Browse > Article

Development of Cost Estimating Model Using Quantity Variation Analysis by Influence Variables for the Schematic Design Phase  

Son, Bo-Sik (희림종합건축사사무소)
Lee, Hyun-Soo (서울대학교 건축학과)
Kim, Sung-Tae (서울대학교 건축학과)
Publication Information
Korean Journal of Construction Engineering and Management / v.8, no.4, 2007 , pp. 155-166 More about this Journal
Abstract
The purpose of this research is to develop a conceptual model and prototype that establishes a new approach for building cost estimating in the schematic design phage. This research use the method that analyzes quantity and unit price separately to enhance schematic cost estimating through conducting literature review andi analyzing existing schematic cost estimating methods. In addition, this study proposes tile concept of cost breakdown structure including two more classifications: building element and floor compared to existing one only classified by trade. Thus, a Quantity Based Active Schematic cost Estimating(Q-BASE) model is developed founded on those two concepts. By applying proposed schematic cost estimating model, historical structure cost of residential complex building project is analyzed, and then, based on this analysis, prototype is implemented.
Keywords
Building Project; Schematic Cost Estimating; Quantity Variation; Influence Variable; Building Element; Prototype;
Citations & Related Records
연도 인용수 순위
  • Reference
1 김문한 (2006), 건축생산관리학, 기문당, pp.251-253
2 박현석.정영수.이영환.이복남 (1999), '실적공사비 기반 의 개략견적 시스템 개발.' 대한건축학회학술발표논문집, 제 19권 제2호, p.939
3 조지훈.김선국.신진수.한충희 (1998), '유사프로젝트에 의한 건설 사업비 산정 코스트 모델 개발.' 대한건축학회학술발표논문집, 제 18권 제2호
4 AACE (1995), Cost Engineers' Notebook, AACE
5 Adeli, H. and Wu, M. (1998), 'Regularization neural network for construction cost estimation.' Journal of Constr. Engrg. and Mgmt., ASCE, 124(1), pp.18-24   DOI   ScienceOn
6 McCaffer, R. (1975), 'Some analysis of the use of regression as an estimating tool.' Quantity surveyor, 32, pp.81-86
7 Miller, G., Todd, P., and Hedge, S. (1989), 'Designing neural networks using genetic algorithms.' pp.379-384
8 Mckim, Robert (1993), 'Neural Network Applications to Cost Engineering.' Cost Engineering, AACE, Vol.35, No.7, pp.31-35
9 백승호.김선국.한충희 (1997), '시뮬레이션을 이용한 통계 적 코스트 모델의 유효성 검증방법.' 대한건축학회학술발표논문집, 제17권 제2호
10 Gould, F. E. and Joyce, N. E. (2003), Construction Project Management, 2nd ed., Plentice-Hall
11 김광희.강경인 (2004), '사례기반추론 기법을 이용한 공동주 택 초기 공사비 예측에 관한 연구.' 대한건축학회논문집, 제 20권 제5호
12 박우열∙차정환∙강경인 (2002), '신경망이론을 이용한 공동 주택 초기사업비 예측에 관한 연구.' 대한건축학회논문집, 제 18권 제7호
13 Smith, N. J. (1995), Project Cost Estimating, Thomas Telford, London
14 김광희.강경인 (2003), '공동주택 프로젝트의 초기 공사비 예측을 위한 신경망 학습에 유전자 알고리즘을 적용한 모델 에 관한 연구.' 대한건축학회논문집, 제19권 제10호, pp.133 􀅭142
15 Wason, I. (1995), 'CBRefurb:Case-Based Cost Estimation, Case Based Reasoning: Prospects for Application.' IEE Colloquium on 7, Mar. 1995
16 김용민 (1988), '공동주택의 개산견적에 관한 사례연구.' 대한건축학회학술발표논문집,제8권,제2호, pp.745-748
17 Garza, Jesus M. de la and Rouhana, Khalil G. (1995), 'Neural Networks Versus Parameter-based Application in Cost Estimation.' Cost Engineering, AACE, Vol.37, No.2, pp.14-18
18 Adrain, J. J. (1993), Construction Estimation, STIPES Publishing Company
19 김기동 (1991), 우리나라 공동주택의 코스트 모델 개발에 관한 연구, 서울대 박사학위 논문
20 Ferry, D. J. and Brandon, P. S. (1999), Cost Planning of Building, 7th ed. Blackwell Science