A Study on the Development of a BIM-based Spatial Planning Simulation System for Architectural Planning Stage Support (건축기획단계 지원을 위한 BIM 기반 공간계획 시뮬레이션 시스템 개발에 관한 연구)

  • Choi, Sun-Young;Choi, Ju-Won;Kim, Ju-Hyung;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.19-23
    • /
    • 2011
  • The planning stage of an architectural project has much more significant effects on the cost or outcome of the project than other stages of the project. In addition, the importance of architectural planning has been further increasing according to the recent trend of construction projects becoming larger in scale and more complex. In spite of this, the current situation is that the planning stage work is not being systematically managed. Accordingly, the purpose of this study was to develop a BIM-based simulation system for providing support during architectural planning stage such as spatial planning & review, cost review, project owner requirements management, etc. It is easy to review various alternatives using this system that allows not only the modeling of space object modeling but also the instantaneous review of spatial area & layout, cost, etc. based on object information. In addition, it can be used as a communication tool with the project owner as it provides the visualized information and quantitative data of the building model, and the information created through this system can be delivered to the following stage for usage. It is thought that using this system, the entire project work including the architectural planning stage can be supported and even contributing to the advancement of architectural process.

Cost Prediction Models in the Early Stage of the Roadway Planning and Designbased on Limited Available Information (가용정보를 활용한 기획 및 설계초기 단계의 도로 공사비 예측모델)

  • Kwak, Soo-Nam;Kim, Du-Yon;Kim, Byoung-Il;Choi, Seok-Jin;Han, Seung-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.87-100
    • /
    • 2009
  • The quality of early cost estimates is critical to the feasibility analysis and budget allocation decisions for public capital projects. Various researches have been attempted to develop cost prediction models in the early stage of a construction project. However, existing studies are limited on its applicability to actual projects because they focus primarily on a specific phase as well as utilize restricted information while the amount of information collectable differs from one another along with the project stages. This research aims to develop two-staged cost estimation model for the schematic planning and preliminary design process of a construction projects, considering the available information of each phase. In the schematic planning stage where outlined information of a project is only available, the Case-Based Reasoning model is used for easy and rapid elicitation of a project cost based on the extensive database of more than 90 actual highway construction projects. Then, the representing quantity-based model is proposed for the preliminary design stage where more information on the quantities and unit costs are collectable based on the alternative routes and cross-sections of a highway project. Real case studies are used to demonstrate and validate the benefits of the proposed approach. Through the two-stage cost estimation system, users are able to hold a timely prospect to presume the final cost within the budge such that feasibility study as well as budget allocation decisions are made on effectively and competitively.

A Study on the Financing Methods and Risk Management for Expansion of Overseas Investment Infrastructure Projects (해외투자개발형 인프라사업 확대를 위한 금융조달 및 위험관리 방안)

  • Jung, Chang-Go
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.2
    • /
    • pp.427-435
    • /
    • 2017
  • Korea's overseas construction awards reached US $750 bn for more than 50 years since it first entered the market in 1966. In particular, the company won US $540 bn over 10 years from 2007, achieving 72% of the total contracts. However, in recent two years, awarded amounts have decreased by 40% each year. The most significant decline is due to the impact of international oil prices, which have plummeted since end of 2014, as oil-producing nations, which are Korea's major target countries, are struggling to cancel or postpone infrastructure orders. In order to lessen the impact of raw material price fluctuations, the recent trend is that even countries with relatively loose government financing conditions are rapidly changing their ordering methods to investment development forms such as PPP. The Korean government and companies have been already preparing for this for several years, but they are still not doing so well. The main reason is the lack of understanding about the investment development type project, especially financing methods and the aggravated fear of exposing it to various risks due to the characteristics of the development project, which takes a long time to collect the investment. In this paper, I propose a more systematic solution to financial process and risk management, which is recognized as a obstructive factor for Korean companies, in line with the recent government-led establishment of overseas infrastructure development support organizations. I would like to serve as a investment guide.

Optimum Delivery Frequency for Reducing Construction Logistics Cost under a Carbon Taxation (탄소세 부과시 건설 물류비용 최소화를 위한 운송빈도 최적화)

  • Park, Moon-Seo;Chun, Myung-Hee;Lee, Hyun-Soo;Hwang, Sung-Joo;Jang, Myung-Houn
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.73-82
    • /
    • 2011
  • The term 'green' has become an important way of survival for the construction industry in 21th century in accordance with the emergence of the environmental crisis due to the climatic change. Especially the policy of carbon taxation, planed to be introduced from 2012, is expected to be a considerable burden to the construction industry which has abundant carbon emission during the resource transportation due to the complexity of resources and local distribution of the construction sites. In this regard, this study shows an optimizing strategy for delivery frequency, which downsizes the net distribution costs based on the assumption that, despite of its other advantagements, the frequent small lot mode of JIT delivery would take negative effects due to the increase of costs of transportation and carbon emission once the carbon taxation policy carried out. To simulate the efficiency of the management strategies, the System Dynamics modeling has been used. The results show that the frequent small lot transportation strategy is now always efficient method to these changes, and that the frequency of transportation should be re-determinated according to the extent of the imposition of carbon tax. This study provides the conceptual frame for an efficient management of transportation system of the construction industry, showing necessity of change of the resource transportation systems through analysing JIT deliver system in accordance with the global changes in environmental economy.

Development of Design Collaboration Management System for Multiple Participants in Design Projects (설계프로젝트 참여자간 협업지원을 위한 설계협업관리 시스템 개발)

  • Lee, Jee-Hee;Yi, June-Seong;Shin, Seung-Woo;Park, Kyung-Rog;Lim, Ji-Youn
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.23-32
    • /
    • 2010
  • Construction Projects have mutual collaborative structures among various participants for common objectives. Most of all the design project which is the initial phase in the project is crucial for determining project overall quality and requires intimate and continuous relations between project participants. Thus, this study suggests Design Collaboration Management System for successful performing projects through cooperation among participants in the initial stage of projects. First, expert interviews were performed to figure out present conditions of design collaboration management and problems. The factor analysis was applied to draw owner's collaboration factors and engineer's collaboration factors. Based on those factors, this study suggests design cooperation management process which gives a framework for systematic management method. Through the process the design collaboration management system was developed which helps owner/designers/engineer's co-work. The System suggested from this study realizes systematic information management tool and through that it is expected to improve design product;'s quality, and further contribute the advancement of project.

A Case Study of the Construction Management Applied to I-Project (I-프로젝트의 건설사업 관리(Construction Management) 적용사례)

  • Kim Jong-Hoon;Seo Bong-Whan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.102-112
    • /
    • 2001
  • It has been passed $5\~6$ years since Construction Management introduced in Korea, but a few government projects have been presented as CM instances. We performed CM service, on behalf of the foreign Client, in the Insa-dong construction, I-Project. Even though there were many limits in cost, time and other aspects, we have attained satisfaction of the Client and successful businesses of all the construction parties as adopting the advanced management methods. Many advanced construction methods have been applied for the purpose of time reduce, cost save and quality assurance as well as to the webbased project management has been imported to overcome the limits of time and place. They have actualized to increase the productivity of the project by managing the floor to floor cycle and quality systemically pursuant to ISO 9002, and by adopting Real-name construction and completion system (or individual activity. While carrying out this project, it is possible to establish mutual reliability and understanding enable to resolve the issues occurring in the early stage due to insufficient understanding of CM, lack of communications and team work, indistinct work scope through continuos training and conferences. Additionally, we became to share business targets among the parties and promoted the project in confidence. We wish that the success of I- project to be rated as a standard model of CM in Korea.

  • PDF

Evaluating Schedule Management Capability in Korean Construction Industry through Importance-Performance Analysis (IPA 방법을 활용한 국내 건설 산업 공정관리 역량 평가)

  • Lee, Jin Gang;Song, Bohyeon;Kim, Dain;Choi, Jaehyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.1
    • /
    • pp.145-156
    • /
    • 2024
  • In an era where construction projects are becoming increasingly large and complex, the Korean construction industry faces the challenge of implementing systematic and cohesive schedule management practices. This study initially delineates the concept of schedule management capabilities, systematically categorizing them into five distinct domains: law and regulations, requirements of project owners, capabilities of professionals and organizations, task capability, and the adoption of smart construction technologies for schedule management. Through a survey targeting industry professionals, this research assesses the perceived importance and the actual proficiency level in schedule management across these categories, employing an Importance Performance Analysis(IPA) to scrutinize these capabilities. The findings underscore the acknowledged significance of diverse aspects of schedule management, yet reveal discrepancies between the current proficiency levels and their perceived importance, pinpointing areas necessitating enhancement. Critical improvement needs identified encompass the planning of budgets for schedule management, development of regulations for assessing construction periods, deployment of specialized on-site staff for schedule management, and investment in advanced schedule management software solutions. Consequently, this study offers a nuanced analysis and strategic insights for enhancing schedule management practices, aiming to facilitate their effective implementation in the field.

Analysis of Causes of Increase in Construction Cost and Minimize Increase of Cost through Performance Evaluation of Public Construction Projects (공공건설사업의 성과평가를 통한 공사비 증가 원인 분석 및 증가 최소화 방안)

  • Moon, Hyunseok;Ryoo, Geunho;Hong, Hyunki
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.44 no.4
    • /
    • pp.567-575
    • /
    • 2024
  • The government and local governments are utilizing regulations, policies, and various project management techniques at each project stage to effectively and systematically manage public construction projects. However, the increase in construction costs continues to occur. In order to solve these problems, this study attempted to collect cases of existing public construction projects and analyze historical data. And it would like to derive the impact factor of increased construction costs. Based on the results, a plan was proposed to prevent the causes of increase and minimize in construction costs. The main reasons for the increase in costs were the occurrence of civil petition, differences between design documents and site conditions, and changes due to requests from the owner and changes in the business plan. And to solve these problems, this study proposed improvement for each cause from an institutional perspective, along with interview with experts and project owners. The results of this study are significant in improving the process of existing public construction process and presenting key inspection and review items for each major inspection stage in order to solve problem resulting from the analysis of the performance of public construction projects.

Comparison Analysis on the Informatization Level between Construction CALS and Other Sectors (건설CALS의 정보화수준과 타 부문의 비교분석)

  • Jung, In-Su;Kim, Nam-Gon;Kim, Jin-Uk;Lee, Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.26-37
    • /
    • 2009
  • Ministry of Land, Transportation and Marine Affairs(MLTM) has implemented Construction CALS project for improving productivity of construction industry and for making construction project management efficient by responding to informatization and knowledge base society in 21st century. CALS has beeb applied successfully to projects form MLTM, however, the outcomes of Construction CALS hasn't been recognized. In addition, there is no way to find how high the level of Construction CALS is when it is compared with other SOC informatization projects. This study found out the informatiziation level of Construction CALS by using the evaluation index proposed in the former study, and by comparing with other sectors. The evaluation on the level was implemented in the three parts such as informatization infrastructure(network, hardware, standardization, data, informatization, informatization security), informatization utilization(information usage, IT performance), and informatization support(informatization goal, organization of informatization, informatization investment, informatization education), and then, this evaluation was compared with "Assessment for level of industry information system", "Assessment for level of small and midium sized industry information system", and "IICI(Informatizaion Index for the Construction Industry)". With the result from the comparison, this study produced superior factors and inferior factors for each sector. These results are expected to be useful for prioritizing budget allocation by finding out the informatization level of Construction CALS.

Development of the Construction Post-evaluation System in Public Construction Projects (공공건설사업에서의 건설공사 사후평가시스템 구축에 관한 연구)

  • Ok, Hyun;Yang, Sung-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.12
    • /
    • pp.7364-7371
    • /
    • 2014
  • Construction post-evaluation (CPE) boosts the efficiency of public construction projects by assessing the performance results of public construction projects and using the results to pursue similar projects. This evaluation comprehensively analyzes and assesses the planning of construction work, the estimated and actual construction costs, the construction period, the demand for construction projects, and the effects of construction projects after the construction work to ensure efficiency. The data was used to prevent lax project execution and enhance the quality and efficiency of similar construction projects. On the other hand, CPE results information must be managed systematically to refer to and use CPE data in similar construction projects. Therefore, in this study, the CPE system was developed as a measure of the systematic and comprehensive management and use of the CPE results information of individual ordering agencies. Therefore, the groundwork was laid for the assurance of quality enhancement and efficient project execution in public construction projects. This system is expected to serve as a useful tool for comprehensively analyzing and assessing construction works.