bid system successfully.

키워드