• Title/Summary/Keyword: 사업기획단계

Search Result 225, Processing Time 0.033 seconds

A Study on Prediction of Earth Retaining Work Cost in the Project Planning Stage -Focusing on Apartment Construction Projects in Seoul- (사업기획단계에서 흙막이 공사비 예측에 관한 연구 -서울시내 아파트 건설사업을 중심으로-)

  • Lee, Jin-Kyu;Yang, Kyung-Jin;Park, Ki-Hyeon;Kim, Chan-kee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.1
    • /
    • pp.385-392
    • /
    • 2021
  • In general, earth retaining work in construction works enables the construction of structures, prevents the displacement of the surrounding ground to the maximum extent, and plays an important role in ensuring the safety of the surrounding structures and field workers. The earth retaining work and the construction method differ according to the various ground characteristics, surrounding topographical characteristics, repair environment, and design conditions. In particular, in the case of Seoul city, the environments and ground conditions differ according to the area. This study analyzed the earth retaining work cost mainly for the apartment construction project in Seoul and calculated the approximate earth retaining work cost at the project planning stage. A model was developed to predict the cost of earth retaining work that matches the characteristics of Seoul City and predict the construction cost for earth retaining work. This paper presents the predicted earth retaining work cost using a multiple regression model that applies 10 project outlines as independent variables. The error rate of the prediction result of the earth retaining work cost of the apartment construction project in Seoul using multiple regression models was 10.75%.

A Study on the Method for the Estimate of Construction Management in the Program Management (종합건설사업관리 사업관리비용산정을 위한 방법연구 - 기획단계에서 실시설계 입찰까지 -)

  • Baek, Myeongchang;Park, Junmo;Park, Gilbeom;Kim, Okkyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.3-12
    • /
    • 2014
  • With the scale of program management getting larger and complexity, More accurate and precise method for management cost estimate is demanded. However, most of project management cost estimates are based on similar cases and hence can not reflect distinct features of each project. Cost estimate precision is also not up to the standards, and also troublesome to policy-making and budget allocation. Therefore, project typical model for cost estimate of Comprehensive Project Management is developed, and makes it easier to manage level of effort and allocate cost by applying characteristic factor of each project. This study categorized the project package by phase; planning, detailed design, and bid procurement, to develop typical model. And by designating specific level of effort required for each field and rank, the study aims to improve the method for calculating the detailed and objective program cost. Outcome of this study will prevent conflicts between client and contractor, accurately calculate program management contract cost for the client, and become a reference for the contractor to receive rational and practical payments for their work.

Constitution of Work Process for Apartment Renovation Project in Design Phase (공동주택 리모델링 설계단계에서의 사업수행 프로세스 구축)

  • Kwon, Won;Chun, Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.167-175
    • /
    • 2007
  • A renovation project of apartment housing is generally divided into four stages: Project inquiry stage, planning and feasibility stage, design stage and construction stage. Currently, procedure and managerial technique for a remodeling project has not been systematically established so that many companies have difficulty in doing their business. In particular, the design stage in participant which a project managers, designers, residents and engineers is more complicate than the other stages in terms of roles and working procedure. The design documents can be found trial and error if it is not well managed. The insufficient design caused by lack of ability to efficiently utilize information obtained during the stage and inappropriate decision-making not only results in diverse problems in the construction stage but also makes people suspect satisfaction and reliability on the remodeling improvements. Therefore the design stage is very significant issue on the renovation project. As the consequence, the design stage of a remodeling project is so important that it should be carefully managed, and composite understanding of the process to be executed. To do this, we provide roles and responsibility of each participant in the design stage and analyze the process where information is utilized in design stage. The information is analyzed in terms of input, tool and output.

Critical Success Factors for the Definition Phase of a Construction Program - Focused on the Yongsan Park Development Program - (대형 국책사업의 프로그램 정의단계 핵심성공요인 도출 - 용산공원 조성사업을 중심으로 -)

  • Lee, Woo-Yeon;Lee, Seung-Hoon;Hyun, Chang-Taek;Lee, SangHoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.54-63
    • /
    • 2022
  • In order to derive the success factors of a Mega-scale national project, this study conducted a questionnaire survey on experts participating in the Yongsan National Park development program to obtain critical success factors in the program definition phase. AHP analysis was performed for each category through a survey of experts participating in the definition phase of the Yongsan park development program to derive relative importance. The categories were classified into program strategy, process, and people, and the importance between categories was people, strategy, and process in that order. In addition, as for the 27 critical success factors in the program definition phase, the program manager's competency and leadership, environmental and cultural property survey planning, program management plan preparation, operation and maintenance philosophy, and integrated program office showed high priorities. Therefore, in promoting the Yongsan Park development program, we propose a strategy for selecting and focusing on the critical success factors with high priorities in the program definition phase proposed in this study.

A Study on the status and improvement of construction management in Susung Culture & Art Center (수성문화예술회관의 건설사업관리 적용 현황과 향후 발전 방향에 관한 연구)

  • Park, Byung-Hak;Yoo, Byung-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.45-52
    • /
    • 2006
  • Recently The public project ordering in local autonumous entities is a tendency increasing of CM service because of the visible and affirmative effect in the CM which is advanced meanwhile. And, the CM services of project all phase excepts a planning business are performed. To develop CM must be prepared the system plans concerned with the CM application from planning phase, actuality maintenance of CM fee-estimation standard, understanding conversion of participation subjects, the specialization through certification of CM qualification, etc. But, unexpected actuality the problems occurs when the CM business is performing. The purpose of this study are to present the solution to the problems concerned with the design management, design phase VE, additional business by owner, schedule control and establish the plan to perform CM services efficiently in the public sector through analyzing the case of CM application in Susung Culture & Art Center.

  • PDF

Cost prediction model of Public Multi-housing Projects in Schematic Design Phase (공공아파트 계획설계단계에서의 공사비 예측모델)

  • Kwon, Ho-Suk;Moon, Hyun-Seok;Lee, Sung-Kyun;Hong, Tae-Hoon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.65-74
    • /
    • 2008
  • Public institutions recognize the importance of cost management from the planning stage but they do not have an organized construction cost estimation and management system. Thus, at the stage of planning a new public construction project and estimating the cost, those in charge of budgeting estimate construction cost based on existing data and experiences, compare construction cost estimated after the basic design stage and the execution design stage with budgets, and then decide whether to continue the project or change the design according to the budgets. Therefore, we would develop the cost prediction model through regression analysis that can predict construction cost in Schematic Design Phase of the Public Multi-Family housing. Accordingly, if public institutions have a construction cost prediction model and management system that can estimate the optimum construction cost, they can make and execute budgets in a more efficient way than they do at present.

Decision Support Model for Determining Public or Private Highway Investment Projects (고속도로 건설사업의 재정/민자 발주선택 의사결정 지원모델)

  • Yeo, Donghoon;Jeong, Wooyong;Han, Seung Heon;Lee, Young Cheon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.3D
    • /
    • pp.381-389
    • /
    • 2009
  • Korean government is investing 1.8 billion won on infrastructure and investment on PPP projects constitutes 16.3%. This phenomenon is to promote private investment as well as lessening government burdens of public budgeting. However, the only criterion to be considered is government financial status in selecting public or private highway investment projects. So systematic decision support model is required in choosing public or private highway investment projects. So, this paper suggests a systematic decision support model for deciding public or private highway investment at the early stage of project planning. Furthermore, this paper identifies key decision variables with respect to economic, politic, project management criterions based on the related literatures and feedbacks from experts. This paper analyzed 30 cases of government investment and PPP projects and got the survey result from highway specialists. As a result, this paper presents an interval with respect to economic criteria using mean and standard deviation and a logistic regression equation which can predict the possibility of PPP project. Through this study, decision maker of central or local government can decide public or PPP highway project more systematically and reasonably.

An Establishment of Technology Innovation System for Sports R&D (전주기 개념의 스포츠산업 기술혁신체계 구축 방안)

  • Rim, Myung-Hwan;Koh, Soon-Ju
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2015.05a
    • /
    • pp.193-194
    • /
    • 2015
  • 스포츠에 과학기술 적용이 확산되고 경기력 향상과 경쟁력 확보를 위한 기술개발사업이 추진되고 있으나, 우리나라의 스포츠산업 기술혁신체계는 단계별 연계성 부족, 전담기관 부재 등 취약한 실정이다. 본 연구는 사전 기술기획으로 스포츠산업 기술정책비전, 메가트렌드 및 기술수준격차 분석 등을 수행하는 기술기회탐색과정을 추가하고 기술기획, 선정평가, 수행관리, 결과평가, 활용관리에 이르는 전주기 개념의 기술혁신체계 구축 방안을 제시하고 있다.

  • PDF

The Solution Process of Successful Technology Commercialization - Focus on the Government Funded Enterprises - (성공적인 기술사업화를 위한 솔루션 프로세스 - 정부의 기술개발지원사업 참여기업을 대상으로 -)

  • Park, Jae-Sue;Park, Jung-Yong
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.17 no.7
    • /
    • pp.1522-1530
    • /
    • 2013
  • Technology commercialization or new product development (NPD) is the complete process of bringing a new product to market. This paper presents a framework for a technology firm to think about its commercialization strategy in an environment where the established firms have tight control over the government funded. Companies typically see new product development as the first stage in generating and commercializing new product within the overall strategic process of product life cycle management used to maintain or grow their market share. Market-oriented item will overcome the lack of capacity, and will ensure the success of SME.

Application of BIM-based PMIS Considering Construction Life-Cycle (건설 생애주기를 고려한 BIM 기반의 PMIS 활용)

  • Moon, Sung-Woo;Kwon, Ki-Nam;Kim, Sang-Do;Jung, Joon-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.654-657
    • /
    • 2008
  • Recently, construction projects have become bigger and complicated and the construction business scale has enlarged. Therefore a project cost size is increasing. The historical data can be easily saved by advanced technologies of IT industries. Utilizing those make us to be able to manage construction project more effectively. These days, PMIS (Project Management Information System) has supplied widely at construction companies for integrating cooperation system of Web environment. and it is being used. However the most PMIS is limited at construction phase. Actually it isn't applied to a construction project Life-Cycle(planning, design, construction and maintenance). To control manage a construction project Life-Cycle effectively, BPMS (BIM-based PMIS Modeling) should be considered. This paper suggests the ways for applying BPMS.

  • PDF