• Title/Summary/Keyword: 공사유형

Search Result 407, Processing Time 0.021 seconds

Classification and Standardized Coding for Urban Railway Casuality Accident Types and Causes (도시철도 사상사고 유형·원인 분류 및 표준화 방안)

  • Mo, Chun Suk;Kim, Si Gon;Kwon, Young Jong;Kang, Kap Seang
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.5
    • /
    • pp.1173-1177
    • /
    • 2015
  • The paper suggests to reclassify the casuality accidents types and causes at urban rail stations in the standardized code manner. In order to make standardized codes, 4,086 casuality accidents for Seoul Metro and Seoul Metropolitan Rapid Transit Cooperation (SMRT) are analysed. The standardized code for casuality accident types includes 4 distinct factors; casuality object, casuality location and casuality pattern. Also, the standardized code for casuality accident causes includes 4 distinct factors: casuality trigger, drinking or not, first cause and second cause. This code is deemed to play a big role to link the same casuality accident types or causes which can be used in the process of railroad safety management and emergency response system.

A Study on the Structure Types and Concrete Strength Zoning of Domestic Tall Apartment Buildings (국내 초고층 주상복합 건축물의 구조시스템 유형과 콘크리트 강도 조닝 분석)

  • Kim, Sang-Yeon
    • Land and Housing Review
    • /
    • v.4 no.3
    • /
    • pp.295-301
    • /
    • 2013
  • In this study, cases of domestic tall residential buildings were investigated for the structural types, numbers of stories, total heights, type of lateral load resisting systems, and zoning of concrete strength. Based on these investigation data, the structural planning pattern of tall residential building was analyzed. SRC structure is main structural types of tall residential building at the initial stage of domestic tall residential building, but RC structure is substituted for main structural types since 2005. Retaining wall system is positioned at the core part of structural plan as a lateral load resisting system. Concrete strength zoning of vertical members like columns are divided by vertical heights of lower parts, middle parts, and upper parts. Basic data of structural planning of 40stories and 60 stories residential buildings was proposed based on case investigation.

Analysis of Potential Construction Risk Types in Formal Documents Using Text Mining (텍스트 마이닝을 통한 건설공사 공문 잠재적 리스크 유형 분석)

  • Eom, Sae Ho;Cha, Gichun;Park, Sun Kyu;Park, Seunghee;Park, Jongho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.1
    • /
    • pp.91-98
    • /
    • 2023
  • Since risks occurring in construction projects can have a significant impact on schedules and costs, there have been many studies on this topic. However, risk analysis is often limited to only certain construction situations,and experience-dependent decision-making is therefore mainly performed. Data-based analyses have only been partially applied to safety and contract documents. Therefore, in this study, cluster analysis and a Word2Vec algorithm were applied to formal documents that contain important elements for contractors or clients. An initial classification of document content into six types was performed through cluster analysis, and 157 occurrence types were subdivided through application of the Word2Vec algorithm. The derived terms were re-classified into five categories and reviewed as to whether the terms could develop into potential construction risk factors. Identifying potential construction risk factors will be helpful as basic data for process management in the construction industry.

Comparison of Residential Environment by Public Rental Housing Type: Focusing on Failing to Meet the Minimum Housing Standard (공공임대주택의 유형별 주거환경 비교 분석: 최저주거기준 미달을 중심으로)

  • DaEun Lee;JiYoung Oh
    • Land and Housing Review
    • /
    • v.15 no.1
    • /
    • pp.23-38
    • /
    • 2024
  • This study examined the residential environment of public rental housing by type at a microscale, using ANOVA and multinominal logistic models, based on the minimum and specific housing standards. The key findings are as follows. First, it was confirmed that each type of public rental housing, as well as resident characteristics, varied in meeting the minimum and specific housing standards. Second, Happy House turned out to have the worst residential environments, as a high proportion of this type did not meet the minimum housing standard and the remaining specific standards, excluding facility standards. Third, among permanent rental, national rental, and purchase/jeonse rental housing types, permanent rental housing was poor by the minimum housing standards, and area and room standards, while purchase and jeonse rental housing types showed a high proportion of failure to meet structural, performance, and environmental standards. Fourth, it was confirmed that purchase/jeonse rentals had higher rental anxiety than other types of public rental housing. In particular, anxiety about rent increases and the loss of deposits was high. These findings suggest that public efforts are called for to improve the residential environment through tailored support, depending on the type of public rental housing.

Damage Status of Turnout System with Wooden Sleeper of Concrete Track on Urban Transit (도시철도 콘크리트궤도 목침목 분기기의 손상현황)

  • Choi, Jung-Youl;Han, Kyung-Sung;Bong, Jae-Gun;Jang, Cheol-Ju;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.4
    • /
    • pp.379-385
    • /
    • 2019
  • The purpose of this study is to investigate the damage status of wood sleepers on concrete track of urban transit at different locations and to analyze the causes of damages. In addition, the turnout maintenance history during the service period of about 24 years was analyzed in conjunction with the train passing tonnage and that was to compare the current repair history. The most frequent damage components were rail, tie plate, spike and wooden sleeper. And, the damage caused by the defect of the rail fastening system such as spike and tie plate according to the deformation of the wooden sleeper was analyzed as the main type of damage. As a result, the damage of track components of turnout system was on the increase because they are directly affected by the train passing tonnage. The supplementary points of the check sheet for current turnout maintenance were derived and the improvement proposal was suggested based on the research results.

A Study on the Simplification of Quantity Calculation of Reinforcing Bar (철근 수량산출 간소화 방안)

  • Jo, Yeong-Ho;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.6
    • /
    • pp.521-527
    • /
    • 2019
  • Quantity takeoff and cost estimates in Korea are carried out in practice without any clear standards or standards. Especially, quantity takeoff of Reinforcing bar and BoQ documentation process is very complex using 2D drawings. In this study, 10 case sites were analyzed for the status of inefficient quantity takeoff and how the statement was prepared. In order to solve this problem, this study presented a method for calculating the quantity of rebars through the ratio of concrete volume for schools, offices, and apartment buildings, and analyzed the accuracy of results. In the future, it is expected that the error range can be reduced by defining the factors affecting the results and calculating the correction value for them.

A Study on the Defect Causes Type for Poly-Urethane Waterproofing in Roof (옥상 방수에 있어서 폴리우레탄 도막방수의 하자발생 유형에 관한 연구)

  • Shin, Hyung-John
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.128-134
    • /
    • 2005
  • Up to now, the various water proofing methods and materials have been developed. For the water proofing methods, poly-urethane membrane method is one of the commonly used and increase market share in water proofing industry due to it's many advantages. However, in spite of it's many advantages over other water proofing methods, water proofing defect occurs frequently. With this respect, the study investigate water proofing defect causes in roof water proofing. The study investigate 13 water proofing construction site in Sunchon city in oder to find urethane membrane defection causes and their type. As a results of the study, the followings are founded. 1) Among various water proofing defection causes, problems of water remain phenomenon due to surface horizontal level defect which occupy $25\;\%$ of total defect causes is the most commonly occur. 2) The second defect cause which occupy $15\;\%$ of total defect causes is the swell up phenomenon due to surface dry problem. For the prevention of water proofing defection in roof using urethane membrane, the followings are recommended. 1) Faultless surface treatment before using urethane membrane 2) Develop improved urethane membrane material 3) Improve urethane membrane construction technique

Analysis of Construction Dispute Cases Considering Reward Ratio Focused on Arbitration Cases of Korean Commercial Arbitration Board (보상비율을 고려한 건설사업 분쟁사례 분석 - 대한상사중재원 중재판정사례를 중심으로 -)

  • Ahn, SangHyun;Choi, Heeju;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.4
    • /
    • pp.48-56
    • /
    • 2017
  • Construction Projects have many participants by characteristic, scale and contract. Those also have complicated communication structure. So, claim and dispute occur continuously for conflicting communication. In many claim and dispute cases, it usually occurs between builder and owner. Unfair practices by owners position cause main claim and dispute. This study analyses judgment type, cause and compensation ratio in korean commercial arbitration case and provides the dispute information for builder that has weak position by contract. It draws analysis information for managing and controlling dispute that order type, judgement type, cause and failure case. Using these analysis information, it hopes to help inducement of dispute agreement and save time and economic damage for builder during construction. It also hopes to rise construction completeness by providing dispute management information.

Using Weighting-Factored Matrix Evaluation Method for Development of System Deducing Optimal Ecological Stream Flow Secured Methodology (가중치부여매트릭스 평가기법을 이용한 최적의 생태하천유량 확보 방안 도출 시스템 개발)

  • Byun, Dong-Hyun;Lee, Jong-Chul;Lee, Kyoung-Do;Jung, Seung-Kwon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.212-216
    • /
    • 2011
  • 현재 하천 건천화에 따른 수생태계 교란 및 수질악화 등의 근본적인 문제가 발생하고 있으며, 최근 정부의 저탄소 녹색성장기조에 따라 조성되고 있는 신도시, 소규모 및 대규모 택지개발사업의 경우는 환경 친화적인 단지조성 요구에 부응하기 위해 기존 도심하천의 복원 및 인공하천의 녹색성장을 고려한 친환경적 생태하천으로 조성하고자 하는 다양한 노력이 시도되고 있으나 안정적인 생태복원의 수원확보 방안을 마련하지 못해 실제 설계가 반영되지 못하고 있다. 또한, 조성하고자 하는 소하천 혹은 실개울 등의 수질보전 및 생태계 보호 등 하천이 본래의 기능을 유지할 수 있도록 생태하천유량을 확보하는 다양한 기술들이 개발되어 있지만, 공사 유형과 주변 환경에 적합한 생태하천유량 확보 방안을 선정할 수 있는 비구조적 대책마련이 부족한 실정이다. 이러한 실정과 문제점을 고려해 볼 때, 조성하고자 하는 도시 내 자연하천 및 인공하천 조성 등 수변환경을 고려한 단지조성에 맞는 생태하천유량 확보 방안 및 평가에 대한 연구가 단계적으로 이루어져야 할 것이다. 따라서 본 연구에서는 생태하천유량 확보와 하천수질 개선이 필요한 특정 지역 또는 다양한 유형의 공사 지구 내 하천이 정상적인 기능을 수행할 수 있도록 적용 가능한 생태하천유량 확보 방안들과 수리해석 모델인 HEC-RAS(River Analysis System), 생태하천유량 산정 모델인 PHABSIM(Physical HABitat SIMulation)을 연계한 물리서식처 평가 모듈을 개발하고, 이를 기초로 가중치부여매트릭스 평가(국토해양부, 2006) 기법을 적용한 최적의 생태하천유량 확보 방안과 수질개선 방안을 제시해 줄 수 있는 의사결정지원 시스템을 구축 하고자 한다. 본 연구에서 개발된 최적의 생태하천유량 확보 방안 도출을 위한 의사결정지원 시스템의 활용으로 필요유량은 물론, 기준을 만족하는 수질의 확보가 절실히 요구되는 중 소규모 하천에 실질적으로 적정수질의 생태하천유량을 확보함으로서 하천으로서의 역할을 위한 본 기능의 회복과 동시에 소하천, 도심하천 및 인공하천 등 중 소규모 수계의 수문순환을 정상화하여 하천의 지속 가능한 개발과 관리가 효율적으로 이루어지도록 하는데 이용될 수 있을 것으로 예상되어진다.

  • PDF

Development of Construction Cost Estimation Model for Elementary, Middle and High School Facilities (초·중·고등학교 시설물별 추정공사비 산정모델 개발)

  • Jung, Eui-Hyun;Yeom, Dong-Jun;Kim, Jun-Sang;Kim, Young Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.3
    • /
    • pp.69-78
    • /
    • 2021
  • Estimated construction cost is an important index to secure an optimal budget which needs to go into construction projects in the previous of basic design phase. In order for public institutions to calculate the estimated construction cost, the cost per unit area of public buildings is used. However, the current calculation method of the estimated construction cost in public buildings is impossible to reflect the characteristics of many facilities and combinations. The purpose of this study is to develop an estimation model in the previous of basic design phase for the elementary, middle and high school facilities. it is expected that it is possible to estimate the construction cost of the elementary, middle and high schools in a reasonable and reliable manner through the estimation model developed in this study.