1 |
Ministry of Land, Transport and Maritime Affairs, "Construction Post-evaluation Enforcement Guidelines", April, 2013.
|
2 |
Ministry of Land, Transport and Maritime Affairs, "Improvement scheme of Comprehensive Analysis.Reflux system of the Construction Post-evaluation", Korea Institute of Civil Engineering and Building Technology, September, 2013.
|
3 |
Ministry of Land, Transport and Maritime Affairs, "11 Operation and Technical Improvement of Construction CALS System(I)", Korea Institute of Civil Engineering and Building Technology, January, 2012.
|
4 |
Ministry of Land, Transport and Maritime Affairs, "12 Operation and Technical Improvement of Construction CALS System(II)", Korea Institute of Civil Engineering and Building Technology, December, 2012.
|
5 |
D. H. Lee, J. W. Park, "Improvement scheme of utilization of the results of the post-construction evaluation system", Korean journal of construction engineering and management, v.14 no.6, pp.78-89, November, 2013.
과학기술학회마을
DOI
|
6 |
Ministry of Land, Transport and Maritime Affairs, http://www.molit.go.kr
|
7 |
Construction Project Information Portal System, http://www.calspia.go.kr
|
8 |
Ministry of Land, Transport and Maritime Affairs, "10 Operation and Technical Improvement of Construction CALS System(II)", Korea Institute of Civil Engineering and Building Technology, November, 2011.
|