1 |
Doo, S. H. (2003). "Korea Institute of Construction Engineering and Management" Construction Economy Reserch Institute of Korea.
|
2 |
Fair Trade Commission, Statistical Yearbook.
|
3 |
Kim, D. S., Cho, Y. J., Hyun, C. T., and Hong, T. H. (2008). "A study on the structure of indirect field negotiation system for effective dispute resolution at contract administration stage" Architectural Institute of Korea, 24(9), pp. 131-138.
|
4 |
Kim, I. H., Hong, Y. T., Ryu, H. G., and Lee, H. S. (2004). "A study on identification of the reasons od construction claim failure and proposal of improved methods of claims in the construction company's perspective" Architectural Institute of Korea Academic Conferences, 24(2), pp. 623-626.
|
5 |
Kim, J. H., Im, H. K., and Choi, J. H. (2016). "Forecasting the effects of the claims in the korean construction industry" Korean Journal of Construction Engineering and Management, KICEM, 17(5), pp. 35-44.
DOI
|
6 |
Korean Commercial Arbitration Board, Claims Statistics. Ministry of Land, Infrastructure and Transport, Press Releases.
|
7 |
Park, S. Y., Tang, J. K., Kim, B. O., and Lee, S. B. (2009). "Identifying and analyzing pre-dispute factors for construction projects" Korean Journal of Construction Engineering and Management, KICEM, 10(6), pp. 48-57.
|
8 |
Shin, C. J., Kim, Y. K., Cho, K. M., Hyun, C. T., and Hong, T. H. (2011). "Development of checklist to prevent claim through dispute case analysis of public construction projects" Korean Journal of Construction Engineering and Management, KICEM, 12(1), pp. 13-22.
DOI
|
9 |
Yoon, S. M., Hyun, C. T., Han, S. W., and Cha, Y. W. (2015). "Identification of claim elenments for design build projects using FMEA method" Journal of KBIM, 5(2), pp. 26-33.
DOI
|
10 |
Cho, Y. J., and Lee, S. B. (2005). "A study on mitigation of construction dispute in public projects" Architectural Institute of Korea, 21(8), pp. 129-136.
|