A Reduction of Claims for Efficient Turn-key Project (효율적인 턴키사업 추진을 위한 클레임 저감방안)

  • Oh, Ye-Keun;Sohn, Jeong-Rak;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.122-130
    • /
    • 2012
  • Currently, TK(Turn-key) projects have been implemented, the projects on TK basis still have shown several problems rather than its own merits as a bidding method. Increasing the number of claims being occurred during construction process of the projects is reality because of unclear notice of tender documents and conditions of the contract, design review system, and decision process of the qualified bidder. To establish desirable TK projects in domestic market, not only should resonable alternatives for carrying out design review system and selecting the bid winner be set up, but also proper standards for reforming irrational system of contract, bid, and notice of tender related to TK projects. This study is intended to reduce the number of claims and implement efficient projects of apartment construction on TK basis by identifying potential problems through analysis of claim examples of TK projects which have difficulties of revising contract agreement such as drawings and suggesting improvement methods for contract conditions and notice of tender docuements.

해외건설공사 수행절차(3)

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.8 s.217
    • /
    • pp.64-67
    • /
    • 2008
  • 해외공사는 주로 해외지점망, 외국설계회사, 발주자 또는 기존 현장을 통해 입수한 공사정보(공사비 및 공사개요, 재원, 발주자, 설계회사, 입찰일정 등)를 토대로 입찰참여 여부를 결정하며, 입찰 자격심사(PQ : Pre-qualification)를 거쳐, 입찰서를 발급받아 견적서를 작성하고 입찰에 임하게 된다. 입찰, 수주활동을 하는 동안 주요사항을 국토해양부 및 해외건설협회에 단계별로 소정의 양식에 의거 보고한다. 주요보고사항 $\Delta$ 수주활동상황보고(입찰예정일 10일 전까지) $\Delta$ 계약체결결과보고(계약체결 15일 이내) $\Delta$ 시공상황보고(매분기 종료후 30일 이내) $\Delta$ 공사내용변경보고(변경 15일 이내) $\Delta$ 준공보고(준공증명서 발급 15일 이내)

  • PDF

조달청, 조달행정쇄신 방안

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.59
    • /
    • pp.30-33
    • /
    • 1995
  • 조달청은 지난 5월 23일 조달행정쇄신방안을 마련, 현행 가격위주 낙찰제도를 품질확보를 위한 계약제도로 개선한다는 방침 아래 2단계 경쟁입찰제, 경쟁적 협상계약 제도를 도입하는 등 다양한 조달 방식을 마련, 재정경제원 등 관계부처와 협의를 통해 예정가격 작성준칙 등 관계규정을 개정해 올해안에 시행하기로 했다.

  • PDF

Development of Fairness Evaluation Index for the Construction Industry (건설산업의 공정성 평가지수 개발)

  • Lee, Chijoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.16-27
    • /
    • 2022
  • This study analyzed both the legal system regarding fair trade and the types of unfair trade in the construction industry. Then, it derived the factors with which to evaluate the level of fairness. These factors were classified by each type of participant in the construction industry, such as general contractors and subcontractors, and each construction stage, such as bidding, contracting, and construction. The perceived fairness level of factors was analyzed using a survey of 238 employees of general contractors and subcontractors. Next, the study developed a fairness index for the construction industry. The index showed that subcontractors perceived the level of fairness more negatively than general contractors, but both perceived the construction stage of the industry as having the lowest level of fairness. General contractors perceived the bidding and contracting stages as having the highest fairness levels, and subcontractors perceived the contracting stage as having the highest level of fairness. The developed fairness index identified the evaluation factors that need improvement and the fairness level perceived by each type of participant at each stage of construction. The results of this study can contribute to establishing measures that improve the level of fairness in the construction industry.

An Analysis of Concentrate Competency in Bidding Process for Overseas Project of Domestic Construction Companies (국내건설기업의 해외 프로젝트 입찰단계 우선집중역량 분석)

  • Kim, Ji Hyung;Kim, Yea Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.23-30
    • /
    • 2014
  • Overseas construction orders of domestic companies had been increased significantly in a short period from $10.9 billion in 2005 to $64.9 billion in 2012. However experts are concerned that quality of growth will not support quantitative growth. This study suggest concentrate competencies for not only winning in bid but also successful execution of domestic companies. 4 Steps which are Pre-Marketing, Bid-Preparation, Bidding, Contract Phase are defined for competency assessment. After drawing specific tasks by phase, survey asking importance and capability of the tasks to the person in charge of bidding and site was conducted by utilizing Likert 7 point scale. According to the result of IPA analysis, domestic construction companies need to ensure internal competencies; Project risk review, Bid team organization, and external competencies; Client needs grasp, Localization strategy, Cooperation establishment. Hearafter domestic construction companies will be able to utilize the result of the study for setting bidding strategy for winning in bid and improving earning rate.

Application of Modifiable Bid of BOQ in Garak Market Modernization Project Phase 1 (가락시장현대화사업 1단계 물량내역수정입찰 적용 사례)

  • Cho, Kyung-Je;Kim, Hyung-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.111-112
    • /
    • 2015
  • Garak Market Modernization Project Phase 1, which is the public projects worth 1,75 billion won, was delivered by adopting modifiable bid of BOQ on the lowest price award system. The modifiable bid of BOQ system allows bidders to modify quantities based on their own drawings and construction specifications and requirements. It was initiated by the government for minimizing design error and for inducing technical competition between tenders by checking errors. At that time the bidding, it allowed modifying the BOQ all the works. In the construction phase, the responsibility for the design changes, due to mistakes and omissions on design documents and BOQ were disputed between the owner and the contractors. This study analyzed the problem of the system and addressed a need of improvement.

  • PDF

A Sduty of Analyzing Claim Factor and Making Strategies to Prevent Claim in Bidding and Contracting Stage for Architectural Turn-Key Project (건축턴키공사 입찰.계약 단계에서의 클레임 예방을 위한 클레임요인 분석 및 대응방안에 관한 연구 - 국내대형건축턴키공사 사례중심으로 -)

  • 윤준선;백준홍
    • Journal of Arbitration Studies
    • /
    • v.13 no.2
    • /
    • pp.353-376
    • /
    • 2004
  • In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of pre-construction(from a bid to a contract) owing to the specialties of the turn key constructions. So the claim factors of the Korean turn key constructions were abstracted through the literature searches, the site document examinations, the case studies and the interviews with the experts. When the technicians meeting the interior turn key constructions for the first time and working here now are well acquainted with only these factors, many claims will be prevented. By analysing the degree of claims by claims factors through the questionnaires to the experts about the abstracted factors and surveying the amount of the claims through the case studies, what factors exerted how much of influence on the claims was tested and analyzed. Proposing the response devices to the factors affecting the claims much led the technicians in charge of internal turn key constructions to the prevention and the proper solution of the site claims.

  • PDF

The Development of Risk Management Process Model during Bidding Phase for Success of Oversea Construction Projects (성공적 해외건설사업을 위한 입찰단계의 리스크 관리 프로세스 모델 개발 - 발전 플랜트 EPC 사업을 중심으로 -)

  • Seo, Jae-Pil;Ryu, Han-Guk;Son, Bo-Sik;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.76-86
    • /
    • 2016
  • Recently, the Contracts of International Construction Business has been decreased from the beginning of 2015 in Korea, although it has been steadily increased until 2014. This trend could be caused by Low-Price Contracts, the lack of Know-how and experience in operating, the poor management of Claims and Low-Profitability in Business. It has been recognized that the qualitative improvement of Business Contacts are necessary for successful Projects. In the Bidding Process, therefore, Experience data as In-House Data and Lessons Learned for projects should be strategically involved to assure riskless offers. Accordingly the Proposal Process are needed to be organized and enhanced by including processes for risks review about technical, marketing and commercial part during the bidding. This paper proposes a Risk Management Process model during Bidding Phase, using Risk Evaluation Method through the project life-cycle. The Concept of Model is to define CSF (Critical Success Factor) in the bidding process and Risk Factors are linked to CSF and Organization based on RAM (Responsibility assignment matrix).

A Study on the Effect of the Bidding Stage Factors of Logistics Outsourcing Service on Trust, Cooperation and Service Satisfaction (물류아웃소싱 서비스의 입찰단계 요인이 신뢰, 협력 및 서비스 만족도에 미치는 영향에 관한 연구)

  • Lee, Nam-Seung;Song, Sang-Hwa
    • Journal of Korea Port Economic Association
    • /
    • v.36 no.2
    • /
    • pp.19-36
    • /
    • 2020
  • The bidding phase for logistics outsourcing services is critical for both shippers and logistics companies. According to the logistics bidding phase, the shipper should provide logistics operation information to logistics companies to resolve uncertainty. In addition, the logistics company can win the contract volume that was placed in the bid by expressing their experience and know-how, and proposing to share the risks and benefits of the shipper's logistics operation. Therefore, it is necessary to examine the factors that can be identified during the bidding phase for logistics outsourcing and how these factors affect the satisfaction of logistics outsourcing services. Based on the factors identified in the preceding studies on logistics outsourcing partnership factors and those on logistics outsourcing determinants, a survey was conducted on experts engaged in logistics companies, performing logistics for domestic shippers and analyzed using Smart-PLS. This study presents the following implications. First, in the logistics bidding phase, the shipper should provide its logistics operation information to logistics firms to resolve uncertainties. Details An in-depth explanation of the operation details will be presented via the bidding presentation, and on-site tours of manufacturing plants and logistics centers should also be carried out if necessary. Second, in the bidding phase, logistics companies should appeal through proposals to their competitiveness, such as experience and knowledge of the logistics of the shipper, and also consider alliances with other logistics companies to supplement their insufficient logistics services. Third, logistics companies should make proposals to share profits and risks through logistics outsourcing during the bidding phase, propose accepting risks from environmental uncertainties of the shipper within its capacity to an acceptable extent, and share the benefits of carrying out the shipper's logistics.

An Analysis of the Importance of the Risk Factors Influencing the Calculation of the Subcontract Construction Bidding Cost (건설공사 하도급 입찰단가 산정에 영향을 미치는 리스크 요인의 중요도 분석)

  • Lee, Sung-Goo;Park, Tae-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.109-117
    • /
    • 2007
  • The construction environment has the trend of oversizing and professionalizing, the increase of the construction period, and the risk factors and the uncertain factors which are important in the construction bid. The misunderstanding and the lack of knowledge of the subcontractor result in the decrease of the profit or the deficit. In conclusion, these are supposed to give the financial burden to the subcontractor. So, it is very important to predict the construction preparation cost calculation by the risk factors in the bidding stage and to calculate the bid unit cost considering the target profit of the subcontractor in the process of the mutual agreement and performance of the contract. In these points of view, this study analyzes how the importance of the risks influencing the bidding cost calculation affect the construction cost, and this analysis can be used as the basic data to establish the suitable bid strategy of the subcontractor.