Browse > Article
http://dx.doi.org/10.5762/KAIS.2015.16.6.4176

Schematic Estimate Framework of Finishing Works based on IFC-BIM Knowledge  

Park, Sang-Hun (Department of Architectural Engineering, University of Seoul)
Park, Hyung-Jin (Department of Architectural Engineering, University of Seoul)
Koo, Kyo-Jin (Department of Architectural Engineering, University of Seoul)
Publication Information
Journal of the Korea Academia-Industrial cooperation Society / v.16, no.6, 2015 , pp. 4176-4184 More about this Journal
Abstract
Cost Estimate for alternative in design phase of construction become criterion for profitability and feasibility analysis of projects. Initial design phase performed schematic estimate based on similar data in the past. The quantity take-off according to estimators experience and calculation method are occurred different or missing. IT (Information Technology) technology evolution has been promoting BIM technology in construction. It is changing the paradigm of planning, design, construction and maintenance phase throughout the construction project. A number of studies have been attempted to apply BIM technology in the construction. In this paper, we propose schematic estimation framework linking standard format IFC (Industry Foundation Classes) and estimate related knowledge. As a result, it performs a cost prediction for decision-making in the design phase, and expected to overcome the limitations of previous studies. In addition, it is possible actively coping with changes.
Keywords
Finishing Works; IFC-BIM; Knowledge-based; Schematic Estimate;
Citations & Related Records
Times Cited By KSCI : 5  (Citation Analysis)
연도 인용수 순위
1 I. H. Kim, "An IFC-Based Data Model for Structural Design Phases of Buildings", PH. D. Thesis, Seoul National University, 2004.
2 J. Y. Chun, "A Study on the Construction of Computerized Algorithm for Proper Construction Cost Estimation Method by Historical Data Analysis", Korean journal of construction engineering and management, Vol. 4, No. 4, pp. 192-200, 2003.
3 S. H. Hong, I. S. Choi, "A Study on the Cost Prediction Model of Office Building", Journal of the Architectural Institute of Korea, Vol. 17, No. 2, pp. 129-140, 2001.
4 Y. I. Jeon, C. S. Hwang and T. K. Park, "Construction cost Prediction Model for Educational Building", Proceedings of KICEM Annual Conference, pp.290-295, 2004.
5 C. H. Park, S. H. Chang and K. H. Kim, "A Probabilistic Cost Planning Model during the Design Decision-Making Process-Focused on High-Rise Office Building", Journal of the Architectural Institute of Korea, Vol. 19, No. 11, pp. 181-189, 2003.
6 W. Y. Park, J. H. Cha and K. I. Kang, "A Neural Network Cost Model for Apartment Housing Projects", Journal of the Architectural Institute of Korea, Vol. 18, No. 7, pp. 155-162, 2002.
7 G. H. Kim, K. I. Kang, "A Study on Predicting Construction Cost of Apartment Housing Projects Based on Case Based Reasoning Technique at the Early Project Stage", Journal of the Architectural Institute of Korea, Vol. 20, No. 5, pp. 83-92, 2004.
8 S. W. Oh, B. J. Sung, Y. S. Kim and J. R. Kim, "Development of an Automated Cost Estimating System using 3D CAD Building Element Information", Journal of the Architectural Institute of Korea, Vol. 17, No. 6, pp. 103-112, 2001.
9 C. H. Choi, Y. J. Park, S. H. Han and S. Y. Chin, "Recipe-based estimation system for 5D(3D + Cost + Schedule) CAD system", Proceedings of KICEM Annual Conference, pp.154-160, 2006
10 Y. S. Hwang, "Automatic Quantity Takeoff from Drawing Through IFC Model", Journal of the Architectural Institute of Korea, Vol. 20, No. 12, pp.89-97, 2004.
11 M. G, Yoo, "A study on improving estimating practices of building projects using BIM", Master's. Thesis, Chung-ang University, 2009
12 Shen, Z., and Raja, R. A, "Quantitative Evaluation of The BIM-Assisted Construction Detailed Cost Estimation", Journal of Information Technology in Construction, Vol. 15, pp.234-257, 2010.
13 S. A. Kim, S. W. Yoon, S. Y. Jin and T. Y. Kim, "A Development of Automated Modeling System for Apartment Interior to Improve Productivity of BIM-based Quantity Take-Off", Journal of the Architectural Institute of Korea, Vol. 25, No. 9, pp.133-143, 2009.
14 P. Vaidya, L. Greden, D. Eijadi, T. McDougall, R. Cole "Integrated cost-estimation methodology to support high-performance building design", Energy Efficiency Vol. 2, No. 1, pp.69-85, 2008. DOI: http://dx.doi.org/10.1007/s12053-008-9028-4   DOI
15 K. J. Koo, S. H. Park, S. C. Park and J. K. Song, "Object & Parameter based Schematic Estimation Model for Predicting Cost of Building Interior finishings", Korean journal of construction engineering and management, Vol. 9, No. 6, pp.175-184
16 H. G. Kim, "Object-based Design Decision Support System for Cost Control of Building Interior-Finishing", Master's. Thesis, University of Seoul, 2008.