• Title/Summary/Keyword: 기획단계 업무

Search Result 86, Processing Time 0.03 seconds

Infrastructure of the Simulation System Based on Virtual Reality in Predesign Phase (기획단계에서의 VA기반 시뮬레이션 시스템 기반구축에 관한 기초연구)

  • Sim, Jin-Kyu;Lee, Yoon-Sun;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.787-790
    • /
    • 2007
  • Currently, the complication and large scale of the construction project have caused a lot of problems of cooperation and information sharing. Therefore, for solving this problems, the research based on techniques of the virtual construction system are actively advanced all over the world. This paper is one of the researches about the virtual construction system and infrastructure of the simulation system that is one of the virtual construction system. This paper should analyze the needs about the simulation system through analysing proceeding researches and a lot of solutions, such as AutoCAD and ArchiCAD. Also this paper should drive functions of simulation system, and suggest the concept of this system

  • PDF

Derivation of BIM/GIS Platform Application Scenarios and Definition of Specific Functions in Construction Planning and Design (건설 기획 및 설계 단계 BIM/GIS 통합 플랫폼 활용을 위한 시나리오 도출 및 상세기능 정의)

  • Youn, Junhee;Kang, Tae-Wook;Choi, Hyun-Sang;Kim, Changyoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.12
    • /
    • pp.7340-7349
    • /
    • 2014
  • BIM (Building Information Model) and GIS (Geographic Information System) are applied widely to all stages (Planning - Design - Building - Maintenance) of construction. Recently, research for designing an integrated BIM/GIS platform has been conducted to determine the synergy effects. This paper reports the derivation of BIM/GIS platform application scenarios and definition of specific functions in construction planning and design phases. First, BIM/GIS application scenarios and platform functions are derived for each phase based on an analysis of business affairs. Second, SW functions, which compose platform function, are defined. In the construction planning phase, location selection and route location business affairs were analyzed. Preliminary design and detailed design business affairs were analyzed in the construction design phase. The result of this research can be used for BIM/GIS integrated platform design in the future.

기획단계에서의 최적 개산견적산정의 방법론 고찰

  • Kim Chan-Joong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.120-125
    • /
    • 2003
  • The estimated construction costs derived at the Planning stage of a project are utilized as important data determining the feasibility of overall project. Therefore the clients usually expect to have estimations of the construction cost as precise as possible and there has been extensive studies carried out by the cost specialists worldwide to satisfy this client's specific need whereas the local estimators still heavily rely on producing quantities and detail quotations only. This paper is to introduce a case study where elemental/functional area cost analysis is incorporated into a database system for the improved accuracy in cost estimations.

  • PDF

Analysis of the Importance and Priority of HRM Factors in Private Security (민간경비 인사업무의 중요도 및 우선순위에 대한 고찰)

  • Kwon, Jung-Eon
    • Korean Security Journal
    • /
    • no.56
    • /
    • pp.55-81
    • /
    • 2018
  • The purpose of this study is to find significant activities in human resource management (HRM) to solve growing-pains caused by the rapid external growth in private security business. To this end, we applied the HRM factors suggested by the National Job Capability Standard (NCS) to the private security and investigated the relative importance using the Analytic Hierarchy Process (AHP). The results were as follows. First, the importance of 4 HRM criteria in the private security was ranked in order of recruitment, operation, benefit, and retirement. Particularly, the relative importance of recruitment reached 63.8%. Second, the composite importance was calculated by dividing the 4 HRM criteria into 14 capability sub-criteria and 46 capability alternatives. As a result, personnel planning and hiring at the recruitment turned out as the areas that needed the most improvement. In addition, the operating and planning of education involved in the highest rank, 8th and 10th respectively. Based on these results, we suggested critical HRM factors for developing the private security business as well as proposed research directions and methods for further studies.

Theoretical Approach on the Development Stage of Animation Production Pipeline (애니메이션 제작 공정에 관한 이론적 고찰 : Development (기획개발) 단계를 중심으로)

  • Kwon, Jae-Woong
    • Cartoon and Animation Studies
    • /
    • s.33
    • /
    • pp.173-202
    • /
    • 2013
  • This research focuses on the part of animation production pipeline. Among the four stages in the process (development, pre-production, main production, and post-production), this research explores theoretical features of the development stage. As the development stage is not well-known and theorized in Korea, this research provides roles and values of the development stage. The development stages is very important because two works have to be proceeded in this stage. First, the story idea for making animation should be decided. Ideas have to be developed into definite synopsis. And, the bible to pitch for investors are prepared on the basis of the story. Secondly, the basic production plan has to be initiated. This production plan includes the financial budget, the production schedule, and the production team. These three elements are so crucial that the producer (or executive producer) should take into consideration from the early stage of production.

BIM Application for Civil Engineering Project in Planning and Design Phases (토목공사 기획 및 설계단계의 BIM 적용방안 연구)

  • Kang, Leen-Seok;Kim, Seol-Gi;Kim, Hyeon-Seung;Moon, Hyoun-Seok
    • Journal of KIBIM
    • /
    • v.1 no.1
    • /
    • pp.26-31
    • /
    • 2011
  • Due to the characteristics of 3D objects of building construction projects which have regular, vertical and repetitive shapes, the most practical utilization of BIM in the country is focused on building projects. The characteristics of 3D objects of civil engineering project have irregular, horizontal and non-repetitive shapes. Therefore, consisting of a practical BIM model is difficult comparing with building project. This study suggests an application process of BIM for the planning and design phases for civil engineering project. A BIM system is developed based on suggested BIM process and it is verified through a bridge construction project.

Constitution of Work Process for the Remodeling Construction Project in Planning Phase (건축물 리모델링 기획단계에서의 사업수행 프로세스 구축)

  • Kwon, Won;Chun, Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.165-174
    • /
    • 2006
  • Recently, the architecture remodeling is rising as new alternative for activating the construction market as the interest toward life cycle of buildings has increased. But the reality is that current remodeling business is suffering various types of difficulties in its performance due to the absence of general management technology and factor technology in systematic performance procedure or evaluation, etc toward remodeling effect, evaluation on performance, imperfect system for reflecting user requirements and remodeling life cycle ; planning, $feasibility ^{\circ}\hat{E}designing^{\circ}\hat{E}construction^{\circ}\hat{E}management$ along with lack of overall understanding on remodeling. Accordingly, this research has attempted to search for an effective management method through overall understanding in project performance by presenting work procedure of remodeling project and analysis items for decision making, etc centered on early planning stage out of three stages called planning, designing and construction.

Analysis on the Relationship between Each of the Steps in the Complex Shopping Mall Development (복합쇼핑몰 개발과정에서 각 사업단계간의 관련성 분석)

  • Lee, Chan-Ho
    • Journal of Digital Convergence
    • /
    • v.13 no.8
    • /
    • pp.83-89
    • /
    • 2015
  • In the process of complex shopping mall development, all the steps (business planning step, pre-sale & completion step, management & operations step) head towards a consistent ultimate goal in an overall business perspective. In this study, we analyze using a structural equation model if an appropriate relations between each of the steps are formed to achieve the ultimate goal. In this study, we find a positive relationship between business planning step and pre-sale & completion step, and also find that for success pre-sale & completion, a faithful business plan is necessary. But we find no statistically significant relationship under significant level 0.05 among business planning step and management & operations step and the level of success, pre-sale & completion step and management & operations step and the level of success, management & operations step and the level of success. This suggests that each of the steps does not form a close relationship to achieve the consistent goal in the complex shopping mall development and each one is doing a short-sighted work for its own profit.

A Study on the status and improvement of construction management in Susung Culture & Art Center (수성문화예술회관의 건설사업관리 적용 현황과 향후 발전 방향에 관한 연구)

  • Park, Byung-Hak;Yoo, Byung-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.45-52
    • /
    • 2006
  • Recently The public project ordering in local autonumous entities is a tendency increasing of CM service because of the visible and affirmative effect in the CM which is advanced meanwhile. And, the CM services of project all phase excepts a planning business are performed. To develop CM must be prepared the system plans concerned with the CM application from planning phase, actuality maintenance of CM fee-estimation standard, understanding conversion of participation subjects, the specialization through certification of CM qualification, etc. But, unexpected actuality the problems occurs when the CM business is performing. The purpose of this study are to present the solution to the problems concerned with the design management, design phase VE, additional business by owner, schedule control and establish the plan to perform CM services efficiently in the public sector through analyzing the case of CM application in Susung Culture & Art Center.

  • PDF

An Analysis on the Propriety of Labor Input at Design Stage in Construction Management (건설사업 관리에 있어서 설계이전단계의 인력투입 적정성 분석)

  • An, Yang-Hoan;Kim, Young-Ai;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.32-41
    • /
    • 2009
  • In the execution of construction management, such pre-design steps as a planning stage, a basic design stage, and a work design stage are regarded as more important than an actual construction stage. However, the manpower input criterion from the aspect of construction management price standard in the Construction Engineering Management Law does not attach weight to the pre-design stage. In this regard, the aim of this study was to examine the propriety of manpower input in the pre-design stage of construction management and then present an improvement strategy of it. For this, the investigator examined the criterion of service price prescribed in the Construction Engineering Management Law and then comparatively analyzed four sites of construction management services. Study findings are as follows: 1) the actual state of manpower input based on the stepwise average price criterion of construction management service is presented with such steps as the newly established planning step (6.6%), the basic design stage (3.9%$\rightarrow$5.6%), the practical design stage(7.6%$\rightarrow$13.5%), the construction stage (88.5%$\rightarrow$64.0%), and the newly established maintenance stage (10.3%). The average price criterion is classified by total construction expenses and calculated by improved rates and stage; and 2) the three-step criterion of the Construction Engineering Management Law is classified into five stages including the planning stage and the maintenance stage by dividing it with the stepwise construction businesses. Study findings show that the calculation of price criterion in the actual site of construction management services must be operated in a practical and flexible manner and the systematic improvement of stepwise manpower input must be carried out actually.