Public Infrastructure Practitioner's Recognition on Project Performance  

Park, Hee-Sung (한밭대학교 토목공학과)
Publication Information
Korean Journal of Construction Engineering and Management / v.8, no.2, 2007 , pp. 93-100 More about this Journal
Abstract
Performance measurement and evaluation is a critical issue in public funded civil infrastructure projects in recent years. As a results, Korean government has introduced the related policies and regulations based on the foreign cases to evaluate public construction projects. However, construction circumstances are different from other countries and the results from adopted regulations are not satisfied. Therefore this research proposes the critical success factors(schedule, cost, productivity, change order, safety, quality) for public construction projects based on previous related research outputs to successfully implement construction performance evaluation. Then, this paper also proposes the weights for the critical success factors. The proposed weights are developed by AHP of construction experts. Furthermore, the paper shows the difference of the weights of the critical success factors by project participants (owner, constructor, engineering, and inspector). This efforts will enhance the ability to develop an effective performance evaluation process and system for public construction projects.
Keywords
Public Construction Project; Performance Evaluation; Weight; AHP;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 고영선, 윤희숙, 이주호. (2004). 공공부문의 성과관리. 한국개발연구원
2 김우섭, 구교진, 현창택. (2003). '건축공사 사후평기를 위한 평가항목 선정에 관한 연구.' 대한건축학회 논문집, 19-12: 171-178
3 유일한, 김경래, 정영수, 진상윤. (2005). '건설산업의 성과지수 개발을 위한 핵심성과지표: 건설기업 대상 KPI를 중심으로.' 대한건축학회 논문집, 21-2: 139-150
4 전성진, 김예상. (2003) '턴키 프로젝트의 주요성공요인 분석에 관한 연구,' 대한건축학회 논문집, 19-6: 141-149
5 Chan, A P. C. (2000). 'Evaluation of enhanced design and build system-A case study of hospital project.' Const. Mgmt. and Econ., 18-8: 863-871
6 Gao, Z., Smith, G. R., and Minchin, R. E. (2002). 'Budget and schedule success for small capital-facility projects.' J. of Mgmt. in Eng., 18-4: 186-193
7 Naoum, S. G. (1994). 'Critical analysis of time and cost of management and traditional contracts.' J. of Const. Eng. and Mgmt., ASCE, 120-4: 687-705
8 Newcombe, R. (2000). 'The anatomy of two projects: a comparative analysis approach.' lnt'l Journal of Project Management, 18-3: 189-199
9 Parfitt, M. K., and Sanvido, V. E. (1993). 'Checklist of critical success factors for building projects.' J. of Mgmt. in Eng., 9-3:243-249
10 Tayler, C. J. (1992). 'Ethyl Benzene project: the client's perspective.' Int'l Journal of Project Management. 10-3: 175-178
11 김기현, 유일한, 신동우, 김경래. (2005). '건설기업에 적합한 성과측정시스템 대안의 평가.' 대한건축학회 논문집. 21-6: 97-104
12 류랑도. (2004). The performance 한언
13 Hatush, Z., and Skitmore, M. (1997). 'Criteria for contractor selection.' Const. Mgmt. and Econ., 15-1: 19-38
14 이두헌, 박희성, 이교선. (2006) '공공건설사업 기술정책 인식도 조사분석,' 한국건설관리학회 논문집, 7-3: 122-129   과학기술학회마을
15 Cox, R., Issa, R. A., and Ahrens, D. (2003). 'Management's perception of key performance indicators for construction.' J. of Const. Eng. and Mgmt., ASCE, 1292: 142-151
16 Chan, A. P. C., Scott, D., and Lam, E. W. M. (2002). 'Framework of success criteria for design/build projects.' J. of mgmt. in eng., 18-3: 120-128
17 Shenhar, A. J., Levy, 0., and Dvir, D. (1997). 'Mapping the dimensions of project success.' Project Management Journal, 28-2: 5-13
18 Saaty, T. L., (1980).The Analytic Hierarchy Process. New York, McGraw-Hill
19 Brown, A, and Adams, J. (2000). 'Measuring the effect of project management on construction outputs: a new approach.' Int'l Journal of Project Management, 18-5: 327-335
20 Atkinson, R. (1999). 'Project management: cost, time, and quality, two best guesses and a phenomenon, it's time to accept other success criteria.' International Journal of Project Management, 17-6: 337-342   DOI   ScienceOn
21 Bubshait, A. A., and Almohawis, S. A. (1994). 'Evaluating the general conditions of a construction contract.' Int'l Journal of Project Management. 123:133-135
22 Al-Meshekeh, H. S., and Langford, D. A. (1999). 'Conflict management and construction project effectiveness: a review of the literature and development of a theoretical framework.' Journal of Construction Procurement, 5-1: 58-75
23 이계식, 문형표. (1995) 선진국 정부개혁의 전략과 교훈, 한국개발연구원
24 Chan, A. P. C. (1996). Determinants of project success in the construction industry of Hong Kong. Ph. D thesis, Univ, of South Australia
25 Park, H. S., Thomas, S. T., and Tucker, R. L, (2005). 'Benchmarking of Construction Productivity.' J. of Const. Eng. and Mgmt, ASCE, 131-7: 772-77
26 손정욱, 윤준선, 백준홍. (2003). '건설공사 생산성 측정방법에 관한 연구: 작업수행방법 개선사례를 중심으로.' 대한건축학회논문집, 19권 10호: 101-108
27 Molenaar, K. R., and Songer, A D. (1998). 'Model for public sector design-build project selection.' J. of Const. Eng. and Mgmt., ASCE, 124-6: 467-479
28 Songer, A. D., and Molenaar, K. R. (1997). 'Project characteristics for successful public-sector design-build.' J. of Const. Eng. and Mgmt, ASCE, 123-1: 34-40
29 박희성, 김상범. (2004). '한국공공건설사업 성과분석, 대한토목학회논문집,' 24권 6D: 911-917
30 Park, H. S. (2002). Development of construction productivity metrics system. Ph.D dissertation, Univ. of Texas, Austin, Tex