• Title/Summary/Keyword: 견적정보

Search Result 82, Processing Time 0.038 seconds

Object & Parameter based Schematic Estimation Model for Predicting Cost of Building Interior finishings (오브젝트-파라미터기반 건축마감공사비 개산견적 모델)

  • Koo, Kyo-Jin;Park, Sung-Ho;Park, Sung-Chul;Song, Jong-Kwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.175-184
    • /
    • 2008
  • For deciding the profitability and feasibility of the construction project, the schematic estimation has to not only link the design decision-making but also estimate the cost with reliability. The prototype-based schematic estimation system was developed for easily linking with design-making and supports to evaluate the design alternatives in the design development stage but didn't consider the cost estimated by parameter and additional work items by users. This research presents the object-parameter based schematic estimation model in the design development stage that can lead to accurately estimate the cost by using historical data from the high-storied office buildings. For the development of the proposed model for schematic estimation, after analyzing and classifying the work items from the Bills of Quantities(BOQs) and drawings of historical data, this research proposed the methods of estimating cost in accordance with attributes of each work item. In addition, a case study is performed for the effectiveness as comparing the previous estimating method with the proposed model.

A Development of 3D Computer-Aided Design(CAD) Add-on Program for a Quantity Take-off through the User Needs Analysis (사용자 요구 사항 분석에 따른 물량산출 연동 프로그램 개발)

  • Kim, Seong-Ah;Lee, Jea-Jun;Shin, Tea-Hong;Chin, Sang-Yoon;Kim, Yea-Sang;Choi, Cheol-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.297-300
    • /
    • 2008
  • Since the Three Dimensional Computer Aided Design(3D CAD) appeared in 1990s, Building Information Modeling(BIM) has got the great issue in the construction project nowadays. BIM is the process of managing and generating building information during life cycle of a construction project. And information can be moved to 3D modeling flexibly in BIM. As a result, a field of estimating has also been doing researches in the calculation of the amount of building materials from 3D modeling. And the Construction Cost Estimating Software which is generally used over the world has been trying to be applied to the Construction project in Korea. But, when we consider the productivity, it is less efficient than the existing way in Korea which use the 2D Drawings when they take off the Quantity. Also, there are lots of difference how to estimate the construction cost. between Korea and the others. Because it is a bit hard to apply the software used in the other countries to the construction project in Korea, people couldn't use it well in the construction project actually. In this study, for developing the appropriate construction cost estimating software rooted in 3D in Korea, we suggest 3D CAD Add-on Program for a Quantity Take-off which can move quantitative information to 3D CAD.

  • PDF

Schematic Estimate Framework of Finishing Works based on IFC-BIM Knowledge (IFC-BIM 연계 지식정보기반 마감공사 개산견적 프레임워크)

  • Park, Sang-Hun;Park, Hyung-Jin;Koo, Kyo-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.6
    • /
    • pp.4176-4184
    • /
    • 2015
  • Cost Estimate for alternative in design phase of construction become criterion for profitability and feasibility analysis of projects. Initial design phase performed schematic estimate based on similar data in the past. The quantity take-off according to estimators experience and calculation method are occurred different or missing. IT (Information Technology) technology evolution has been promoting BIM technology in construction. It is changing the paradigm of planning, design, construction and maintenance phase throughout the construction project. A number of studies have been attempted to apply BIM technology in the construction. In this paper, we propose schematic estimation framework linking standard format IFC (Industry Foundation Classes) and estimate related knowledge. As a result, it performs a cost prediction for decision-making in the design phase, and expected to overcome the limitations of previous studies. In addition, it is possible actively coping with changes.

The Study of Cost Estimation Model for Software Maintenance (소프트웨어 유지보수 견적모델 구현 사례 연구)

  • Park, Joon-Woo
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2010.04a
    • /
    • pp.911-914
    • /
    • 2010
  • 대법원 등기업무시스템의 유지보수시 적용된 CSR(Court Service Request)견적모델의 구축 사례에 대한 연구를 통하여 소프트웨어 유지보수시 변경된 모듈뿐만 아니라 모듈 이외의 작업에 소요된 공수 그리고 시스템 특징과 유지보수 절차를 고려한 비용산정 모델을 제시하고자 한다.

Development of Cost Estimating Model Using Quantity Variation Analysis by Influence Variables for the Schematic Design Phase (영향변수에 따른 수량변화 분석을 이용한 기본설계단계의 개산견적 모델 개발)

  • Son, Bo-Sik;Lee, Hyun-Soo;Kim, Sung-Tae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.155-166
    • /
    • 2007
  • The purpose of this research is to develop a conceptual model and prototype that establishes a new approach for building cost estimating in the schematic design phage. This research use the method that analyzes quantity and unit price separately to enhance schematic cost estimating through conducting literature review andi analyzing existing schematic cost estimating methods. In addition, this study proposes tile concept of cost breakdown structure including two more classifications: building element and floor compared to existing one only classified by trade. Thus, a Quantity Based Active Schematic cost Estimating(Q-BASE) model is developed founded on those two concepts. By applying proposed schematic cost estimating model, historical structure cost of residential complex building project is analyzed, and then, based on this analysis, prototype is implemented.

A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase (BIM 기반의 시공단계 견적데이터를 활용한 일일 진도관리모델 구축 방안)

  • Jung, Jun-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.23-34
    • /
    • 2011
  • Reliable progress management at construction requires integrated information of cost and schedule, and information is used as a basis for project performance measurement. However, separate handling of cost and schedule information at construction projects makes objective measurement more difficult and decreases management productivity due to additional works for breaking down bill of quantities into corresponding activities. Recently, research related to BIM addresses issues on effective progress management based on BIM with incorporation of daily progress management. Therefore, the objective of this paper is to propose information model for daily progress rate and budgeted cost of work performed by utilizing BTM-based quantity and location information.

A Study of BIM based estimation Modeling data reliability improvement (BIM기반 견적 모델링 데이터 신뢰성 향상을 위한 연구)

  • Kim, Yeong-Jin;Kim, Seong-Ah;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.43-55
    • /
    • 2012
  • A methodology for BIM Quality Assurance in the construction industry is becoming increasingly an important issue to determine the reliability of BIM. However, the quality assurance of BIM is currently limited to check 3D models, such as clash detection and space layout while verification methods for disciplinary BIM results from structural engineering, mechanical engineering, and estimation do not exist yet. Particularly, in the BIM-based estimation mathematical equations to take off quantities are not clearly exposed so that the results are not quite accepted at practices. With the concept of reliability engineering defined in the manufacturing industry to improve reliability of outcomes of BIM-based quantity take-off, impacting factors that affect reliability of BIM-based quantity take-off were derived. It was found that the factors also include the modeling method and the features of a BIM tool. Therefore, this research aims to propose modeling and verification methods to improve reliability of BIM-based quantity take-off through the pilot test that was performed with commercial BIM tools and IFC-based BIM data.

A Study on the Strategy of the Use of Big Data for Cost Estimating in Construction Management Firms based on the SWOT Analysis (SWOT분석을 통한 CM사 견적업무 빅데이터 활용전략에 관한 연구)

  • Kim, Hyeon Jin;Kim, Han Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.2
    • /
    • pp.54-64
    • /
    • 2022
  • Since the interest in big data is growing exponentially, various types of research and development in the field of big data have been conducted in the construction industry. Among various application areas, cost estimating can be a topic where the use of big data provides positive benefits. In order for firms to make efficient use of big data for estimating tasks, they need to establish a strategy based on the multifaceted analysis of internal and external environments. The objective of the study is to develop and propose a strategy of the use of big data for construction management(CM) firms' cost estimating tasks based on the SWOT analysis. Through the combined efforts of literature review, questionnaire survey, interviews and the SWOT analysis, the study suggests that CM firms need to maintain the current level of the receptive culture for the use of big data and expand incrementally information resources. It also proposes that they need to reinforce the weak areas including big data experts and practice infrastructure for improving the big data-based cost estimating.

Estimating System for Concrete Bridge using 3D Bridge Information Models (3차원 교량정보모델에 기반한 콘크리트 교량의 견적 시스템)

  • Shim, Chang-Su;Kim, Deok-Won;Lee, Kwang-Myong
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2009.05a
    • /
    • pp.43-44
    • /
    • 2009
  • 3D bridge information models for a concrete box-girder bridge were built and a typical application example for the estimation linked with the 3D models was proposed. 3D geometry objects with PBS (product breakdown structure) were constructed using standard classification codes and 2D drawings. Information on the amount of materials according to the classification codes was utilized for the estimation system. A process for the estimation of concrete and rebars was developed and verified through the pilot test. Optimization of rebar fabrication was suggested as an additional function and was utilized for the cost reduction and standard fabrication.

  • PDF