Development of Construction Project Performance Management System(PPMS) Considering Project Characteristics  

Cha, Hee-Sung (아주대학교 건축학과)
Kim, Ki-Hyun (아주대학교 건축학과 대학원)
Publication Information
Korean Journal of Construction Engineering and Management / v.14, no.1, 2013 , pp. 82-90 More about this Journal
Abstract
In the construction industry, there are so many qualitative factors affecting the performance of a project. So it is crucial to measure the factors in an effective way in order to analyze the interrelationship among the various factors. To improve the performance level of a project, it is also important to identify the most appropriate management practices which are inter-linked with the subject project. The purpose of this study is to develop a project performance management system (PPMS) to quantitatively analyze the variety of project performance data and identify the best management practice to increase the potential level of a particular performance area. Using a comparative statistical method, this study developed a quantification method and web-based computerized system to enhance the usage of the system. The system, however, is still under the validation stage because of the shortage of data set. In the future, when more and more completed project data are stored in the system, the system would play a crucial role in predicting the performance level and matching the best management practice for a subject project. In addition, the system can also be modified as a tool for a business- or industry-level system by incorporating the existing enterprise resource programs.
Keywords
Best Management Practice; Correlation Analysis; Performance Management System; Project Performance Management; Web-based Software;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 신용일.김한수 (2004), "건설사업 성과측정기법 비교분석 및 성과측정 Best Practice에 관한 연구", 대한건축학회논문집, 제20권 제3호, pp.109-116.   과학기술학회마을
2 유일한.김경래.정영수.진상윤.김예상 (2004), "건설산업의 비교 가능한 성과측정 모델 framework", 한국건설관리학회 논문집, 제5권 제5호, pp.172-182.
3 조영선.차희성 (2010), "건설 프로젝트 특성과 프로젝트 성과 난이도 도출에 관한 연구", 한국건설관리학회 논문집, 제11 권 제6호, pp.78-88
4 차희성.김태경(2008)," 건설 프로젝트 효율적성과 관리를 위한 핵심 지표 체계 구축", 한국건설관리학회 논문집, 제9권 제 4호, pp.120-130.
5 Hwang, B., Thomas,, S., Degezelle, D., and Caldas, C. (2008), "Development of a benchmarking framework for pharmaceutical capital projects"J. of Construction Management and Economics, 26(2), pp. 177-195.   DOI   ScienceOn
6 Lee, S., Thomas, S., and Tucker, R. (2005), Web-Based Benchmarking System for the Construction Industry, ASCE J. of Construction & Management, pp. 790-798.
7 Ozorhon, B., Arditi, D., Dikmen, I., and Birgonul, M. (2011), Toward a Multidimensional Performance Measure for International Joint Venttures in Construction, ASCE J. of Construction Engineering & Management, pp.403-411.
8 Suk, S., Hwang, B., Dai, J., Caldas, C., and Mulva, S. (2012), Performance Dashboard for a Pharmaceutical Project Benchmarking Program, ASCE J. of construction Engineering & Management, pp. 864-876.
9 박문서.김남호.이현수.안창범.이규성 (2009), BSC를 활용한 Data Warehouse 기반의 건설 프로젝트 성과관리, 한국건설관리학회 논문집 제10권 제2호, pp.14-25.
10 고영진.차희성.신동우.김경래 (2011), "건축프로젝트의 특성에 따른 성과제고 최적 공사관리 기법 선정 방안", 한국건설관리학회 논문집 제13권 제1호, pp.3-13.