1 |
An JW, Yun SH. Improvement of BoQ documents for the BIM based quantity takeoff. Journal of KIBIM. 2017 Jun;7(2):16-24. https://doi.org/10.13161/kibim.2017.7.2.016
DOI
|
2 |
Olsen D, Taylor M. Quantity take-off using buliding information modeling (BIM), and its limiting factors. Procedia Engineering. 2017 Jun;196:1098-105. https://doi.org/10.1016/j.proeng.2017.08.067
DOI
|
3 |
Tak SW, Lee JS, Chun JY. The framework cost estimating method in schematic design stage. Proceeding of architectural institute of Korea; 2007 Oct 26-27; Korea. Seoul (Korea): The Architectural Institute of Korea Structure & Construction; 2007. p. 741-4.
|
4 |
Ahn YS, Song KR, Heo JM. Improving the accuracy of screening of cost estimating in early construction project phase. Journal of the Architectural Institute of Korea Structure & Construction. 2003 Nov;19(11):133-40.
|
5 |
Cho HH, Park UY, Kang TK, Park HY, Yun SH, Hur YK. Analysis of re-bar manufacturing system in plant and its facilitate method. Korean Journal of Construction Engineering and Management. 2007 Feb;8(1):57-65.
|
6 |
Son BS, Park MS, Lee HS, Lim DH. Analyzing the schematic cost estimating model based on quantity variation in building projects using the case study. Journal of the Architectural Institute of Korea Structure & Construction. 2008 Jun;24(6):109-18.
|
7 |
Kim SM, Cho JH, Lee JS, Chun JY. Cost estimating model of structural elements using approximate quantity survey in preliminary building design phase. Journal of the Architectural Institute of Korea Structure & Construction. 2009 Jun;25(12):155-64.
|
8 |
Kwon OC, JO CW, Cho JW. Introduction of BIM quality standard for quantity take-off. Journal of the Korea Institute of Building Construction. 2011 Apr;11(2):171-80. https://doi.org/10.5345/JKIC.2011.04.2.171
DOI
|
9 |
Cho YK, Choi YJ. A study on standardization of rebar through analysis of loss rate. Journal of Standards and Standardization. 2011 Dec;1(2):82-94.
|