Cost index for residential buildings (공동주택 건설공사비지수)

  • Lee, Dong-Hyun;Koh, Young-Beom;Ruy, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.289-294
    • /
    • 2006
  • Residential buildings industry hold lots of portions in Korean construction. Accurate cost index for Residential buildings is required to understand trends of prices of the constructions and to manage budget for them effectively. So Korea Institute of Construction Technology has issued a cost index for residential buildings every six months. However It hasn't been improved although It can't reflect the actual circumstance. So we are supposed to make a new cost index for residential buildings based on statistical data extracted from bills of quantity at three different projects.

  • PDF

A Study on the Estimation of Elemental Costs for an Apartment Building (공동주택에 대한 부위별 공사비 산정에 관한 연구 - 사례 H사의 실행단가를 중심으로 한 연구 -)

  • Kang, Hyun-Wook;Yoo, Jong-Hwan;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.173-181
    • /
    • 2007
  • The purpose of this study is to estimate elemental costs of an apartment building. The adapted research method includes a case study from $^{\circ}{\AE}H^{\circ}{\phi}$ construction company. The results of this study are as follows: 1) An elemental cost format of an apartment building is proposed, 2) An elemental cost table based on a case study of $^{\circ}{\AE}H^{\circ}{\phi}$ construction company is suggested.

A Study on Normal Project Period for Parking Lot of Aged Apartment Housing (노후 공동주택 주차장 리모델링 공사 표준공기 설정에 관한 연구)

  • Bang, Seongbae;Jang, JunYoung;Koo, Choongwan;Kim, Taewan;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.107-119
    • /
    • 2021
  • Recently, interest in remodeling apartment houses has been increasing due to problems such as a lack of parking spaces for old apartment houses. However, no method was suggested to predict the construction period of the apartment remodeling project. Unlike general apartment new construction, apartment remodeling construction involves demolition or reinforcement work, so a realistic remodeling construction period calculation plan differentiated from the existing construction period should be proposed. Therefore, this study intends to present a model for deriving the construction period of the underground parking lot of the apartment remodeling construction. Each construction period was calculated based on 19 activities of underground parking lot remodeling work through review of previous studies and expert advice. Activity's workload data and productivity data were derived to calculate the construction period, and the number of inputs and equipment inputs by Activity were determined to correct the productivity data. The construction period of Activity was calculated using the derived data, and the criteria for calculating the overlapping period for each Activity were presented to enable realistic construction period and scheduled schedule. As a result of predicting the accuracy of the construction period through the verification of the case complex, it is expected that it will be possible to predict the approximate construction period of the underground parking lot of the apartment remodeling construction in the future.

A Scheduling Method Of Dismantling Work Considering Specific Condition Of Remodeling Project - Focused on Old Aged Apartment House with Wall-Slab Structure - (리모델링의 특성을 반영한 철거공사의 공정계획 수립방안 - 벽식구조 노후 공동주택을 대상으로 -)

  • Kang, Sa-Yil;Hwang, Young-Kyu;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.104-115
    • /
    • 2008
  • Currently, reconstruction and remodeling are conducted to improve the performance of aged housing. Recently reconstruction has caused many problems such as wastes generation, wasting resources and real estate speculation, remodeling is drawing attention. Accordingly, remodeling business for aged housings gradually increasing, but the use of scheduling method not considering characteristics of remodeling deters construction in some construction types. Especially, in case of dismantling construction, the dismantling is delayed since the scheduling method not considering characteristics of remodeling is used. In case of remodeling, dismantling construction is ahead of other processes, if the dismantling construction is delayed, whole construction will be delayed and if speedy construction is conducted, the costs for remodeling will increase. Furthermore, existing remodeling for aged housing has been for rahmen(crossbeam and pillar) structure apartments, but since most apartments to be remodeled are wall-slab structure where dismantling takes a lot of weight, it is highly possible the dismantling construction is delayed. Thus, this paper is to establish scheduling method for the dismantling construction reflecting characteristic of remodeling to prevent delay of dismantling construction for remodeling of aged housing with wall-slab structure.

A Study on the Analysis of Delay Claim Risk in Apartment Housing Projects (공동주택공사에서의 공기지연 리스크분석에 관한 연구)

  • Kim Jae-Wook;Woo Kwang-Min;Lee Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.217-221
    • /
    • 2003
  • This study proposes a new classification system and analysis methodology for time delay risk of apartment projects. And this study proposes the classification of major trades and risk level and risk index by performing expert-oriented interview and survey report on a national scale. The purpose of this study is to present basic data for time delay risk management system through the analysis of risk level, risk index and rank of major 5 trades(earth work, structure work, masonry work, window and door/glass work, and interior finish work) in apartment projects.

  • PDF

A Conceptual Model for Automated Cost Estimating Using Work Information Classification System of Apartment House (공동주택의 공사정보분류체계를 활용한 적산 자동화 개념 모형 개발)

  • Lee, Yang Kyu;Park, Hong Tae
    • Journal of the Society of Disaster Information
    • /
    • v.10 no.1
    • /
    • pp.15-24
    • /
    • 2014
  • The study presents work information classification system of apartment house which can organize all construction management services throughout the planning and management of a construction such as the decomposition of the design process, the assembly of construction process and cost estimating, etc. In addition, the study suggested a way to connect work information classification system based on a relational database in working order and built a conceptual model for automated cost estimating by utilizing established data base. A conceptual model for automated cost estimating will resolve the fundamental problems of the existing cost estimating system and will be able to take advantage of scientific cost estimating system at the construction site of apartment house.

Suggestion of Optimum PHC Pile for 15~40 Story Shear Wall Type Apartment Building (벽식공동주택의 층수변화에 따른 최적 PHC말뚝 제안)

  • Lee, Bum-Sik;Park, Jong-Bae;Park, Yong-Boo;Kim, Sang-Yeon;Ha, Young-Bae;Choi, Geong-Ryun
    • Land and Housing Review
    • /
    • v.3 no.2
    • /
    • pp.177-185
    • /
    • 2012
  • LH applies a uniformly standardized PHC Pile to 15~25 stories of Shear-wall type Apartment Building. Recently it is predicted that LH will construct over 30~40 story Apartment Building to keep varied project condition and faces urgent needs to save construction cost for improving its competitiveness. Therefore, structural analysis and design on the upper part and foundation of apartment building were carried out in this study by subdividing story of apartment building, e.g. 15, 20, 25, 30, 35, 40 stories. Reflecting the result of basement analysis and design, the economic evaluations are performed and the optimum diameters of PHC piles are suggested. The result of this paper is considered to be applied usefully for foundation design of LH apartment housing, and the suggested PHC Piles can be used effectively by increasing efficiency and saving the construction cost of foundation.

주택건설촉진법시행령 개정(안)에 대하여

  • Korea Institute of Registered Architects
    • Korean Architects
    • /
    • no.5 s.301
    • /
    • pp.16-25
    • /
    • 1994
  • 건설부에서 지난 1월 7일 주택건설촉진법을 개정, 공포함에 따라 이의 시행에 필요한 주택건설촉진법시행령개정(안)이 지난 3월 26일 입법예고 됐다. 이 안은 300가구 이상 공동주택 공사감리를 건설기술관리법에 의한 감리전문회사가 담당하고, 300가구 미만 공동주택 공사감리는 건축사법에 의한 감리자(건축사)가 해야 한다는 내용으로 최근 건축사협회는 이에 대한 의견을 관계당국에 제출하는 등 강력한 입장표명을 하고 있다. 이와 관련, 본지에서는 주택건설촉진법시행령(안)의 주요내용과 그에 따른 건축사협회 입장을 알아보고 아울러 건축관계전문가의 의견을 들어본다.

  • PDF

A Study on Analysis of Defect Types and Measures for Reduction of Tile Construction for Apartment Houses (공동주택 타일공사의 하자 유형 분석 및 저감 대책에 관한 연구)

  • Park, Hyun Jung;Eom, Yong Been;Jeong, U Jin;Kim, Dae Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.6
    • /
    • pp.701-712
    • /
    • 2021
  • As the domestic housing supply problem has been resolved, the apartment construction market has shifted to a consumer-oriented market that wants high quality, and in particular, expectations in the area of finishing quality have increased. Looking at the status of complaints regarding apartment housing defects supplied by Korea Land and Housing Corporation, tile-related complaints are the type occurring the most frequently. While the Ministry of Land, Infrastructure and Transport(MOLIT) is making an ongoing effort to reduce complaints related to defects, through approaches such as drafting amendments to 「Investigation of defects in apartment houses, calculation of repair costs, and standards for determining defects」, the provision of preventive measures has been insufficient. In addition, by reviewing studies, there has been insufficient research to construct a classification system after deriving the characteristics of each type using the qualitative knowledge of experts, various quantitative indicators, and suggesting measures for reduction according to the causes of each type. Therefore, this study will reflect qualitative indicators to use the AHP analysis that makes it easy to identify the relationship between defects by surveying construction experts. Then, by visualizing the weight of 'Possibility of recurrence after repair,' 'Degree of difficulty in repairing defects' and 'Fault frequency' using a radial graph, we will analyze the characteristics of each type of tile construction defect and establish measures for reduction according to the cause. This will improve the quality of the living environment and contribute to the establishment of a system for smooth defect management and reduction of defects in apartment tile construction.

A Study on the Progress Measurement Method using Percent Complete of Work and Labor Productivity - Focusing on Structural Works of Apartment Construction - (단위작업 물량 달성율과 투입 노무량을 이용한 진도율 산정방법에 관한 연구 - 공동주택공사의 골조공사를 중심으로 -)

  • Choi Hyun-Ha;Lee Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.212-219
    • /
    • 2005
  • Time management is important in construction management Especially, in the high-rise apartment housing projects, it is very important to expedite the construction progress in order to meet the planned schedule. The objective of this paper is to propose the baseline for the progress rate using work volume and man $\cdot$ hours performed at work activity level. The work volume far each activity is transformed to the weighted value compared to total work volume for the floor Therefore, a progress rate for an activity is calculated by multiplying a weighted value and work volume. A progress rate for a floor and a building can calculated in this manner, respectively.