Korea has enacted the Performance Evaluation law on the R&D Programs since 2006. This study categorizes program size, program history, sustainability, self-evaluation result as antecedents, and analyze the relationship between the antecedents and Meta-evaluation result, the change rate of appropriations. The result shows that program size, program history, self-evaluation result have significant effect to the Meta-evaluation result. And Meta-evaluation result has significant effect to the change rate of appropriations. This study has implication that the performance evaluation system shows significant effect to the appropriations.
Korean Journal of Construction Engineering and Management
/
v.8
no.2
/
pp.93-100
/
2007
Performance measurement and evaluation is a critical issue in public funded civil infrastructure projects in recent years. As a results, Korean government has introduced the related policies and regulations based on the foreign cases to evaluate public construction projects. However, construction circumstances are different from other countries and the results from adopted regulations are not satisfied. Therefore this research proposes the critical success factors(schedule, cost, productivity, change order, safety, quality) for public construction projects based on previous related research outputs to successfully implement construction performance evaluation. Then, this paper also proposes the weights for the critical success factors. The proposed weights are developed by AHP of construction experts. Furthermore, the paper shows the difference of the weights of the critical success factors by project participants (owner, constructor, engineering, and inspector). This efforts will enhance the ability to develop an effective performance evaluation process and system for public construction projects.
Currently, the Ministry of Strategy and Finance operates performance evaluation of the IT projects of the central government. Recently, with the advent of the Digital New Deal and the Digital Platform Government, the budget for IT projects has significantly increased, leading to a higher level of interest in their performance. In this study, performance-related characteristics were selected through previous research, and an empirical analysis was conducted to examine whether there are actual differences in the performance of IT projects given respective characteristics. As a result of the analysis, new projects and others performed by departments or offices had a statistically significant positive effect on each final evaluation score. In contrast, IT support as well as fund-based projects had a statistically significant negative effect on each final evaluation score. This study suggests that when evaluating the performance of IT projects in the future, it is important to consider the unique characteristics of each project, as these may contribute to respective differences in performance.
Korean Journal of Construction Engineering and Management
/
v.10
no.4
/
pp.3-13
/
2009
When promoting BTL(Build Transfer Lease; below BTL) project, negotiation is a stage of examining observation and reflection of RFP(Request for Proposal below RFP) in terms with facilities, operating and financing. It keeps an important position in whole process. However, there is no consistent guideline or model which helps evaluating the result of negotiation. It is difficult to apprise the quantitative outcome after executing negotiation. Thus, this study presented the Value Engineering -based process and model of estimating the outcome of negotiation for the purpose of estimating and verifying the result of negotiation objectively, Evaluating factors of negotiation were classified into 6 fields, 38 divisions and 135 items, focused on cultural facilities on BTL project. Weight of every factor was estimated, and quantitative checklist was established. This study presented the model which could measure the outcome of negotiation. This result would be a critical checklist before negotiation on BTL project, an index of feedback during negotiation, and also a standard of estimating the outcome after negotiation.
Korean Journal of Construction Engineering and Management
/
v.12
no.3
/
pp.140-149
/
2011
The government introduced private infrastructure projects in order to reduce its financial burden by introducing private sectors efficiency and creativity and by utilizing their funds. Through revision, the act on the private investment of the infrastructure, many changes were made in the private investment system. The evaluation task to assess the project proposer's capability and to select a promoter is regarded as the most important process for fairness and transparency of the project. In this study, the improvement of project plan evaluation task of current private infrastructure projects is proposed based on the standard guideline for evaluation procedure of private infrastructure projects provided by Korea Development Institute. In addition, software program for evaluation procedure is made to improve the efficiency and enableconvenient evaluation task.
Proceedings of the Korea Technology Innovation Society Conference
/
2017.11a
/
pp.127-127
/
2017
과학기술기본법 제12조 및 성과평가법 7조에 따라 국가연구개발 투자의 효율성 제고를 위해 장기간 대규모 예산이 투입되는 사업, 사업간 중복조정 또는 연계가 필요한 사업, 다수 중앙행정기관이 공동으로 추진하는 사업, 국가적 사회적 현안으로 대두된 사업 등에 대해 특정평가를 실시하고 있다. 사업군 특정평가는 "08년부터 "17년까지 총 17회 실시되었으나 사업군 단위의 평가보다 사업군 내 개별사업 중심으로 평가가 수행되어 왔다. 본 연구의 목적은 사업군 특정평가의 평가틀을 제시하는 것으로 기존의 사업 단위 특정평가 방법을 차용해왔던 방식을 사업군 단위 특정평가에 적합한 평가틀을 제안하고자 한다. 평가의 계층구조에서 사업평가와 정책평가 사이에 위치한 사업군 평가에 대한 틀 제시는 향후 과학기술분야의 정책평가 도입을 위한 탐색연구에 해당한다. 이러한 연구목적의 달성을 위해 먼저 기존에 수행되었던 사업군 특정평가의 사례들에 메타평가를 수행하여 현 사업군 평가틀의 한계를 조사하고, 국내외 정책평가 사례 분석을 통해 사업군 특정평가 틀에 활용 가능한 벤치마킹하고자 하였다. 이러한 기존 사업군 평가의 한계와 선행 정책 평가의 시사점을 바탕으로 사업군 특정평가틀을 제시하였다. 메타평가는 선행 문헌조사를 기초하여 본 연구에 적합한 메타평가틀을 구성하여 적용하였고, 국내외 정책평가 사례에 대한 선정과 분석은 정책평가 전문가들의 지문과 면접조사를 활용하였다.
Journal of the Korean Society for information Management
/
v.31
no.1
/
pp.119-141
/
2014
To enhance its efficiency to improve organizations' competitiveness, performance evaluation is vital and it influences budget, policies, and human resource affairs of the organizations. The study aims to develop performance indicators for National Library of Korea (NLK) and evaluate performance based on indicators driven. As a result, the study develops 2 viewpoints for each work area of NLK - management of information system, digital resources enlargement, and the cooperative utilization system for alternative materials. It also develops total 12 indicators. Based on the evaluation;the research finally suggests strategies for performance improvement by viewpoints for NLK.
첨단생신시스템개발사업과 같은 국가전략으로 추진되는 개발사업에 있어서는, 핵심제품 및 신기술의 연구와 함께 개발성과에 대해 객관적이고 기술적인 평가시스템이 마련되어져야 한다. 본 연구는 이러한 평가시스템을 개발하기 위한 것으로써, 먼저 첨단생산시스템개발사업의 목표달성도를 주요하게 고려하여 평가대상을 시스템, 단위기계, 요소기술, S/W로 분류하고, 개발성과에 대한 평가항목으로 기술성, 신뢰성, 안전성, 경제성을 선정, 내용면에서 평가의 객관성을 보증하고자 하였다. 또한 형식적인 면에서는, 평가의 객관성 및 전문성을 보증하기 위하여 평가형태를 개발수행기업에 의한 자체평과와 위원회에 의한 위원회평가로 나누었으며, 위원회평가를 위해서는 평가자를 기술적으로 지원 할 수 있도록 개발사업에 대한 평가지원 DB시스템을 개발도록 하였다.
Project risk assessment is the most important activity performed at the beginning of a project because it can judge the performance of the project in advance. In this study, We were evaluated risk with traditional risk factors such as technology and schedule, etc, and Indirect risks factors such as financial, strategic, and special risks. and then, we analyzed what kind of relationship these risk evaluation factors have on business performance and customer satisfaction. As a result of the research, it was found that the risk evaluation items had a relationship with performance and customer satisfaction. However, It is possible that the performance may differ depending on how risks are managed after risk assessment. Therefore, follow-up studies should be conducted, including information on risk management practices. This study is meaningful that presenting practical risk evaluation items and at the same time identifying the relationship with performance. We plan to further the study in future studies including the evaluation of risk management process.
KSCE Journal of Civil and Environmental Engineering Research
/
v.44
no.3
/
pp.375-383
/
2024
The size of the construction industry is increasing, and its impact on the entire national industry is also significant. However, construction cost increases, construction period delays, safety accidents, and quality problems occur during the construction process. This paper analyzed the construction cost, construction period, and change order performance for civil infrastructures for which post evaluation was performed. The analysis was conducted by dividing civil engineering facilities by type, construction nature, construction cost, contract nature, and delivery method. Planned and actual construction cost and period were compared during the planning, design, and construction process of civil engineering facilities. There is a possibility of input errors in project performance data, this paper proposes to the post-evaluation center should perform post-evaluation. Also, post-evaluation implementation guidelines for change orders should be revised. Additionally, further analysis of each facility was proposed through continuous data collection.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.