Analysis of Delay Causation by Characteristics of Construction Projects  

Kim, Jong-Han (아주대학교 건축학부)
Kim, Kyung-Rai (아주대학교 건축학부)
Publication Information
Korean Journal of Construction Engineering and Management / v.8, no.1, 2007 , pp. 78-86 More about this Journal
Abstract
Top priority to manage construction projects is given to the planning and scheduling in order to keep the project duration, which is one of the most important factors in construction management. However, recently most of public construction projects especially for civil projects are delays and preventive research, many efforts were made concerning construction delays and preventive management methods. But analysis of delay causation, which is a main key to solve the problems is not done, yet. Therefore, in this research causation delays are analyzed by characteristics of construction projects, which are type of projects, type of contracts, project participants, and general condition. As a result of the analysis, delay causation are proved to be different by characteristics of the projects. The research results will be used for prevention of time extension and dispute resolution.
Keywords
Delay; Characteristics of Construction; Project Delay Causation; Claim of Time Extension;
Citations & Related Records
연도 인용수 순위
  • Reference
1 한종관외 2인, / 시공자 중심의 주요 공종별 공기지연 원인 분석에 관한 연구, 대한건축학회논문집 통권173호,2003
2 J. K. Yates, 'Avoiding and Minimizing Construction Delay Claim Disputes', Journal of Professional Issues in Engineering Education and Practice, Vol. 132, No. 2, 2006
3 윤성민외 3인, 경부고속철도 건설사업의 공기지연분석에 관한 연구
4 박준기, 건설클레임론, 일간건설사 대한건설협회,1999
5 신현식, 공사관리핸드북, 태림문화사,1995
6 이정호외 3인, 웹기반의 공기지연클레임 분석모형 구축에 관한 연구, 대한건축학회논문집 통권170호,2002
7 이배호, 건설공사관리, 구미서관,1998
8 James G. Zark Jr., 'Claim Prevention: Offence versus Defense', Cost Engineering, Vol. 39, No. 7, 1997
9 M. Asem U. Abdul-Malak, 외 2 'Process Model for Administrating Construction Claims', Journal of Management in Engineering, Vol. 18, No. 2, April 1, 2002
10 김병수외 1인, 공공건설공사 공사기간 산정모델에 관한연구, 2005
11 조훈희외 2인, 공기연장 실태조사를 통한 발주자중심 공기 지연 리스크 대응방안(공공발주 공동주택대상으로), 대한건축학회논문집 통권158호,2001
12 이재섭, 계약당사자 모두에게 책임이있는 공기지연의 해석방법, 대한건축학회논문집 통권202호,2005
13 국가계약법, 건설산업기본법, 회계예규 공사계약 일반조건등 건설관련법 규정집
14 장훈기, 정부계약제도, 범신사,1996