Abstract
The construction environment has the trend of oversizing and professionalizing, the increase of the construction period, and the risk factors and the uncertain factors which are important in the construction bid. The misunderstanding and the lack of knowledge of the subcontractor result in the decrease of the profit or the deficit. In conclusion, these are supposed to give the financial burden to the subcontractor. So, it is very important to predict the construction preparation cost calculation by the risk factors in the bidding stage and to calculate the bid unit cost considering the target profit of the subcontractor in the process of the mutual agreement and performance of the contract. In these points of view, this study analyzes how the importance of the risks influencing the bidding cost calculation affect the construction cost, and this analysis can be used as the basic data to establish the suitable bid strategy of the subcontractor.
건설산업의 환경은 대형화, 전문화의 추세와 공사이행기간의 증가와 건설공사의 입찰에 있어서 중요한 리스크 요인과 불확실 요인이 존재하게 되었으며 하도급자의 판단오류 및 인식부족은 이윤감소 혹은 적자를 초래하게 되며, 이는 결과적으로 하도급자에게 재정적 부담을 주게된다. 따라서 입찰단계에서의 리스크요인에 의한 공사예비비 산정을 예측하고 계약의 합의와 이행 과정에서 하도급자의 목표이윤 확보를 고려한 입찰단가를 산정하는 것은 매우 중요하다. 이러한 취지에서 본 연구는 하도급자의 공종별 사례로 선정하여 입찰금액 산정에 미치는 리스크에 대한 중요도가 공사비에 미치는 영향정도를 기초로 하여 분석하고, 이를 바탕으로 하도업자의 합리적인 입찰전략을 수립하는 기초자료로 활용하는데 있다.