• Title/Summary/Keyword: 공공프로젝트

Search Result 319, Processing Time 0.044 seconds

A Foundation Study for User Satisfaction Degree's Estimated Model of Post-Evaluation in the public construction (공공공사 사후평가의 사용자 만족도 평가모델에 대한 기초연구)

  • Kim, Jae-Woo;Cho, Chang-Yeon;Shin, Tae-Hong;Kwon, Soon-Wook;Kim, Yea-Sang;Chin, Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.432-435
    • /
    • 2008
  • It's necessary to judge between success and failure of a project in order to secure the objective evaluation index and the transparency of that. In case of the public works including a construction section, the large-scale budget input proceeds, but the awareness regarding the efficiency and usefulness of the public works is decreasing because it's hard to estimate benefit originated from the results of the budget input. Therefore, this study is to propose the measurement standard for the post-evaluation based on the list of the resident response degree and user satisfaction degree to systematically and quantitatively measure the results of the post-evaluation for the public projects within the range of quantifying the consumer satisfaction degree for the facilities which preform the post-evaluation among the public projects with 50 billion budget.

  • PDF

An Exploratory Study on the Selection of Mandatory Subjects for Information Strategic Planning - Focused on Public Sector (정보화전략계획수립 의무화대상 설정에 관한 탐색적 연구-공공부문을 중심으로)

  • Ra, Jong-Hei
    • Journal of Digital Convergence
    • /
    • v.15 no.4
    • /
    • pp.35-42
    • /
    • 2017
  • Information strategy planning(ISP) is an analysis of the organization's work, information flow, and current information systems, and planning information structures to achieve organizational strategies and objectives. In addition to the systematic promotion of the information sector in the public sector, the government is required to establish an information strategy plan in order to enhance the efficiency of the information sector. However, there are many cases in which the IT project budget is reflected without establishing the information strategy planning. The purpose of this study is to clarify the criteria for establishing the information strategy planning in order to enhance the effectiveness of the information strategy planning. For this purpose, we set up a judgment model for Information strategy planning through expert group review (FGI) and conducted questionnaires on public sector experts. In addition, we proposed a project to establish an information strategy planning and an exceptional project based on the size of iinformatization project and characteristics of informatization project.

A study on the service design using 360° VR prototype -Focusing on the Case of Public Service Design by Citizen Autonomy (360° VR 프로토타입을 활용한 서비스디자인에 관한 연구 -주민자치형 공공서비스디자인 사례를 중심으로-)

  • Yoo, Hye-Young
    • Journal of Digital Convergence
    • /
    • v.17 no.11
    • /
    • pp.531-536
    • /
    • 2019
  • The Ministry of the Interior and Safety amends the enforcement ordinance of the public service design method and applies it to the project tasks of each institution and cases of social problem solving and public service innovation are increasing according to service design methodology. This study is to develop the $360^{\circ}$ VR content element in order to deliver the understanding and effective improvement of the service to the consumers in the process of problem discovery and the prototype that visualize the key solution according to the service design methodology. By applying it to the actual public service design project, it was possible to predict the result with high satisfaction after improvement. This paper is meaningful in that it proposes new approach and empirical value to consumers and contribute to the improvement of the service design process as a convergence study on the future service design using the $360^{\circ}$ VR prototype.

The Influence of Champion Leadership of R&D Project Leader on Project Viability and Team Efficacy (R&D 프로젝트 리더의 챔피언 리더십이 프로젝트 생존성 및 팀 효력에 미치는 영향)

  • Shim, Duk-Sup
    • Journal of Korea Technology Innovation Society
    • /
    • v.10 no.2
    • /
    • pp.206-229
    • /
    • 2007
  • This study draws on a sociopolitical perspective to investigate the possible impact of champion leadership by project leaders on project viability(resource supply and organizational support) and team members' team efficacy by analyzing the empirical data of 92 ongoing projects collected from 22 public and private R&D institutes in the electronics, telecommunication, machinery, and chemical industries. Results revealed that higher level of project championing by project leader tended to positively related to a high level of organizational support and resource supply. It was also found that teams members who experienced higher level of project championing by project leader tended to have higher team efficacy. Furthermore, project type and innovative climate moderate the champion leadership-project performance relationships. The results found in this study offer several theoretical and managerial implications. First, champion leadership by project leaders is quite helpful to get more moral support and legitimacy of the organization for the project, and thus for acquisition of more tangible and intangible resources required for successful implementation of the R&D project. Champion leadership by project leaders also impacts the morale and self-confidence of the team members. Project leaders gives a sense of purpose and meaning to project members by actively and enthusiastically promoting the project, and by expressing confidence in team members' capabilities to perform a given task. In addition, his or her soliciting assistance and additional resources can contribute the building the confidence of members that the project can be performed well. Second, the relationship between champion leadership and project performances is context-specific (i.e., project type and innovative climate). This study is one of the few to have tested the moderating effects between champion leadership and project performances with a empirical research design. This study extends the current knowledge on champion leadership in the innovation process by generalizing their importance in R&D projects to a new industrializing context, Korea, and further sheds light on the contingent relationship between champion leadership and project performances in the innovation process. Based on these findings, some areas for future research are discussed.

  • PDF

The Effects of R&D Process Maturity on Product Development Performance: Focused on Mediating Effect of R&D Project Performance (R&D 프로세스 성숙도가 제품개발 성과에 미치는 영향: R&D 프로젝트 성과의 매개효과를 중심으로)

  • Shin, Kyung Sic;Oh, Min Jeong;Kim, Won Ki;Park, So Hyun
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.7 no.7
    • /
    • pp.165-174
    • /
    • 2018
  • The purpose of this study is to verify the effects of R&D process maturity on product development performance and to verify whether R&D project performance mediating effect. The questionnaire was collected and analyzed to 131 persons related to the R&D work in 55 companies and public institutions performing R&D work. The results of this study are as follows, the effect of R&D process maturity on product development performance and mediating effect of R&D project performance were analyzed by simple and multiple regression analysis. Regression analysis was analyzed by SPSS statistical program. The higher the maturity level of the R&D process, the higher the product development performance and the R&D project performance, and the R&D project performance is partially mediated. It is concluded that it is important to establish and operate a systematic R&D process and to develop a project management methodology suitable for the characteristics of a company in order to improve product development performance. It is expected that if this study are utilized as practical R&D management methodology in corporate management, it will contribute to improvement of company product performance.

CM at Risk Case Study on Guaranteed Maximum Price Contract - Focused on Cases for USA - (책임형 CM 발주방식의 최대공사비보증계약 사례연구 - 미국 공공발주 프로젝트 사례 중심 -)

  • Jeong, Jinhak;Han, Jonghoon;Lee, Joosung;Ahn, Yonghan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.22-30
    • /
    • 2019
  • The purpose of this study is to derive basic data of the Guaranteed Maximum Price(GMP) process and to present specimens that can be used at the time of execution of CM at Risk project in South Korea. CM at Risk project is issued in South Korea, but the actual data is lack. On the other hand, CM at Risk project is universalized and the market of the CM at Risk is steadily growing. Because of that, in this study, The United States cases was selected as a sample. GMP consists of CM's fee, CM contingency, project direct cost, project indirect cost, allowance. GMP negotiations are performed before the end of design completion, and after 3 rounds of estimation comparison, preliminary GMP is confirmed. GMP can be multiple contract and it is useful for Procurement of long lead materials and early construction. If the actual cost is lower than expected GMP, sharing of the saving is an option since the conflict of interests between the client and the contractor can occur.

Development of BIM Functions and System for Construction Project Through Project Life Cycle -Focusing on Bridge Construction Project- (건설프로젝트 생애주기 BIM 활용 기능도출 및 시스템 구축 -교량공사를 중심으로-)

  • Kim, Hyeon-Seung;Moon, Hyoun-Seok;Choi, Gwang-Yeol;Kim, Chang-Hak;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.11-24
    • /
    • 2012
  • Recently, BIM (Building Information Modeling) technique is being considered as a critical delivery condition for the public projects according to the increase of best practices by practical application of BIM. However, since existing BIM studies are focused on the design and construction phases, those results are not considering the life cycle of a construction project. Therefore, this study suggests an integrated BIM operation process that enables an application of BIM for each phase of a construction project from planning to maintenance phases and develops an integrated BIM system based on the suggested methodologies. This study developed basic BIM functions and its application process by analyzing information systems in each project phase for a bridge construction project. Besides, this study performed case study and survey analysis for construction managers to verify a practical applicability of the developed system. Therefore, it is expected that the integrated BIM system is going to be utilized as a 3D-based integrated information management system considering life cycle of construction projects.

The Procedure for Improving Structural Methodology or Information engineering Methodology (구조적 또는 정보공학 소프트웨어 개발 방법론 개선 절차)

  • Jung, Byung-Kwon;Yoon, Seok-Min
    • The KIPS Transactions:PartD
    • /
    • v.9D no.6
    • /
    • pp.1083-1090
    • /
    • 2002
  • The software development methodology has not caught up with the rapid change of information technology. Most of the software development projects use structural methodology or information engineering methodology. If established software development methodologies don't reflect technologies applied to the project, the project may be performed ineffectively. This paper describes a model in which we can apply a new information technology to an already existed structural methodology or information engineering methodology. This model uses the technique of the divide and conquer that software development life cycle is divided into phases, each phase is divided into viewpoint- areas and the software development processes of a new information technology are applied to each small area. By using the design phase this paper shows application example, in which I applied web-based development processes to CS@RoadMap Methodology of KCC Information & Communication, a system provider in Korea. The CS@RoadMap Methodology reflecting the Web technology, Web@RoadMap Methodology, has been applied to the public-domain projects.

The Process Model for Project Management of Design-Build System and Constitution of Database (설계시공일괄 방식의 건축 프로젝트 관리를 위한 프로세스 모델 및 데이터베이스 구축)

  • Chun Jae-youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.109-116
    • /
    • 2005
  • Recently, the design-build delivery system is being generalized in domestic construction project. The design-build system is becoming an increasingly preferable alternative to design-bid-build delivering method. In design-build project, however, a large construction company and design firm make up consortium as a design-build contractor rather din single company performs design and construction work. In this case, usually the construction companies take a leading role but due to their lack of managerial t31ow-how in the design-build system, they could miss the merits of this approach. Therefore, it is necessary to investigate throughly the function and information flows all over the design-build project. This research suggests a process model and database in the whole phase of design-build project. This process model and database system will also support to improve the consistency of functional process and minimize incoherent activities of the design-build projects.

Analyzing Characteristics of Design-Build Delivery System in Korea Using System Dynamics Modeling (시스템다이내믹스 모델을 이용한 국내 설계시공 일괄입찰 발주방식 특성분석)

  • Lee, Hyun-Soo;Ji, Sae-Hyun;Park, Moon-Seo;Song, Sang-Hun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.119-131
    • /
    • 2007
  • Design build (DB) is a construction project delivery system which has become one of the favored ones and the growth of DB by the public agencies has been steadily increasing. DB can be viewed as an evolutionary project delivery system, since DB project team members collaborate on work with each other, keep seeking cost effective and innovative alternatives that meet the construction needs of the project. Thus DB outperformed others in delivery speed, cost saving, and turnover quality. In Korea, DB projects likewise have steadily increased that it is needed to analyze characteristics of DB delivery system in Korea. For that purpose, this research would offer an analysis of characteristics of DB delivery system in Korea using system dynamics model with investigating the public market trend, comparing DB performance to DBB, and analyzing questionnaire survey.