Development of Performance Analysis System for Construction Projects Using Data Warehousing Technology

데이터 웨어하우스 기술을 활용한 건설프로젝트 성과분석 시스템 개발

  • 유정호 (서울대학교 대학원 건축학과) ;
  • 송상훈 (서울대학교 대학원 건축학과) ;
  • 류원희 (서울대학교 대학원 건축학과) ;
  • 이현수 (서울대학교 건축학과)
  • Published : 2005.02.01

Abstract

Recently the construction industry in Korea is facing problems such as low productivity, contraction of the domestic construction market, growing competition, and so on. To enhance the competitiveness continuously through efficiency in this business environments, construction companies need to make efforts to measure and accumulate performance data based on the strategic factors. When analysing performance of construction projects, the unique characteristics of each project should be considered properly, by which the managers can identify current status of project in various perspectives. This study proposes the performance analysis system using the concepts of balanced scorecard and data warehouse technology. The suggested system provides the management with the flexibility in analyzing performance data by applying the pre-defined key performance indicators and the function of multi-dimensional analysis.

부가가치 창출의 미흡, 국내 건설시장의 수주여건 악화, 해외 건설시장에서의 경쟁력 상실 등의 문제에 직면한 국내건설업이 건설생산의 효율성 향상을 통해 건설업의 경쟁력을 장기적 관점에서 지속적으로 향상시켜 나가기 위해서는, 경쟁력의 원천이 되는 전략적 요소들을 도출하고 이 요소들에 근거하여 건설산업의 기본 생산단위가 되는 개별 건설프로젝트의 성과를 지속적으로 측정 $\cdot$ 관리하는 것이 필요하다. 건설프로젝트 성과분석에는 각 프로젝트가 처한 상황이 적절히 고려되어 하며, 성과분석자가 개별 프로젝트의 상황을 다양한 관점에서 조견할 수 있어야 한다. 이를 위해 본 연구에서는 균형성과표(BSC)와 데이터 웨어하우스 기술을 활용한 건설프로젝트의 성과분석 시스템을 개발하고자 한다.

Keywords

References

  1. 서길수, 데이터베이스관리, 박영사, 2000
  2. 이한규, 정보자원관리, 법영사, 1995
  3. 장남식 외 2인, 데이터마이닝, 대청, 2000
  4. 조재희 외 1인, OLAP 테크놀로지, 시그마컨설팅그룹, 1999
  5. Alarcon, L. F. and Ashley, D. B., 'Modeling Project Performance for Decision Making', Journal of Construction Engineering and Management, Vol.122, No.3, 1996, pp.265-273 https://doi.org/10.1061/(ASCE)0733-9364(1996)122:3(265)
  6. Ellis Jr, R. D., 'Identifying and Monitoring Key Indicators of Project', Lean Construction, A.A.Balkema, Rotterdam, 1997, pp.43-49
  7. Kagioglou, M.,' Performance Management in construction: a Conceptual Framework', Construction Management and Economics, 2001 (19), pp.85-95
  8. Kalpan, R. and Norton, D., 'The Balanced Scorecard-Measures That Drive Performance', Harvard Business Review, Jan-Feb 1992
  9. Kimball, R. et al., The Data Warehouse Lifecycle Toolkit, John Wiley & Sons, 1998
  10. Kimbal, R., The Data Warehouse Toolkit, John Wiley & Sons, 1996
  11. Lantelme, E. and Formoso, C. T., 'Improving Performance Through Measurement: The Application of Lean Production and Organizational Learning Principles', International Group for Lean Construction 8th Annual Conference, 2000
  12. Olve, N. G., Roy, J., and Wettet, M., Performance Drivers, 갈렙앤컴퍼니, 송경근(역), BSC 구축 & 실행사례, 한언, 2000
  13. Russell, J. S., Jaselskis, E. J. and Lawrence, S. P., 'Continuous Assessment of Project Performance', Journal of Construction Engineering and Management, Vol.123, No.1, 1997, pp.64-71 https://doi.org/10.1061/(ASCE)0733-9364(1997)123:1(64)
  14. The KPI Working Group, KPI Report for The Minister for Construction, Department of the Environment, Transportation and the Regions, U.K., 2000
  15. http://www.constructingexcellence.org.uk
  16. http://www.cii-benchmarking.org