An Administration Model for Causation of the Schedule Delays in Construction Projects (건설공사 공기연장사유 관리모델)

  • Kim, Jong-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.125-133
    • /
    • 2007
  • If project time extension were required in the construction projects, either liquidated damages or extension costs should be applied according to causation of the schedule delays. However, in actual cases it is not applied so far according to the contract conditions. The reason why this situation happened Is that function of the present planning and scheduling is not working feasibly. The CPM schedule could not provide a proper solution for apportioning responsibility for the schedule delays. This situation could be considered as breach of contract and will cause potential disputes for schedule delay. Therefore, in this research process based contract administration model for construction delay claim is proposed to prevent schedule delay and solve the claims. The model is based on pro-active management for causation of delay to provide apportionment of responsibility and written evidences.

Study on introduction of 'Pre-Agreement system for Additional Incidental Cost' related to construction time extension (공사기간 연장에 따른 추가간접비 사전합의 제도 도입 방안 연구)

  • Jeong, Ki-Chang;Lee, Jae-Seob;Park, Yang-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.33-44
    • /
    • 2012
  • This study is as to payment improvement method of additional incidental cost to be occurred upon extension of public construction time. According to the result of analysis about the cause of non-payment of additional incidental cost of construction time extension through site examples, it was found that difficulties exist in disputes & proofing over the scope of actual cost recognition, and in this regard the result of experts opinion indicated that a construction extension pre-agreement system can be executed which agrees the scope of recognition of additional incidental cost of construction time extension once the statistical standard is clear and accurate. Accordingly, in this study, by totalling multiple sites data, calculations were implemented in terms of type of construction projects, amount of constructions, period of constructions. According to the result of calculation, the element of type of construction project and construction period appears to have none direct effect to the occurrence of additional cost of construction time extension, but direct relationship was indicated related to the contract amount element. In view of above, in this study a standard additional incidental cost of construction time extension was proposed, and presented a system improvement plan to implement the construction extension pre-agreement system.

The Calculation Method for Prolongation cost of Sub-Constract in Domestic Public Construction Project (국내 공공 공사 하도급계약 공기연장 추가간접비 산정방안)

  • Jeong, Kichang;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.61-69
    • /
    • 2018
  • Research on additional indirect cost due to construction period extension in general contracts has continuously been active whereas the same for the subcontract operations has not been. In this research, we review previous research on evaluation methods for additional indirect costs which are widely being used on construction sites as well as previously proposed methods altogether, applying them to analyze model-cases for comparison. We acknowledge that this pattern for construction cost fluctuation over the construction period demonstrates an S-curve. This S-curve shaped indirect cost occurrence is then used to generate model-cases that are used throughout the research which models we applied previous evaluation methods on. Finally in pursuit of finding out some problems of evaluation methods, we came to derive a conclusion that the "Average Actual Cost Evaluation Method on Extended Duration," which, in turn, were proved to be valid for application on general contracts, was also valid for general application on subcontractor operations.

A Case Study on the Calculation of Delay Damages for Contractors according to the Extension of Contract Period (계약기간 연장에 따른 시공자의 손실비용 산정에 관한 사례 연구.)

  • Lee Gi-Han;Kim Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.305-310
    • /
    • 2001
  • The purpose of this study is to calculate delay damages for contractors. The study has been performed by investigation of delay cost occurrence status and the analysis of subway construction cases. The results of this study are as follows: 1. Delay cost( 1day) equivalent to $0.005\%$ of total construction cost by analysis case studies. 2. Including bank interest, dealy cost is analysed as the following; $1.1\~9.2\%$ of total construction cost in part extension period, $3.3\~11.0\%$ of total construction cost in total extension period. 3. In comparison between liquidated damages and delay cost, liquidated damages account for average 20.1 times of delay costs. 4. Acceleration cost will be calculate on the basis of delay cost calculation method. In the result of this method, acceleration cost is equal to delay cost at least or must be large than delay cost

  • PDF

Analysis of Delay Causation by Characteristics of Construction Projects (건설사업 특성에 따른 공기연장사유 분석)

  • Kim, Jong-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.78-86
    • /
    • 2007
  • Top priority to manage construction projects is given to the planning and scheduling in order to keep the project duration, which is one of the most important factors in construction management. However, recently most of public construction projects especially for civil projects are delays and preventive research, many efforts were made concerning construction delays and preventive management methods. But analysis of delay causation, which is a main key to solve the problems is not done, yet. Therefore, in this research causation delays are analyzed by characteristics of construction projects, which are type of projects, type of contracts, project participants, and general condition. As a result of the analysis, delay causation are proved to be different by characteristics of the projects. The research results will be used for prevention of time extension and dispute resolution.

Improvement of the Calculation Standard for Prolongation cost of Domestic Public Construction Project (국내 공공 공사 공기연장 간접비 산정 기준 개선방안 - 국가계약법 및 지방계약법 산정기준의 비교 고찰 -)

  • Jeong, Kichang;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.95-102
    • /
    • 2016
  • Recently, a research regarding calculation of construction time extension-oriented incidental costs has been intensively suggested in quantitative aspect and recent studies on system improvement has been made continuously. In the case of Domestic Public Construction Works, State Contract Act is applied when the client is government whereas Local Government Contract Act is done when the client is local government, but more meticulous study is required because improvement plan is not proposed even there is a clear demand for improvement of these problems on calculation standard. Thus this study suggested appropriate standard by comparing each the calculation standards followed by 'State Contract Act' and 'Local Government Contract Act', considering the problems accorded, and analyzing field cases. Calculation method of other expenses was differently regulated as the revision of each regulation, and this demonstrates that there is a difference of actual cost from 12.37% to 24.95%. It is shown that less cost of construction time were calculated than actual cost according to a problem of calculation method by State Contract Act as the rate at the time of contract to be applied in other expense rate. This study suggested the rate against incidental cost and the rate of other expense per day against total construction cost as an appropriate rate calculation for other expense based on field database.

A Basic Study on the Improvement for Liquidated Damages at Construction Delay (지체상금 개선방안에 관한 기초연구)

  • Kook, Dong-Hoon;Son, Ki-Young;Kim, Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.458-461
    • /
    • 2006
  • With the opening in construction market, more diversified and internationalized construction culture is imported, but the level of our construction culture and policy is still not met the international standards. For example, there is a difference in the liquidated damages at delay due to the reason of builder imputation during the public construction project comparing the international standards like damages. It may lead to the potential claim. In this study, via comparing and analysis on the relevant international standards and extension expense for terms of work, actual compensation is selected, and improvement of liquidated damages like damages is presented.

  • PDF

Analysis of unfair provisions in Construction contract (건설공사 계약서상 불공정특약의 문제점 분석에 관한 연구)

  • Park Keun-Hyung;Kim Jeong-Jae;Choi Jea-Won;Kim Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.340-343
    • /
    • 2004
  • The purposes of this study is to survey unfair aspect of specific provisions in the construction contract. The research method of this stud)'includes judicial precedents and a questionnaier survey. The result of thus study are as follows: 1) unfair payment condition gives increase to faulty construction. 2) shift of the responsibility gives increase to delay, 3) adjusted contract sum gives increase inappropriate compensation to contractor.

  • PDF

Improvement of the Calculation Standard for Prolongation cost of Long-term Continuing Contracts Construction Project (장기계속계약공사의 공기연장 추가간접비 산정 개선방안)

  • Jeong, Kichang;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.30-37
    • /
    • 2017
  • In Korea, additional indirect costs generated from the time period extension of public construction projects have been studied. Practical claims against such costs are increasing. There are no clear criteria for calculating the delay cost caused by the extension, and thus calculation methods differ across entities. Logical valid calculation methods have also not been researched. Further, there are no Korean studies on the additional indirect cost caused by a suspension in a public construction project on a long-term continuing contract. The purpose of this research is to propose a method of calculating the indirect cost incurred by construction time extension that reflects the characteristics of Korean public construction projects. The cost patterns generated during construction periods were analyzed, and then the current criteria of calculating the indirect costs caused by the extension were examined. Following this, actual conditions and practices in the field were surveyed and the current calculation method was applied to a model case to compare the actual cost and that determined from the current calculation method. Issues with the current method were identified by this comparison. Based on this, this research proposes a method of calculating the total actual cost caused by a suspension in a public construction project that is appropriate for calculating the additional indirect cost generated by a suspension in a public construction project on a long-term continuing contract.

법령과 고시 - 건설업종 표준하도급계약서 개정

  • 대한기계설비건설협회
    • 월간 기계설비
    • /
    • s.319
    • /
    • pp.41-53
    • /
    • 2017
  • 공정거래위원회는 지난해 12월 30일 건설업종 표준하도급계약서를 개정하고 시행에 들어갔다. 개정된 건설업종 표준하도급계약서는 추가 변경공사 서면 발급 및 대금 지급의무, 하도급자 공사 중지 권한 및 공기연장 요청권, 부당특약 무효 및 하도급자 부당특약 비용부담 시 청구원 등 하도급업체의 권익 증진 조항이 포함되어 있다. 이는 대한기계설비건설협회가 회원사 권익보호를 위해 불공정 하도급 거래관행 개선을 지속적으로 건의한 결과이다. 개정전문은 협회 홈페이지(www.kmcca.or.kr) 에서 다운받을 수 있다.