• Title/Summary/Keyword: 건설 프로젝트 성과관리

Search Result 184, Processing Time 0.034 seconds

Selecting Optimum Management Practices according to Project Characteristics for Improving Project Performance (건설 프로젝트 특성에 따른 성과 제고가 가능한 최적 공사 관리기법 선정 방안)

  • Ko, Young-Jin;Cha, Hee-Sung;Shin, Dong-Woo;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.3-13
    • /
    • 2012
  • The importance of project performance management as an alternative for solving problems is rising, which are followed by the hardships of managing construction project in the construction industry. This research classifies and applies the improvements made by the operator's work, in order to apply factors of success on the construction project, as performance management factors. In addition, in order to predict the results reflecting the project characteristic of performance management factor un-improvable by the operator in the initial stage of construction, the effect of project characteristic to the performance was drawn by performance difficulty. Also, in order to improve the predicted performance, researches on setting valid best practices according to the performance territory through a correlation analysis between the best practices improvable through the operator's work, and the performance was made.

Developing Measurement System for Key Performance Indicators on Building Construction Projects (건설 프로젝트 효율적 성과관리를 위한 핵심 지표 체계 구축)

  • Cha, Hee-Sung;Kim, Tae-Kyoung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.120-130
    • /
    • 2008
  • In construction industry, project performance should be evaluated in terms of project value objectives, i.e., cost, time, quality, safety, and environment. However, there have been few, if any, systematic approaches in assessing comprehensive performance level which encompasses the whole spectrum of project value objectives. It is non trivial to establish the standardized performance metric system due to the project individualities. This study provides a new approach in assessing the wide variety of project performance types by collecting the real industry project data. In addition, the proposed system has been validated through industry survey on project practitioners. It is concluded that the developed quantitative project performance measurement system would be effectively useful in indicating the level of current status of a particular project and furthermore, to provide a meaningful strategy for the future project in a more sustainable way.

A Development of Project Performance Predicting System(PPS) considering Construction Project Characteristics (건축 프로젝트의 특성을 고려한 성과 난이도 예측 시스템 개발)

  • Ko, Young-Jin;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.62-72
    • /
    • 2011
  • Currently, The failure of construction project is increasing to be caused by a changing construction environment. According to this circumstances, Researches of project success factors affecting performance have been presented to develop strategies for efficient construction project management in the construction industry. However, Conducting efficient construction project management is difficult because project manager could not know which project success factors can be improved or not. Especially, although the project characteristics were derived the level of difficulty for performance, research of the project characteristics which could not be improved as influence factor to performance is lacking. Therefore, This paper has developed the Performance Predicting System(PPS) with Fuzzy set theory to establish. PPS has been developed to establish efficient project management strategies and to save time and effort. As Contractor inputs the project characteristics, PPS can predict the level of difficulty of performance.

Development of Construction Project Performance Management System(PPMS) Considering Project Characteristics (건설 프로젝트 리스크 관리 효율성 향상을 위한 성과측정시스템(PPMS) 개발)

  • Cha, Hee-Sung;Kim, Ki-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.82-90
    • /
    • 2013
  • In the construction industry, there are so many qualitative factors affecting the performance of a project. So it is crucial to measure the factors in an effective way in order to analyze the interrelationship among the various factors. To improve the performance level of a project, it is also important to identify the most appropriate management practices which are inter-linked with the subject project. The purpose of this study is to develop a project performance management system (PPMS) to quantitatively analyze the variety of project performance data and identify the best management practice to increase the potential level of a particular performance area. Using a comparative statistical method, this study developed a quantification method and web-based computerized system to enhance the usage of the system. The system, however, is still under the validation stage because of the shortage of data set. In the future, when more and more completed project data are stored in the system, the system would play a crucial role in predicting the performance level and matching the best management practice for a subject project. In addition, the system can also be modified as a tool for a business- or industry-level system by incorporating the existing enterprise resource programs.

Web 2.0 Cluster based Process and Performance Management System Modeling (Web 2.0 Cluster 기반의 공정 및 성과관리 시스템 모델 구축)

  • AHn, Jae-Gyu;Ong, Ho-Kyoung;Kim, Dae-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.892-898
    • /
    • 2007
  • This study aims to implement an efficient process management system for small and medium sized(local) construction companies and a performance management system for the Korean construction industry. The process management system by Lean Construction is Web 2.0 platform-based and creates clusters with numerous general contractors and sub-contractors, which will enable mutually organic process management. Plus, this system will enable them to compare project performance management by analyzing it during or after a project by collecting and accumulating lots of data occurring in pursuit of a project. These performance management cases will be of help in process planning during similar upcoming projects. This study is expected to somewhat reduce the burden of implementing a complicated process management protocol and system that Korean small and medium sized (local) construction companies experience with their web-based process management, and is supposed to realize accurate performance management with highly reliable data which are significantly accumulated within the database.

  • PDF

A Study of Project Characteristics and Project Performance Level of difficulty (건설 프로젝트 특성과 프로젝트 성과 난이도 도출에 관한 연구)

  • Cho, Young-Seon;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.6
    • /
    • pp.78-88
    • /
    • 2010
  • Since the larger and complex construction projects are performed, project performance measurement is highlighting the importance to eliminate inefficiencies and plan to reasonable management practices. So many researchers are conducting research about the project critical sucess factor. But, these factors are mixed both management practices to improve performance and native project characteristics. Therefore performance measurement data couldn't apply to another project successfully. And the project characteristics affect project performance. But contractor couldn't change characteristics. This study provides a project characteristics's definition and classification. This study provides a quantitative level of performance improvement difficulty through out project manager survey. The contractor can estimate a level of performance difficulty through initial project information. With this, project contractor can more efficiently manage project.

A study on the Project Performance Measurement Baseline for Clients (발주자를 위한 프로젝트 성과측정기준선 설정 방안에 관한 연구)

  • Ko, Dae-Jun;Choi, Eun-A;Park, Dong-Jin;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.513-516
    • /
    • 2008
  • The risk in the constructions projects is extremely diverse because there are too many indefinite factors. Therefore, Performance Measurement Baseline(PMB) is needed regularly during the construction process. However, nowdays, the PMB in the constructions projects is for contractors' PMB and Performance Management(PM). Clients have a lot of difficulties to control and manage the projects. Therefore, this paper classifies schedule and cost data of the public apartments houses which is a actual cases into types and then conducts regression analysis and deduces a regression. In addition to this paper establishes the Work Breakdown Structure(WBS) and suggests the PMB for the clients through using that.

  • PDF

An Application of PDA and Barcode Technology for the Improvement of Information Management in Construction Projects (건설프로젝트 정보관리 효율화를 위한 PDA 및 Barcode 적용기술 개발)

  • Oh Se-Wook;Kim Young-Suk;Lee Jun-Bok;Kim Han-Soo;Sung Nak-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.553-558
    • /
    • 2003
  • The information of works performed by labors can be used for analyzing project status related to schedule, cost and productivity, etc. The purpose of this research is to develop a computer-based system by the application of PDA and barcode technology in order to measue and monitor the amount of workforce resources, works done and productivity. It is anticipated that the effective use of the devepoped system would be able to effectively assist the schedule planning and management for present and prospective construction projects.

  • PDF

Development of Performance Analysis System for Construction Projects Using Data Warehousing Technology (데이터 웨어하우스 기술을 활용한 건설프로젝트 성과분석 시스템 개발)

  • Yu Jung-Ho;Song Sang-Hoon;You Won-Hee;Lee Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.89-98
    • /
    • 2005
  • Recently the construction industry in Korea is facing problems such as low productivity, contraction of the domestic construction market, growing competition, and so on. To enhance the competitiveness continuously through efficiency in this business environments, construction companies need to make efforts to measure and accumulate performance data based on the strategic factors. When analysing performance of construction projects, the unique characteristics of each project should be considered properly, by which the managers can identify current status of project in various perspectives. This study proposes the performance analysis system using the concepts of balanced scorecard and data warehouse technology. The suggested system provides the management with the flexibility in analyzing performance data by applying the pre-defined key performance indicators and the function of multi-dimensional analysis.

Measuring of the Performance of a Construction Management Project from Viewpoints of Project Participants -Focusing on Owner, Construction Manager, Designer and Constructor- (건설사업 참여주체(발주자, CMr, 설계자, 시공자) 관점에서 건설사업관리 성과측정에 관한 연구)

  • Ahn, Eun-Jin;Yoo, Byeong-Gi;Lee, Yoon-Sun;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.194-205
    • /
    • 2008
  • The production process of construction industry is different from thing of the general manufacturing, likewise various participants make temporary teamwork for success of the project through sharing of information. But, the each role of participants is Individually changed to step in construction process stage and moreover it has complicated, entangled interests. The CM(so it called Construction Management as an abbreviation word) system was inducted for the effective management and operation of construction project. The key of the CM success depends on the cooperative relationship relation to major participants. There are lots of studies and efforts for the performance measures of the CM, however existing performance index is only measured as the viewpoint of project owner. Therefore it needs to make up for balanced view through combination of the four-way view of participants. In this study, we should search for cooperative relationship of project participants, and then we should suggest to define the difference of project in their viewpoints.