• Title/Summary/Keyword: 액티비티

Search Result 106, Processing Time 0.029 seconds

A Study on the Actual Condition and Development of BCWS Management In Large Apartment Complex Project (대단지 아파트 건설공사의 계획기성 관리실태에 관한 연구)

  • Kim Sang-Hee;Yang Yong-Cheol;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.434-437
    • /
    • 2003
  • In apartment project, BCWS is a critical management factor and has a great influence on the success of the project. But due to the characteristics of large apartment complex, there are several problems in making out a time schedule of work as well as production and management of precise bcws from the allocation of resources. In this study, Actual condition survey was executed in terms of the calculation and the management of BCWS. This study propose better solutions for efficient calculation of bcsw through the analysis of the problems and the origins relating to BCWS from a field area.

  • PDF

A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase (BIM 기반의 시공단계 견적데이터를 활용한 일일 진도관리모델 구축 방안)

  • Jung, Jun-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.23-34
    • /
    • 2011
  • Reliable progress management at construction requires integrated information of cost and schedule, and information is used as a basis for project performance measurement. However, separate handling of cost and schedule information at construction projects makes objective measurement more difficult and decreases management productivity due to additional works for breaking down bill of quantities into corresponding activities. Recently, research related to BIM addresses issues on effective progress management based on BIM with incorporation of daily progress management. Therefore, the objective of this paper is to propose information model for daily progress rate and budgeted cost of work performed by utilizing BTM-based quantity and location information.

Design of Test Cases and Automatic Generation of the Test Code for UI Unit Test of an Android Application (안드로이드 애플리케이션 UI 단위 테스트를 위한 테스트 케이스 설계 및 테스트 코드 자동 생성)

  • Yun, Sang-Pil;Seo, Yong-Jin;Ko, Min-Hyuk;Kim, Hyeon-Soo
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2012.06b
    • /
    • pp.129-131
    • /
    • 2012
  • 세계 스마트폰 OS 시장의 절반 이상을 차지한 안드로이드는 향후 태블릿, 스마트 TV, 자동차 등으로 시장의 확대가 전망된다. 현재 안드로이드 OS를 기반으로 수많은 애플리케이션이 개발되고 있지만 애플리케이션의 신뢰성을 보장하기 위한 연구들은 부족한 상태이다. 이는 안드로이드 애플리케이션이 GUI를 기반으로 동작하기 때문에 기존의 테스트 방법을 적용하기 어렵기 때문이다. 구글에서 애플리케이션 테스트를 위한 환경을 제공하지만 개발자가 이를 활용하여 효율적인 테스트 코드를 작성하는 것은 쉽지 않다. 이 논문에서는 안드로이드 앱 개발에서 GUI 구현의 기본 단위인 액티비티에 대한 단위 테스트 방법을 제시한다. 이를 위해 테스트 케이스 설계 방법과 테스트 수행 코드를 자동으로 생성하는 프로그램을 구현한다. 이 방법을 통해 개발자는 쉽게 테스트 코드를 생성할 수 있으며 신뢰성있는 앱을 개발할 수 있다.

An Extension of UML Activity Diagram for Generation of XPDL Document (XPDL 문서 생성을 위한 UML 액티비티 다이어그램의 확장)

  • Wang Bo;Kim, Jae-jung;Yoo, Cheol-Jung;Chang, Ok-Bae
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2003.10b
    • /
    • pp.247-249
    • /
    • 2003
  • Currently there are a variety of different tools may be used to analyze, model, describe and document a business process. However, it is difficult to exchange the information of a business process created in different tools because of the distinct information formats used in different tools. The XML Process Definition Language (XPDL) of the Workflow Management Coalition (WfMC) forms a common interchange standard that enables products to continue to support arbitrary internal representations of process definitions with an import/export function to map to/from the standard at the product boundary. Generally a business process model can be represented by the UML activity diagram, but there is a difficult task to directly generate an XPDL document from a business process model represented by the standard activity diagram. In the paper we will propose an approach to generate an XPDL document from a business process model represented by the extended UML activity diagram.

  • PDF

Development of a Web-based Schedule Tool Using Flash (플래시를 이용한 웹기반 일정관리 도구 개발)

  • Jang, Myung-Houn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.2
    • /
    • pp.51-57
    • /
    • 2010
  • Schedule management of construction work is important in order to complete construction projects within a given period of time. As activities increase and relations become more complex, schedule management software becomes increasingly necessary. To address this, attempts are being made to incorporate web-based ICT (information and communications technology) in construction project management. This research proposed a method to manage construction schedules via web pages using Flash. The interactive and graphic property of Flash enables a field manager to manage schedules easily and efficiently. A prototype was implemented using Flash and Action Script, and it was applied to a sample network in a web page.

Configuration Management based Configuration File Version Integrity Auditing Framework (형상관리 기반 설정파일 버전 무결성 감사 프레임워크)

  • Kim, Seonjoo;Lee, Sukhoon;Baik, Doo-Kwon
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2012.11a
    • /
    • pp.1511-1514
    • /
    • 2012
  • 최근 기업에서 구축하는 IT 아키텍쳐가 점점 복잡해져 가는 환경변화에 따라 각 시스템 구성요소의 조건이나 특성을 저장하는 설정파일(Configuration file)의 중요성이 강조되고 있지만, 대부분의 형상관리시스템이 응응 소프트웨어를 중심으로 구성되어 설정파일의 특징을 반영한 활동에 한계를 갖고 있다. 또한 품질보증 목적으로 수행하는 형상감사 활동도 응용 소프트웨어를 대상으로 품질중심 감사 활동이 이루어지면서, 등록된 개별 소프트웨어 별로 변경통제와 버전관리가 이루어져 설정 파일이 포함되는 경우 버전 무결성 차원의 문제를 적발하지 못하는 문제가 있다. 이 논문에서는 추가적으로 필요한 감사활동 요구기능을 정의하고, 동일한 원본에서 배포된 설정파일들이 서로 버전이 다르게 관리 될 수 있는 문제를 감사(Audit)를 통해 탐지할 수 있는 버전 무결성 감사 프레임워크를 제시한다. 제안하는 프레임워크는 기존 형상관리 개념과 액티비티, 프로세스를 기반으로 감사기능을 보완한다. 이를 통해 기존 감사활동에 버전 무결성 검증을 수행하는 형상감사 기능이 포함되며, 이는 설정파일의 버전 차이에 의해 사전/사후 발생될 장애, 오동작 등의 문제 해결에 활용된다. 이 논문에서 제안 프레임워크의 검증을 위하여 웹 시스템 기반 자바환경으로 구현하였고, 현장 적용한 부분을 평가 함으로써 검증하였다.

A Workflow Determinacy Decision Mechanism (워크플로우 결정성 판단 메커니즘)

  • Chung, Woo-Jin;Kim, Kwang-Hoon
    • Journal of Internet Computing and Services
    • /
    • v.10 no.3
    • /
    • pp.1-8
    • /
    • 2009
  • The primary tasks of a workflow management system specify workflow models with respect to resource, control-flow, data-flow, functional, and operational perspectives, and to enact their workcases (workflow instances). In terms of enacting workflow models, the essential criterion grading the quality of the system is "how much is the system able to guarantee the correctness of workflow models' enactment?". Particularly, the workflow determinacy problem, which may be caused by the interference of the control-flow and the data-flow specifications, is the most challenging issue in guaranteeing the correctness of the system. We are able to solve the problem by either of the following two approaches-analysis of workflow model and verification of workflow enactment. In the paper, we propose a technique that guarantee the system's correctness through verifying workflow enactment. In other words, the technique is able to detect the conflicts of control-flow and data-flow enactments existing on a workflow model, which causes the system to be non-determinant in enacting workflow models. Finally, by applying the technique to the e-Chautauque workflow management system developed by the authors' research group, we prove that the technique is a feasible solution for the workflow determinacy problem.

  • PDF

Development of Integrated Design Methodology for Relational Database Application -Focusing on Object-Oriented Analysis and Design Methodology- (관계형 데이터베이스 응용시스템을 위한 통합 설계방법론 개발 -객체지향 분석.설계 방법론을 중심으로-)

  • Joo, Kyung-Soo;Jho, Do-Hyung
    • Journal of the Korea Society of Computer and Information
    • /
    • v.16 no.11
    • /
    • pp.25-34
    • /
    • 2011
  • In this paper we present an integrated design methodology for relational database based on object-oriented analysis and design. The integrated design methodology is based on business profile and has six phases. In the first phase, business use cases are identified and described by macroactivity diagrams and then the macroactivity diagrams are transformed to detailed business activity diagrams by using objects, object flows and business worker's responsibilities. In the third phase, the detailed business activity diagrams are transformed to business class diagrams that describe the static structure of the entire business system based on detailed business activity diagrams. In the four phase, the business class diagrams are transformed to class diagrams that represent the initial conceptual model of the target relational database. In the five phase, we add additional transformations on the class diagrams with generalization and specialization of associations, roles, activities, additional classes and redundant associations. Eventually, the final class diagrams are transformed to relational database schema. The methodology presented in this paper by applying that proposal for organic connection between object-oriented analysis and design methodology and relational database design methodology. And it will be able to deal with integration management. By the integrated design methodology, we can make more easily software systems based on relational database. In the case study, proposal integrated design methodology applied for a visa issuing system.

The use of Local API(Anomaly Process Instances) Detection for Analyzing Container Terminal Event (로컬 API(Anomaly Process Instances) 탐지법을 이용한 컨테이너 터미널 이벤트 분석)

  • Jeon, Daeuk;Bae, Hyerim
    • The Journal of Society for e-Business Studies
    • /
    • v.20 no.4
    • /
    • pp.41-59
    • /
    • 2015
  • Information systems has been developed and used in various business area, therefore there are abundance of history data (log data) stored, and subsequently, it is required to analyze those log data. Previous studies have been focusing on the discovering of relationship between events and no identification of anomaly instances. Previously, anomaly instances are treated as noise and simply ignored. However, this kind of anomaly instances can occur repeatedly. Hence, a new methodology to detect the anomaly instances is needed. In this paper, we propose a methodology of LAPID (Local Anomaly Process Instance Detection) for discriminating an anomalous process instance from the log data. We specified a distance metric from the activity relation matrix of each instance, and use it to detect API (Anomaly Process Instance). For verifying the suggested methodology, we discovered characteristics of exceptional situations from log data. To demonstrate our proposed methodology, we performed our experiment on real data from a domestic port terminal.

Construction Lean Process Development and Application for Field Productivity Improvement (건설 현장 생산성 향상을 위한 Lean 프로세스 개발과 적용에 대한 연구)

  • Kim, Yong-pyo;Jeong, Yong-ho;Lee, Min-jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.88-97
    • /
    • 2020
  • Practical and efficient application of lean construction, which has been proposed as an alternative to the limitations of traditional construction management methods, was developed to facilitate application on site and improve productivity through the fusion of traditional construction management methods. The concepts of Lean Time and Lean Cycle Time, which are the principles of lean construction, were introduced to eliminate waste and smooth flow production and pursuit of perfection, and the goal of establishing and improving the criteria for measurement and improvement was established and the information collection template was configured and applied to ensure reliability of measurement and analysis. Based on this, the project feasibility, reliability, and continuous improvement process were applied to the Field case to verify its effectiveness.