Browse > Article
http://dx.doi.org/10.6106/KJCEM.2014.15.5.003

A Study on the Method for the Estimate of Construction Management in the Program Management  

Baek, Myeongchang (Department of Architectural Engineering, Chungbuk National University)
Park, Junmo (Institute of Construction Technology, Chungbuk National University)
Park, Gilbeom (Department of Architectural Engineering, Chungbuk National University)
Kim, Okkyue (Department of Architectural Engineering, Chungbuk National University)
Publication Information
Korean Journal of Construction Engineering and Management / v.15, no.5, 2014 , pp. 3-12 More about this Journal
Abstract
With the scale of program management getting larger and complexity, More accurate and precise method for management cost estimate is demanded. However, most of project management cost estimates are based on similar cases and hence can not reflect distinct features of each project. Cost estimate precision is also not up to the standards, and also troublesome to policy-making and budget allocation. Therefore, project typical model for cost estimate of Comprehensive Project Management is developed, and makes it easier to manage level of effort and allocate cost by applying characteristic factor of each project. This study categorized the project package by phase; planning, detailed design, and bid procurement, to develop typical model. And by designating specific level of effort required for each field and rank, the study aims to improve the method for calculating the detailed and objective program cost. Outcome of this study will prevent conflicts between client and contractor, accurately calculate program management contract cost for the client, and become a reference for the contractor to receive rational and practical payments for their work.
Keywords
Program management; Cost Estimation; Typical Model; Characteristic Factor;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 Ahn, Sang-Hyun and Kim, Jin-Dae (2013). "A Study on the Calculation of Organization Scale in Construction Management", Korean Journal of Construction Engineering and Management KICEM, 14(4), pp. 65-72.   과학기술학회마을   DOI   ScienceOn
2 Lee, Taewon and Lee, Gang (2014). "A Study on Practical Ways to Improve Pricing Criteria for Technical Service Contracts", Korean Journal of Construction Engineering and Management KICEM, 15(2), pp. 33-42.   과학기술학회마을   DOI
3 Chung, J., and Yoon, T. (2006). "A Study on the Estimate of Construction Management Cost for Public Construction Project in the CM for Fee Contract", Journal of the Korea Institute of Building Construction, JKIBC, 6(3), pp. 115-122.   과학기술학회마을   DOI
4 Multifunctional Administrative City Program Management Method Research Report (2007). Multifunctional Administrative City Construction Agency, p. 144, 150.
5 Notification of MOLIT 2009-825. Business index of CM.
6 Notification of MOLIT 2012-567. Standard of Cost of CM.
7 USFK Base Relocation Program Management Cost Estimation Research Report (2005). Defence Installations Agency, p. 34, 38.